HomeMy WebLinkAbout153ROOF FRAMING NOTES:
SEE SHEET 5T100 FOR FRAMING 5C:HE ES SUCH A5 STUD WALL. SHEAR WALL. FASTENING. WOOD
SHEATHING. CONCRETE BLOCK WALL REINFORCING AND 5TRUCTURAL MEMBER 5CHEDULE5.
SEE SHEET ST101 FOR COMPLETE STRUCTURAL NOTES.
PROVIDE ROOF TRU55 LATERAL BRACING PER DESIGN OF TRU55 MANUFACTURER.
PROVIDE END GABLE ROOF TRUSSES W/ VERTICAL MEMBERS (012 BLOCKING) @ 16o4. FOR EXTERIOR
MATERIAL FASTENING.
PROVIDE 5/8' ROOF SHEATHING @ SLOPED ROOFS E 3/4' ROOF SHEATHING @ FLAT ROOFS.
SLOPE TOP CHIORD5 OF FLAT ROOF TRUSSES TO ROOF DRAINS. SEE ARCHITECTURAL ROOF PLANS.
PROVIDE ROOF SHEATHING CLIPS.
PROVIDE ADDITIONAL STUDS @ HEADER/GIRDER TRU55 BEMNG PER NOTES IN 'WOOD FRAMING'
ON 5TRUCTWAL NOTES SHEET 5T101.
INTERLOCK INTERIOR STUD WALL TOP Ips W/ EXTERIOR WALL TOP ►ps.
PROVIDE CONTINUOU5 2x6 P.P.T. fp ANCHORED TO BOND BEAM @ TOP OF ALL BLOCK BEARING WALLS.
REC. - INDICATES 12ECE55ED HEADER. PROVIDE STEPPED TRU55 BEARING FOR HEADER 51ZE
INDICATED ON PLAN.
GL. TO COORDINATE ROOF TOP UNIT LOCATIONS E INSTALLATION W/ ROOF TRUSS MANUFACTURER
E HVAC CONTRACTOR. PROVIDE ALL REQUIRED BLOCKING IN ROOF TRU55 SPACE FOR OPENINGS E
MOUNTING OF RTUs. PROVIDE GIRDER TRUSSES IF REQUIRED.
AT NO TIME DURING CON5TRUCTION SHALL SPECIFIED ROOF LIVE LOADS BE EXCEEDED. 5EE SHEET
5T101 FOR SPECIFIED LIVE LOADS.
TRU5S BEARING ELEVATION - 109-4 UNLE55 INDICATED OTHERWISE ON PLAN.
INDICATES VALLEY TRUSSES @ 24o.0. ON TOP OF MAIN ROOF TRU55E5. ROOF TRUSS
MANUFACTURER TO VERIFY LOCATIONS WITH TRUSS DESIGN. INSTALL SHEATHING ON
MAIN ROOF TRUSSES PRIOR TO ERECTING VALLEY TRU55E5. PROVIDE OPENINGS THRU
ROOF SHEATHING TO VENT VALLEY TW55 SPACE.
El
F
K
4—j
W
E
4-j
C)
ce
N
L
U
u
Architecture
1414 UNDERWOOD AVE.
WAUWATOSA, WI 53413
4 1 4. 4 3 1. 3 1 3 1 T E L
41 4.431 .0531 FAX
WWW . A G A R C H. C O M
A r c b i t e c t u r e
E n g i n e e r i n g
P l a n n i n g
REVISIONS
.,� ,sem•°�a[��
THIS DRAWING, ITS DESIGN CONCEPT AND ITS DETAIL ARE
THE SOLE PROPERTY OF AG ARCHITECTURE, INC. AND SHALL
NOT RE COPIED IN ANY FORM OR MANNER WITHOUT
WRITTEN Akrn#ORIZATTON OF ITS DESI iNER/CREATOR
DRAWN BY
M.A.B.
Hrrl
DATE
G _ 01 AUG 2011
PROJECT
_ 071101
SHEET NO.
1/8" ROOF FRAMING PLAN
SS211
SKILLED