Loading...
HomeMy WebLinkAbout67TRI ELI z \m - N w- \ LU Cr 2 N In co \ f\ ~ N , o .. _j w> >. J Q am JU w(j) 1— o m faa U J H m J I— a .r; L� a CL of CZ] 3 0W p waa () U (A fr W U U Tal U J UI—m Q mJQ a z � >ii Um In O 0 O o O Cr < < Q Q Q U o z Z Z as C9 E l—W --am i mww MENU i aQ Baa Y Amy Y Y IaJ Q 0 D: X f mxX N � � N \ J J W m (r W F w J z>m o fr a 0 M Ld ZLU a� Z Loa- p0N a� Cc �5 J TRUJ55 BEARING _ {� --------------- ELEVATION ■ 114-4 T TRU_SS BEARING ELEVATION T 112-1i2 � _ FIRST FLOOR TOP OF SLAB AIK --------- ELEVATI - 'Iwo BALLAST ON c� EPDM MEMBRANE ON12 1/7 FIBERGLASS MAT ROOF BOARD DENS DECK) ON I SIONAL SHINGLES ON ITKZEE DIMENSIONAL 3/4' PLYWOOD ROOF SHEATHING ON WOOD ROOF TRUSSES: PITCH TOP CHORD OF ROOF CII115 DT!2ICM_w/ INTEGRAL DRAINAGE t %7 ROOF SHEATHING WITH I"� TRUSS 1/4- PER FOOT TO ROOF DRAINS I � 12 WOOD ROOF R -3B BLOWN INSULATION I - — - — - — - -- R -3B BATT INSULATION 6 MIL VAPOR BARRIER i ! RESILIENT CHANNELS @ 17 D.C......... 1 6 MIL VAPOR BARRIER i RESILIENT CHANNELS @ 12' O.C. 5/6- FIRE RATED DRYWALL 6 i J % FIRE RATED DRYWALL (I HOUR FIRE RESISTIVE PER U --P531) I I I HOUR FIRE RESISTIVE PER I TOP CHORD ELEVATION VARIES - I I U. -P531 I I SEE ROOF PLAN FOR BASELINE I I ELEVATIONS SPRAY IARRIER I I I I I I 10-61/z I I I I C ` '. r r I r STEEL BEAM - SEE STRUCTURAL PROVIDE I -NOIR SPRAY APPLIED FIRE PROTECTION SEE HVAC 2 12 i I SUSPENDED ACOUSTIC TILE 2-0 9 Architecture 1414 UNDERWOOD AVE. WAUWATOSA, WI 53213 4 1 4. 4 3 1. 3 1 3 1 T E L 414.431 .0531 FAX WWW . A G A R C H. C O M A T c h i t e c t u T e E n g i n e e r i n g 3- FIBERGLASS BOARD P I o n n i n g INSULATION w/ CLIPS TRUSS DEyARING {� ELEVATION ■ 114-4 T REVISIONS TR_U55 BEARING- — p ELEVATION . 1112-IY2 c� I CII115 DT!2ICM_w/ INTEGRAL DRAINAGE t c� 7 EXPANDED i I POLYSTYRENE INSULATION ON I I U SPRAY IARRIER L o °) RESISTIVE ON SUSPENDED o CONCRETE MASONRY .� U I ACOUSTIC TILE (( OU FIRE RESISTIVE per I I m C: O U � a) s E (tU I I 9 Architecture 1414 UNDERWOOD AVE. WAUWATOSA, WI 53213 4 1 4. 4 3 1. 3 1 3 1 T E L 414.431 .0531 FAX WWW . A G A R C H. C O M A T c h i t e c t u T e E n g i n e e r i n g 3- FIBERGLASS BOARD P I o n n i n g INSULATION w/ CLIPS TRUSS DEyARING {� ELEVATION ■ 114-4 T REVISIONS TR_U55 BEARING- — p ELEVATION . 1112-IY2 BUILDING SECTION 3/8" BUILDING THIS DRAWING, ITS DESIGN CONKER AND ITS DETAIL ARE THE SOU PROPERTY OF AG ARCHITECTURE, INC. AND SNAIL NOT RE COPIED IN ANY FORM OR MANNER WITHOUT WRITTEN AUTHORIZATION OF ITS DESIGNER/CREATOR DRAWN BY DRUM DATE 01 AUG 2011 PROJECT 071101 SHEET NO. SECTIONS AC613 I CII115 DT!2ICM_w/ INTEGRAL DRAINAGE t 7 EXPANDED i I POLYSTYRENE INSULATION ON I I SPRAY IARRIER RESISTIVE ON SUSPENDED CONCRETE MASONRY I ACOUSTIC TILE (( OU FIRE RESISTIVE per I I 19 170 I I SIM. BAR i i CORRIDOR 18 C63 ! ! I I C47 170 GAS FIREPLACE per I I SECTION 10300 4' CONCRETE SLAB W/ 6X6 WIA X INIA W.W.F. C!j 10 MIL VAPOR BARRIER ON 6 MINIMUM COMPACTED DRAINAGE FILL 15 FIRST FLOOR —_—_— — TOP OF" — - — - -- --------- 4 ELEVATION 100-0 7 EXTRUDED POLYSTYRENE PERIMETER INSULATION - EXTEND 7-0' MINIMUM HORIZONTAL It VERTICAL TO TOP OF FOOTING BUILDING SECTION 3/8" BUILDING THIS DRAWING, ITS DESIGN CONKER AND ITS DETAIL ARE THE SOU PROPERTY OF AG ARCHITECTURE, INC. AND SNAIL NOT RE COPIED IN ANY FORM OR MANNER WITHOUT WRITTEN AUTHORIZATION OF ITS DESIGNER/CREATOR DRAWN BY DRUM DATE 01 AUG 2011 PROJECT 071101 SHEET NO. SECTIONS AC613