HomeMy WebLinkAbout182NOTES: NOTES:1. REQUIRED PLUMBING
1. TRUSS BLOCK MAY CONSIST OF EITHER A WOOD STRUCTURAL PANEL OR PREFAB TRUSS BLOCK — INSTALL AND FASTEN AS SHOWN U.N.O. BENDS IN VERTICAL STACK
2. TOP CHORD OF WOOD STRUCTURAL PANEL MUST BE VERTICAL WHEN INSTALLED UNDER LOAD BEARING WALLS. OTHERWISE TOP CHORD SHALL BE DONE AS SHOWN.
DO NOT GO THROUGH
MAY BE VERTICAL N OR HORIZONTAL ® . STUDS.
3. TRUSS MANUFACTURER TO DESIGN PREFAB TRUSS BLOCK FOR LATERAL FORCE AS NOTED BELOW. TOP CHORD BEARING TOP CHORD BEARING
FLOOR TRUSS FLOOR TRUSS
FASTEN TOP CHORD
OF PANEL IN ACCORDANCE
W/ BOTTOM PLATE NAILING i
OF SHEARWALL BELOW
STUD PACK i STUD PACK
SOLID 2X BLOCKING
� J
AT EACH EDGE OF
WOOD STRUCTURAL PANEL.
VERTICAL BLOCKING MAY i FASTEN BOTTOM CHORD
BE OMITTED WHERE WALLS I OF PANEL IN ACCORDANCE FASTEN BOTTOM CHORD i
ABOVE BLOCK ARE NOT i W/ BOTTOM PLATE NAILING OF PREFAB TRUSS PANEL i ,' SEE STUD SCHEDULE
BEARING AND PANEL I OF SHEARWALL BELOW. TO TOP PLATE IN i AND SHEAR WALL
HEIGHT IS 16" OR LESS. 6'���:� ACCORDANCE W/ i SCHEDULE AS NOTED
•1 ' i
i
15/32" SOLID WOOD STRUCTURAL ROOF DETAILS. ON PLANX1: 12'-0" MAX.
PANEL W/ .148" OX3" NAILS AT 2" O.C. NOTE: TRUSS MFGR. TO DESIGN
AT ALL EDGES. PREFAB TRUSS PANEL FOR 1.0 KIP i
LATERAL LOAD. (U.N.O.) i
WOOD STRUCTURAL PANEL TRUSS BLOCK PREFAB ROOF TRUSS BLOCK
TYPICAL TRUSS BLOCK 6 TYP. PLUMBING CHASE FRAMING 2
UNIT TRUSS, SEE STUD AND SHEARWALL
FLOOR SHEATHIN CORRIDOR TRUSS SCHEDULE AS NOTED ON PLAN.
OR GIRDER TRUSS
SEE PLAN
COUPLING SLEEVE
WATER CLOSET
F —
FLOOR SHEATHING CONT. 1X FILLER. I RISER LINE. FLOOR SHEATHING
SEE SPECS. SEE SPECS.
r r
� r
� — — � � ' Project
J
DEPTH OF UNIT TRUSS, I 11
CORRIDOR TRUSS OR OPEN CHASE BARRINGTON
GIRDER TRUSS , I
TUB/ SHOWER AND
MINUS 3" (MIN.) I I LAVATORY RISER LINE. at CARMEL
RE: TRUSS MANUF.
I
CORRIDOR TRUSS 2'-0" HOLD FLOOR TRUSS
SEE PLAN. SEE PLAN.
CONT. "L" METAL W/ #10 CARMEN, INDIANA
TEK SCREW @ EACH STUD.
ADJUST HEIGHT AS REQUIRED LECESM CaN8TRLT" CMAW
FOR CEILING ATTACHMENT
TRUSS MECH. CHASE 5
I
12"t GAP IN WALL I �
0
BOTTOM PLATE AT WALL STUDS
EXPANSION JOINT �
(TYP.)
� SEE STUD AND SHEARWALL
I i
SCHEDULE AS NOTED ON PLAN.
CONSULTING
I I
3/4" TEMPORARY WALL BOTTOM PLATE ENGINEERS
EXPANSION JOINT
AT 8 0' I N E RVALS (� P') CORRIDOR i i UNIT BATHROOM s�rxucrDx.41. CONSULTANTS nssoclnTes,lrrc.
12511 Emily Court
I
Sugar Land, Texas 77478
WITHOUT BLOCKING IN PLACE THE PLUMBING 713.779.7252 800.422.7252
WASTE/ VENT RISER CAN BE PREASSEMBLED FAX: 713.779.1173
I
AND PUT IN PLACE AS ONE PIECE AT EACH email: sca@scahouston.com
FLOOR AS SHOWN. www.scaengineers.com
SHIP RISER IN WALL 2" TO 3" LONGER IF Louisville, Kentucky 502.426.6789
WOOD STRUCTURAL PANEL
FLOOR SHEATHING � I CONCERNED WITH ACTUAL LENGTH Orlando, Florida 407.893.6200
REQUIRED AT JOB SITE.
FLOOR TRUSS AT--/
EXPANSION JOINT DO NOT ATTACH DECK TO TRUSS
Copyright @ SCA Consulting Engineers
UNTIL AFTER BUILDING IS CLOSED IN," This document is copyrighted and is an instrument of
THEN NAIL FLOOR DECK AND FILL SEE STUD AND SHEARWALL service for the specific project for which it was prepared.
tHd EXPANSION JOINT WITH WOOD STRIP
OR NON—SHRINK GROUT I SCHEDULE AS NOTED ON PLAN. Reuse, copying or modification of this document whether in
hard copy or electronic format other than for the specific
(PROVIDE 1/8" SPACING AT purpose intended, without written permission from SCA
PANEL ENDS AND EDGES). Consulting Engineers is a violation of federal copyright law.
The ideas, concepts, inventions or methods described herein are Patent
INSTALL BOTTOM PLATE FILLER BLOCK AND DOUBLER TO SPLICE BOTTOM PLATE, Pending and are the sole property of SCA Consulting Engineers.
AFTER NAILING FLOOR DECK WHEN BUILDING IS "CLOSED IN."
I I ISSUE DATES
I
Design Development �►t�11f��++ tl
TEMPORARY EXPANSION JOINT DETAIL AT FLOORS 4 06-06-11
Bid Issue 4�*>`��--*xSTEi'
xxxxx -y'
Permit Issue
08-01-11 0100 1 98� i
Construction =
Issue
xxxxx
CONT. 1X FILLER. COUPLING SLEEVE
WATER CLOSET
WOOD STRUCTURAL PANEL
�t�rttsttt
FLOOR SHEATHING — RISER LINE. FLOOR SHEATHING
SEE SPECS. Revisions
FLOOR SHEATHING
I SEE SPECS.
DRAINAGE HOLE THROUGH
FLOOR. PLUG LATER
(AFTER BUILDING IS "CLOSED IN")
WITH WOOD DOWEL OR NON—SHRINK GROUT.
r
r
I �
TYPICAL FRAMING DETAILS
TUB/ SHOWER AND
WOOD STRUCTURAL PANEL BACKER PLATE; LAVATORY RISER LINE.
SCREW—GLUE TO UNDERSIDE OF FLOOR
BEFORE PLUGGING HOLE TO SUPPORT WOOD
DOWEL OR GROUT REPAIR. CORRIDOR TRUSS 1 I 2'-0" HOLD VFLOOR TRUSS
SEE PLAN. SEE PLAN.
I
SEE STUD AND SHEARWALL
SCHEDULE AS NOTED ON PLAN. SCALE: 1' = T -O'
Drawn LHB Project 211071
Check Sheet
DRAINAGE HOLE THROUGH FLOOR 3 PLUMBING WASTE/ VENT RISER 1 Date IS8.2
1
DRAWING NAME 211071 S821.dwg7-29-11 6:12PM begnoudl