HomeMy WebLinkAbout1g
�r
a
nn
cn �n g
¢gym y—c5
o F c =6
V�1 AUG p Z3
p q
Checked By
V) Z
N U
?
T.G.S.
z�
U�
w
G.) o
0
o
�4—illa
a
ut
Uz
8LUIL,
a�
cc
;..4 -
f+
1= _
4
O U
W
80
U ago
q h
�
g
�
vJz
s�
-
U�
x
�
as
t
co
F-
0
g
�r
a
nn
cn �n g
¢gym y—c5
o F c =6
V�1 AUG p Z3
TM
TM
Al
Scope Drawingsi
These drawings Indicate the general scope of the project
In terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the tradecontractors shall `urnlsh all items required for the
proper execution and compleCcn of the work.
Revislonsi
Issue Date
Drawn By
Checked By
07/06/12
D.T.C.
T.G.S.
F
O
cc
Lu L
2 f+
f+
1= _
a
0
C
cv
�
as
t
F-
co
TM
TM
Al
Scope Drawingsi
These drawings Indicate the general scope of the project
In terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the tradecontractors shall `urnlsh all items required for the
proper execution and compleCcn of the work.
Revislonsi
Issue Date
Drawn By
Checked By
07/06/12
D.T.C.
T.G.S.
Drawing Tltlee I
FOUNDATION
PLAN
Drawing Number,
OL -F1.1
Project Number,
12-065