Loading...
HomeMy WebLinkAbout12GOOF PENETRATION )7 92 OO.0 )7 62 00.8 )7 54 23.A )7 54 23.B NU I t: )5 31 OO.A PROVIDE CRICKETS AS REQUIRED AT ALL ROOF MOUNTED ITEMS AND OTHER MISCELLANEOUS PENTRATIONS. TYP ROOF PENETRATION SCALE: NTS ROOF HATCH SECTION DETAIL SCALE: 1" = 1'-0" 07 72 OO.A 06 10 OO.A 07 54 23.A 07 54 23.8 05 31 OO.A 05 12 OO.A ROOF PLAN �01 SCALE: 1/8" = 1'-0"UU NORTH 11 GENERAL NOTES: A. ALL DIMENSIONS ARE FROM FACE OF STUD, OR FACE C.M.U. ANY DIMENSIONS NOT SHOWN OR DEEMED QUESTIONABLE ARE TO VERIFIED BY ARCHITECT/DESIGNER. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND INSTALLATION. DO NOT SCALE DRAWINGS. B. PROVIDE WOOD BLOCKING SUPPORTS AS REQUIRED FOR ALL SURFACE MOUNTED ITEMS. C. COORDINATE WORK OF THIS TRADE WITH OTHER TRADES. D. DOOR AND FRAME NUMBERS CORRESPOND TO ROOM NUMBERS. WHERE MORE THAN ONE DOOR OCCURS IN A ROOM, A SUFFIX HAS BEEN ADDED (I.E. 100A). SEE DIVISION 500 DRAWINGS FOR DOOR SCHEDULE. E. PROVIDE MISCELLANEOUS METAL SUPPORT FOR ALL CEILING SUSPENDED ITEMS. F. APPLY SEALANT AT ALL JUNCTURES BETWEEN DIFFERENT MATERIALS (I.E. STOREFRONT AND PRECAST). G. APPLY SEALANT AT ALL PLUMBING FIXTURES AT JUNCTURE WITH WALL. H. APPLY SEALANT AT ALL COUNTERTOPS AND BACK SPLASHES AT JUNCTURE WITH WALL. I. ALL STEEL STUDS ARE TO BE BRACED ACCORDING TO MANUFACTURER'S LIMITING HEIGHT L/240. J. NOT USED. K. ALL INTERIOR WALLS SHALL BE MARKED IN PLACE PRIOR TO FRAMING FOR ARCHITECT/DESIGNER TO REVIEW. L. ALL DOORS MUST BE INSTALLED WITH AT LEAST THE MINIMUM MANEUVERING CLEARANCE AT THE DOOR APPROACH PER THE MOST CURRENT AMERICANS WITH DISABILITIES ACT. M. NOT USED N. UNDERSIDE OF ALL SHAFTS TO RECEIVE 1-1/2 HOUR SHAFTWALL HUNG HORIZONTAL IN OPENING IN LOWEST FLOOR PENETRATED PLAN NOTES O ALIGN FINISH FACES. 0 STANDARD ROOF DRAIN AND OVERFLOW DRAIN. SEE DETAIL 4/A203. O EDGE OF CANOPY. O4 ROOF HATCH. SEE STRUCTURAL DRAWINGS FOR EXACT LOCATION. SEE DETAIL 2/A203. O5 ROOF TOP MECHANICAL UNIT OR EXHAUST FAN LOCATION ON CURB. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION. sA 8" WIDE x 6" DEEP DOWNSPOUT 68 4" WIDE x 4" DEEP DOWNSPOUT O MINIMUM EQUIPMENT CLEARANCES. O ROOF PENETRATION. SEE DETAIL 3/A203. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. O9 VERTICAL STEEL LADDER. SEE SPECIFICATION SECTION 05 50 00. 10 ROOF HATCH UNIT. SEE SPECIFICATION SECTION 07 72 00. 11 ROOF CRICKET 12 DRIVE -UP WINDOW SYSTEM BY TENANT. VERIFY SIZE AND CONFIGURATION. 13 RECESSED FLOOR SLAB. COORDINATE WITH EQUIPMENT REQUIREMENTS. SEE STRUCTURAL. 14 MECHANICALLY ATTACHED MEMBRANE ROOF SYSTEM. 15 SCUPPER AND CONDUCTOR HEAD. DESIGN AND INSTALL IN ACCORDANCE WITH SMACNA STANDARDS AND APPLICABLE CODES. KEYNOTES DIVISION 5 — METALS 05 12 ODA STRUCTURAL STEEL FRAMING MEMBER. REF. STRUCTURAL DRAWINGS. 05 31 ODA STEEL DECKING. REFERENCE STRUCTURAL DRAWINGS. DIVISION 6 — WOOD, PLASTICS AND COMPOSITES 06 10 OOA FIRE AND PRESERVATIVE TREATED WOOD BLOCKING/NAILER. DIVISION 7 — THERMAL AND MOISTURE PROTECTION 07 54 23A MECHANICALLY ATTACHED WHITE TPO ROOF MEMBRANE SYST.EM 07 54 23.B R-19 POLYISOCYANURATE ROOF INSULATION 07 72 00A ROOF HATCH. 07 92 OO.0 WATER CUT OFF MASTIC. Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and eIectrica'. systems. The drawings do not necessarily ird cote or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish alp items required for the proper execution and completion of the work. Revisions: L N 07/06/12 AMI JBA Z u C �--�ton z Ell V w " A � in a; 0 in a all C 17- U V z _ C8 c • M PbA }{ �+ o a C3 ( w Lu 2 (00 O U U N ` W ti 06 Q Ell _ x �00 (0 J x M 00 o U 00 � o t O Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and eIectrica'. systems. The drawings do not necessarily ird cote or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish alp items required for the proper execution and completion of the work. Revisions: L Checked By 07/06/12 AMI JBA JER000go 4) Ell .v all C O _ ♦+ Im 'a C Lu 2 Cc O _a O a ` W Ell (0 m t r Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and eIectrica'. systems. The drawings do not necessarily ird cote or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish alp items required for the proper execution and completion of the work. Revisions: Issue Date Certified By: �,�xunuuuse, No. = AR00910036 STATE OF 44 Drawn By Checked By 07/06/12 AMI JBA JER000go Issue Issue Date Certified By: �,�xunuuuse, No. = AR00910036 STATE OF 44 Drawn By Checked By 07/06/12 AMI JBA JER000go Drawing Number: Project Number. 11140 4