Loading...
HomeMy WebLinkAbout14PARTIAL SECOND FLOOR REFLECTED CEILING PLAN SCALE: 1/8" = 1'-0" NORTH GENERAL CEILING NOTES 1. ALL RECESSED FIXTURES AND SPRINKLER HEADS IN CEILING TILE ARE TO BE CENTERED IN THE TILE UNLESS NOTED OTHERWISE. 2. GYP. BD. CEILING AND SOFFITS TO HAVE SMOOTH FINISH. UNLESS OTHERWISE NOTED. ALL GYP. BD. CEILINGS TO BE PAINTED. 3. ALL RECESSED FIXTURES IN CEILING TILE ARE CENTERED IN THE TILE UNLESS OTHERWISE NOTED. 4. SEE TENANT BUILD—OUT DRAWINGS FOR SUSPENDED ACOUSTIC PANEL TYPES AND LOCATIONS, AS WELL AS FINAL INTERIOR PARTITION LOCATIONS. 5. ALL GYPSUM WALLBOARD CEILINGS AND BULKHEADS SHALL BE PRIMED AND PAINTED. CEILING PLAN LEGEND 2' X 4' RECESSED FLUORESCENT LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS. 2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE. SEE ELECTRICAL LIGHT FIXTURE 2' X 4' RECESSED FLUORESCENT EMERGENCY LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS SUPPLY AIR REGISTER. SEE MECHANICAL DRAWINGS RETURN AIR GRILLE. SEE MECHANICAL DRAWINGS. ACCESS PANEL 1' X 4' SURFACE MOUNTED FLUORESCENT LIGHT. SEE ELECTRICAL DRAWINGS n LINEAR SUPPLY AIR REGISTER. SEE MECHANICAL DRAWINGS RECESSED DOWN LIGHT FIXTURE STAIR #2 RECESSED EMERGENCY DOWN LIGHT FIXTURE 11111111111A r1S2 FIRE SPRINKLER &RECESSED WALL WASHER WATER METER ROOM +9'_0• MEN 0 100-E 11 —0 L Y EXP—P 0 • PENDANT LIGHT FIXTURE OA - 1 ' 00 +9 —0 +9'-0" EXP LARGE PENDANT LIGHT FIXTURE WORK SPACE +8 —0 WOMEN UNISEX 120-0 + '-0' 100-D DECORATIVE CABLE PENDANT LIGHT FIXTURE TOILET 120-E WALL SCONCE '-0 FINISHED CEILING/ BULKHEAD ELEVATION ABOVE FINISHED FLOOR — +8'-6• ES AU ANT 1 0 EXP EXPOSED STRUCTURE 100 A_�EXP—P EXPOSED STRUCTURE — PAINTED OC 9 I I 1.5 FIRST FLOOR i1�REFLECTED CEILING PLAN Aqnr, I SCALE: 1/8" = 1'-0" NORTH gD.1 I I D.2 4.6 4.9 5 C51')O SUSPENDED ACOUSTIC PANEL CEILING AND GRID SUSPENDED GYPSUM BOARD CEILING—PAINTED Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural cements and the type of structural, mechanical and electrical systems. The are do not necessarily Irdlcate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all terns required for the proper execution and completion of the work. Revisions: Issue Date Ln o4a 07/06/12 JBA JER - 'o zM U w C A 0 :-J P4 0 0 0, o U C8t • M y{ cc En IM Lu 11) O UU 000w �ti Q 00 L . I- i v J V ti U� x� cc V M � � Ci o U L O N Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural cements and the type of structural, mechanical and electrical systems. The are do not necessarily Irdlcate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all terns required for the proper execution and completion of the work. Revisions: Issue Date Ln Checked By 07/06/12 JBA JER C � 0 cc IM Lu 11) O a E L W i cc V L Ell m � r r � Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural cements and the type of structural, mechanical and electrical systems. The are do not necessarily Irdlcate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all terns required for the proper execution and completion of the work. Revisions: Issue Date Drawn By Checked By 07/06/12 JBA JER Certifled By: R. T1 V%11111 ��unun�u�a�ii,�i It Aff No. AR00910036 STATE OF 7 r. J48F y �r Drawing Number: F OL=A205 Project Number. 11140