Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
26
GENERAL NOTES AND SPECIFICATIONS 1. ALL WORK SHALL CONFORM TO ALL LOCAL, STATE, AND NATIONAL CODES. EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. 2. THE MECHANICAL CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, AND INSPECTIONS REQUIRED FOR HIS WORK. 3. ALL MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK UNDER THE CONTRACT SHALL BE NEW, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED, AND TO THE EXTENT POSSIBLE, STANDARD PRODUCTS OF THE VARIOUS MANUFACTURES EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE CALLED FOR. 4. ANY EQUIPMENT OR MATERIAL DEVIATIONS FROM THAT SPECIFIED OR DETAILED ON THIS DRAWING SHALL BE SUBJECT TO THE APPROVAL OF THE ARCHITECT/ENGINEER. ALL PROPOSED EQUIPMENT DEVIATIONS SUBMITTED SHALL BE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED. 5. ALL MECHANICAL EQUIPMENT SHALL BE LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.). 6. THE MECHANICAL CONTRACTOR SHALL INSTALL EQUIPMENT AS SHOWN ON THE DRAWINGS ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS AND REPLACEMENT. PROVIDE PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL ALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND/OR WITH ALL APPLICABLE CODES AND STANDARDS. 7. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE INSTALLATION AND ROUTING OF ALL PROPOSED DUCTWORK, PIPING AND EQUIPMENT WITH THE EXISTING BUILDING STRUCTURE. 8. THE MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL HIS OWN SUPPORT EQUIPMENT. LOCATIONS SHALL BE COORDINATED WITH ALL CONTRACTORS PRIOR TO INSTALLATION. 9. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL POWER CONNECTIONS TO THE EQUIPMENT PROVIDED UNDER THIS CONTRACT. 10. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONTROL WIRING FOR HIS EQUIPMENT. 11. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. EXACT ROUTING OF DUCTWORK AND PIPING MUST BE DETERMINED IN THE FIELD. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING ANY DUCTWORK, PIPING OR EQUIPMENT. ANY DISCREPANCIES BETWEEN THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND THE EXISTING CONDITIONS OR DIMENSIONS SHALL BE REPORTED TO THE ENGINEER BEFORE THE PERFORMANCE OF ANY WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE THE CONTRACTOR'S ACCEPTANCE OF THE EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF HIS WORK. 12. DUCTWORK AND PIPING SHALL BE KEPT AS CLOSE AND HIGH AS POSSIBLE TO THE BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE IN ORDER THAT THE MAXIMUM AMOUNT OF SPACE IS AVAILABLE. ADDITIONAL OFFSETS, FITTINGS, ETC. NOT SHOWN BUT REQUIRED TO MAINTAIN MAXIMUM CLEARANCE SHALL BE PROVIDED AT NO ADDITIONAL COST, 13. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PATCHING, PAINTING AND CLEANING ASSOCIATED WITH THIS PROJECT UNLESS NOTED OTHERWISE. 14. PRIOR TO BIDDING, MECHANICAL CONTRACTOR IS TO VISIT SITE TO FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS. 15. PROVIDE A COMPLETE 1 -YEAR WARRANTY ON ALL LABOR AND MATERIALS. 16. CONTRACTOR SHALL FURNISH A BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR ALL EQUIPMENT TO THE OWNER UPON COMPLETION OF PROJECT. 17. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION. 18. THE MECHANICAL CONTRACTOR SHALL MAKE A COMPLETE REVIEW OF THE MECHANICAL PLANS, INCLUDING THE SCHEDULES AND DETAILS PRIOR TO INSTALLATION OF ANY MECHANICAL SYSTEMS AND SHALL RESOLVE ANY CONFLICTS WITH THE ENGINEER. 19. ALL DUCT SIZES SHOWN ARE FREE AREA SIZES. 20. COORDINATE THERMOSTAT MOUNTING HEIGHT WITH OWNER. 21. INSULATE ALL SUPPLY AND RETURN DUCT WITH 1-1/2" THICK, 3 LB DENSITY DUCTWRAP OR BOARD INSULATION. INSULATION FOR OUTDOOR DUCTWORK SHALL BE 3" THICK, 3 LB DENSITY DUCTWRAP OR BOARD INSULATION. IT SHALL BE COVERED WITH CORRUGATED ALUMINUM JACKET AND SEALED WEATHERTIGHT. INSULATION R -VALUES SHALL BE IN COMPLIANCE WITH INDIANA ENERGY CODE. 22. ALL DUCT TO BE CONSTRUCTED OF GALVANIZED STEEL SHEETS IN ACCORDANCE WITH SMACNA GAGES AND STANDARDS. SUPPLY DUCT JOINTS SHALL BE SEALED AIRTIGHT. ALL SQUARE BENDS OR ELBOW FITTINGS SHALL HAVE TURNING VANES. PROVIDE SPLITTER DAMPERS AT SUPPLY TEES AND EXTRACTORS AT ALL SUPPLY AIR BRANCHES. PROVIDE BALANCING DAMPERS IN ALL DUCTS WHERE REQUIRED FOR SYSTEM BALANCING AS SHOWN ON PLANS OR AS REQUIRED. 23. INSTALL FLEXIBLE DUCT CONNECTIONS AT THE SUPPLY AND RETURN DUCTWORK CONNECTIONS OF ALL AIR HANDLING UNITS. 24. PROVIDE FIRE DAMPERS AT ALL DUCT PENETRATIONS THROUGH THE FIRE -RATED WALLS AND SHAFTS AS SHOWN ON PLANS OR AS REQUIRED. PROVIDE RADIATION DAMPERS AT ALL DIFFUSERS/GRILLES MOUNTED IN FIRE -RATED CEILINGS AND CEILING ASSEMBLIES AS SHOWN ON PLANS OR AS REQUIRED. DAMPERS SHALL MAINTAIN RATING OF ASSEMBLY THAT THE DUCT PENETRATES. 25. PROVIDE ACCESS PANELS IN THE DUCTWORK FOR ALL FIRE DAMPERS OR OTHER DUCT MOUNTED EQUIPMENT. LOCATE ACCESS PANEL SO THAT ACCESS TO EQUIPMENT IS EASILY ATTAINED. 26. OUTSIDE AIR INTAKES SHALL BE LOCATED A MINIMUM OF 10 FEET FROM ALL EXHAUST DISCHARGE AND PLUMBING VENTS. 27. REPLACE ALL FILTERS JUST PRIOR TO ACCEPTANCE BY THE OWNER. MECHANICAL SYSTEMS AND EQUIPMENT METHOD OF COMPLIANCE: Prescrlptiv,N Energy Cost Budge© Thermal Zone 4C EXTERIOR DESIGN CONDITIONS Winter Dry Bulb: 21'F Summer Dry/WET Bulb -N/A INTERIOR DESIGN CONDITIONS Winter Dry Bulb, 70-F Summer Dry Bulb,75'F Relative Humidity:50'F AIIILDING HEATING LOAD:N/A Btu/Hr BUILDING COOLING LOAD:N/A Btu/Hr MECHANICAL SPACE CONDITIONING SYSTEM: Unitary {Unit Heaters Boiler -Not applicable to this project. Chiller -lot applicable to this project, EQUIPMENT EFFICIENCIES, Efficiencies are listed on equipment schedules - See drawings. EQUIPMENT SCHEDULES WITH MOTORS: See drawings for efficiencies. DESIGNER STATEMENT: To the best of my knowledge and belief, the design of this building complies with the mechanical system and equipment requirements of the Indiana Building Code, 2010 Edition. SIGNED rwe• DAND N. BARRENTOS nTU, PROFESSIONAL ENGKM MECHANICAL LEGEND QT THERMOSTAT ® SUPPLY DIFFUSER zRETURN DIFFUSER EA RECTANGULAR DUCT 1 BALANCING (VOLUME) DAMPER EUH ROUND FLEX DUCT FD RECTANGULAR DUCT - RISER FPM FIRE DAMPER GUH DUCT SMOKE DETECTOR C DIFFUSER TAG 275 DIFFUSER CFM LP CONDENSATE PIPING *t>0 SMOKE DETECTOR ANNUNCIATOR ABBREVIATIONS: AHU AIR HANDLING UNIT CFM CUBIC FEET PER MINUTE CU CONDENSING UNIT EA EXHAUST AIR EF EXHAUST FAN EUH ELECTRIC UNIT HEATER FD FIRE DAMPER FPM FEET PER MINUTE GUH GAS UNIT HEATER HP HEAT PUMP L LOUVER LP LIQUID PROPANE NG NATURAL GAS RA RETURN AIR RTU ROOFTOP UNIT OA OUTDOOR AIR PKG PACKAGE UNIT SA SUPPLY AIR GAS FIRED UNIT HEATER SCHEDULE TAG MANUF/MODEL # GAS TYPE MBH EFFICIENCY % CFM MAX/MIN WEIGHT VOLTAGE MOCP NOTES UH -1 REZNOR / UDBS-45 NATURAL 45 82 759/456 77 120/1 15 1,2,4,5,6 UH -2 REZNOR / UDBS-75 NATURAL 75 82 1265/759 94 120/1 15 1,3,4,5,6 NOTES: 1. PROVIDE WITH REMOTE MOUNTED THERMOSTAT. 2. PROVIDE CONTROLS TO RUN THREE UNITS OFF OF ONE THERMOSTAT. 3. PROVIDE DISCONNECT FOR SERVICING. 4. PROVIDE CONCENTRIC VENT KIT SIZED PER MFG RECOMMENDATIONS. 5. MAINTAIN MANUFACTURE RECOMMENDED CLEARANCES TO COMBUSTIBLES. 6. APPROVED EQUALI OTHER MANUFACTURERS MUST BE PRE -APPROVED BY ENGINEER. ROOFTOP UNIT WITH GAS HEAT SCHEDULE TAG MANUF/MODEL # TYPE NOMINAL SUPPLY OUTSIDE ESP FAN TOTAL SENSIBLE GAS HEAT REFRIGERANT CEILING 75 MCA MOCP WEIGHT 950 TAG SPACE MANUFACTURER & MODEL CAPACITY AIRFLOW AIR REF. MOTOR COOLING COOLING INPUT/OUTPUT CIRCUITS COOLL IING VOLT/PH (LBS) INSTALL PER THE MANUFACTURER'S RECOMMENDATIONS, MAINTAIN REQUIRED 2. INSTALL PER THE MANUFACTURER'S RECOMMENDATIONS, MAINTAIN REQUIRED NOTES MBH SERVEDER FOR MISMATCHED OR FTU -3 CLEARANCES FOR SERVICING. CLEARANCES FOR SERVICING. INACCURATE PART NUMBERS. 120 AC -1 MITSUBISHI / MSY-GE24NA 80 67 22.5 37.0 1,2,3,4,5 CU -1 MITSUBISHI / MUY-GE24NA 22.5 19 208/1 17.1 TONS CFM CFM IN W.C. HP MBH MBH MBH QTY NOT BE USED AS AN AMPS AMPS LBS. YES RTU -1 PANERA CARRIER 48TCEB063 5 2000 390 .5 1.5 61.9 47.7 115/93 1 1 75 1 SEER 208 /3 30.7 45 600 1,2,3,4,5,6,7,8, 9,10,11,12 RTU -2 PANERA CARRIER 48A5020 20 8000 1570 1 5 255 184 350-262.5/ 2 9,8 208/3 1 18.4 125 4800 1,2,3, 1,12 9,10,1 1,12 283.5 ,1 1, RTU -3 VERIZON CARRIER 48TCDD08 7.5 3000 300 .5 2 95.2 71 125/103 103 2 11 208 3 / 44.3 60 850 9,10,11,128, 9,10,1111,,12128, NOTES: 1. R -410A REFRIGERANT, 2. PR❑VIDE ENTHALPY ECONOMIZER AND BAROMETRIC RELIEF DAMPER 3. PROVIDE ROOF CURB WITH SPRING VIBRATION ISOLATORS. 4. PROVIDE CONDENSATE LINE AND TRAP. 5. PR❑VIDE A NEW SET OF FILTERS UPON COMPLETI❑N OF PROJECT. 6. PR❑VIDE 7 DAY DIGITAL PROGRAMMABLE THERMOSTAT. 7. PROVIDE DISCONNECT SWITCH. 8. PROVIDE CONVENIENCE OUTLET. 9. PROVIDE GAS PRESSURE REGULATOR SUITABLE FOR SITE GAS PRESSURE, 10, PR❑VIDE RETURN AIR SMOKE DETECTOR. 11. DESIGN CONDITIONS: AMBIENT; 95°F DB INDOORI 80°/67°F DB/WB 12. APPROVED EQUAL: OTHER MANUFACTURERS MUST BE PRE -APPROVED BY ENGINEER FAN SCHEDULE TAG MANUF/MODEL # TYPE CFM ESP VOLTS/PH HP/ WATTS RPM SONES NOTES EF -1 GREENHECK SP -A110 CEILING 75 .1 120/1 49 W 950 .8 1,2,3,4 SEER VOLT/PH MOUNTED MOCP REF. WEIGHT (LBS) NOTES 1. MOUNT ON ROOF CURB AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER. 29. CATALOG PART NUMBERS SHOWN ARE FOR DESCRIPTIVE AND NOTES: 1, PR❑VIDE BACKDRAFT DAMPER. 2. FAN SHALL OPERATE FROM WALL SWITCH. 3, PR❑VIDE VIBRATI❑N ISOLATION HANGERS. 4. APPROVED EQUAL: OTHER MANUFACTURERS MUST BE PRE -APPROVED BY ENGINEER. 28. TEST AND BALANCE SHALL BE PERFORMED IN ACCORDANCE WITH "AABC" REQUIREMENTS. DUCTLESS SPLIT AIR CONDITIONER MANUF/MODEL # CFM MAX STATIC PRESSURE SHALL BE MEASURED AND RECORDED INDOOR UNIT ALL OUTLETS ON EACH AIR CONDENSING UNIT TAG MANUFACTURE / MODEL # EAT DB 'F EAT WB .F TOTAL CAPACITY WEIGHT NOTES TAG MANUF/MODEL # TOTAL COOLING SEER VOLT/PH MCA MOCP REF. WEIGHT (LBS) NOTES 1. MOUNT ON ROOF CURB AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER. 29. CATALOG PART NUMBERS SHOWN ARE FOR DESCRIPTIVE AND QUALITY STANDARDS ONLY, MBH (LBS) INSTALL PER THE MANUFACTURER'S RECOMMENDATIONS, MAINTAIN REQUIRED 2. INSTALL PER THE MANUFACTURER'S RECOMMENDATIONS, MAINTAIN REQUIRED FOR ORDERING WITHOUT VERIFICATION. ENGINEER SHALL MBH BE RESPONSIBLE FOR MISMATCHED OR FTU -3 CLEARANCES FOR SERVICING. CLEARANCES FOR SERVICING. INACCURATE PART NUMBERS. 120 AC -1 MITSUBISHI / MSY-GE24NA 80 67 22.5 37.0 1,2,3,4,5 CU -1 MITSUBISHI / MUY-GE24NA 22.5 19 208/1 17.1 20 R-41 OA 119.0 1,2,3,4 28. TEST AND BALANCE SHALL BE PERFORMED IN ACCORDANCE WITH "AABC" REQUIREMENTS. AIR FLOW AND USE MANUF/MODEL # CFM MAX STATIC PRESSURE SHALL BE MEASURED AND RECORDED FOR ALL OUTLETS ON EACH AIR SYSTEM. PROVIDE INDOOR UNIT NOTES: OUTDOOR UNIT NOTES: COMPLETE TEST AND BALANCE REPORTS. 1,2,3 SG -1 SUPPLY GRILLE PRICE 520 50 7 3/4 x 7 3/4 6 x 6 1,2,3 8.5 RG -1 RETURN GRILLE PRICE 80 1. PROVIDE WITH A 7 -DAY PROGRAMMABLE THERMOSTAT. 1. MOUNT ON ROOF CURB AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER. 29. CATALOG PART NUMBERS SHOWN ARE FOR DESCRIPTIVE AND QUALITY STANDARDS ONLY, NOT TO BE USED 2. INSTALL PER THE MANUFACTURER'S RECOMMENDATIONS, MAINTAIN REQUIRED 2. INSTALL PER THE MANUFACTURER'S RECOMMENDATIONS, MAINTAIN REQUIRED FOR ORDERING WITHOUT VERIFICATION. ENGINEER SHALL NOT BE RESPONSIBLE FOR MISMATCHED OR FTU -3 CLEARANCES FOR SERVICING. CLEARANCES FOR SERVICING. INACCURATE PART NUMBERS. 120 1 NO 1600/300 3. PROVIDE WITH NEW FILTERS UPON COMPLETION. 3. PROVIDE WITH LIQUID LINE FILTER DRIER AND SIGHT GLASS. 45 1,2,3,4 VAV-1 CARRIER 35E SINGLE DUCT 4. PROVIDE CONDENSATE PUMP AND ROUTE TO DRAIN IN JANITORS CLOSET. 4. PROVIDE ACCESSORIES NECESSARY FOR LOW AMBIENT OPERATION TO 14'F. 30. FLEXIBLE DUCTWORK SHALL BE USED TO CONNECT BRANCH DUCTWORK TO AIR TERMINAL DEVICES. FLEXIBLE 5. APPROVED EQUAL: OTHER MANUFACTURERS MUST BE PRE -APPROVED BY ENGINEER. 1,3,4 DUCT SHALL NOT EXCEED 5'-0" IN LENGHT AND SHALL NOT BE USED AS AN ELBOW. 100 1 YES 1200/400 AIR TERMINAL SCHEDULE TAG USE MANUF/MODEL # CFM MAX PANEL SIZE NECK SIZE NOTES SD -1 SUPPLY DIFFUSER PRICE SCD 300 24 x 24 100 1,2,3 SG -1 SUPPLY GRILLE PRICE 520 50 7 3/4 x 7 3/4 6 x 6 1,2,3 8.5 RG -1 RETURN GRILLE PRICE 80 500 25 1X16 x 13 1X16 24 x 12 1,2,3 RG -2 RETURN GRILLE PRICE 80 1000 25 1X16 x 25 1X16 24 x 24 1,2,3 NOTES: 1, PROVIDE MOUNTING FRAME APPROPRIATE FOR CEILING TYPE, 2. DUCT SIZE TO MATCH DIFFUSER OR GRILLE NECK SIZE UNLESS OTHERWISE NOTED. 3, APPROVED EQUAL: OTHER MANUFACTURERS MUST BE PRE -APPROVED BY ENGINEER. VAV BOX SCHEDULE TAG MANUF/MODEL # TYPE SIZE INLET SIZE STATICELECTRIC PRESSURE IN. WC. SOUND ATTENUATION CFM MAX/MIN HEAT (KW) VOLTAGE/ PHASE MCA MOCP NOTES FTU -1 CARRIER 45J FAN POWERED 6 140 1 NO 2000/300 8.5 208/1 58.3 60 1,2,3,4 FTU -2 CARRIER 45J FAN POWERED 6 140 1 NO 2000/300 8.5 208/1 58.3 60 1,2,3,4 FTU -3 CARRIER 45J FAN POWERED 6 120 1 NO 1600/300 6 208/1 43.3 45 1,2,3,4 VAV-1 CARRIER 35E SINGLE DUCT 12 120 1 YES 2000/400 -- -- -- -- 1,3,4 VAV-2 CARRIER 35E SINGLE DUCT 10 100 1 YES 1200/400 -- -- -- -- 1,3,4 NOTES: 1. PROVIDE WITH REMOTE MOUNTED THERMOSTAT. 2. PROVIDE DISCONNECT FOR SERVICING. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR RUNNING ALL REQUIRED LOW VOLTAGE CONTROL WIRING. 4. APPROVED EQUAL: OTHER MANUFACTURERS MUST BE PRE -APPROVED BY ENGINEER. Scope Dnp These drawings indicate the general scope of the prof in terms of arcM'6ectarcl design concept. the dirnensimu of Urs building. the major archibcturd elerrwft and the type th structural, rr:ect:aniod and ebctr cd systema The drawings do not necessarily Indicate or describe dl work required for full parforrtronce and completion of the requirements of the Contract. On the basis of the general scope indi A or described. the trade contractors shall famish all items rwq,ied for the proper execution and oompWdon of the work. Revblora 1` o 4� � R Chocked JEW z N z Elmo C Ut W 4 A ~ V/ Ix 0 o In 0 o C 4" W O H C U ~� C8 to C W 9 (n LY (n LL4 �= IL OV W o 000 a ` ell/ 4 � W v, C ®� o6 � U VIlse U obi ►� xe M i � _ 0 n Scope Dnp These drawings indicate the general scope of the prof in terms of arcM'6ectarcl design concept. the dirnensimu of Urs building. the major archibcturd elerrwft and the type th structural, rr:ect:aniod and ebctr cd systema The drawings do not necessarily Indicate or describe dl work required for full parforrtronce and completion of the requirements of the Contract. On the basis of the general scope indi A or described. the trade contractors shall famish all items rwq,ied for the proper execution and oompWdon of the work. Revblora 1` Dram By Chocked JEW DMB Elmo C 4 cc� V C 4" W O C C o �o �= IL CNNE • ` ell/ 4 W W C ®� N VIlse = i r Scope Dnp These drawings indicate the general scope of the prof in terms of arcM'6ectarcl design concept. the dirnensimu of Urs building. the major archibcturd elerrwft and the type th structural, rr:ect:aniod and ebctr cd systema The drawings do not necessarily Indicate or describe dl work required for full parforrtronce and completion of the requirements of the Contract. On the basis of the general scope indi A or described. the trade contractors shall famish all items rwq,ied for the proper execution and oompWdon of the work. Revblora AECHANICAL NOTES SCHEDULES ftWA"I OL -M001 ;,,ao bow Data Dram By Chocked JEW AECHANICAL NOTES SCHEDULES ftWA"I OL -M001 ;,,ao By 07/06/14 JEW DMB AECHANICAL NOTES SCHEDULES ftWA"I OL -M001 ;,,ao