Loading...
HomeMy WebLinkAbout31E, FIRST FLOOR GAS PIPING PLAN SCALE: 1/8' = 1'-0' TRUE NORTH PLAN NORTH KEY NOTES O 1. SEE CIVIL PLAN FOR CONTINUATION. 2. GAS LINE SIZED AT THE FOLLOWING CONDITIONS: 2.a. 1 CFH = 1 MBH 2.b. 14" WG PRESSURE DOWNSTREAM OF METER 2.c. 0.5" WG PRESSURE DROP 3. SEE ROOF GAS PIPING PLAN FOR CONTINUATION. 4. SEE SECOND FLOOR GAS PIPING PLAN FOR CONTINUATION. 5. 1 1/2" G UP. 6. 1 " G UP. 7. OFFSET PIPE AS NECESSARY TO AVOID RUNNING PIPE IN FRONT OF 2ND FLOOR WINDOWS. GENERAL NOTES: 1. SEE MECHANICAL PLANS FOR ALL UNIT HEATER PERFORMANCE INFORMATION. 2. PROVIDE A SHUT—OFF VALVE WITHIN 6' OF ANY FUEL GAS APPLIANCE. 3. SEE P001 FOR MATERIAL AND INSTALLATION REQUIREMENTS. Soop Drawin" These d kndkab the generol scope of nns prajeat in terns a(�roMtectural design aonoept, the dtrrsneias of ane !wilding, the major aehbtecturd slerrwrb and the type of stnwtaml. mechanical and electrical systems. The draMnr do not necessarily indicots a describe all work ngisd for tole performance and completion of the requiremernfs of the Contrast. On the basis of the general scope irndreated or described„ the trade contractors *Mll furnish all items requked for tto proper execution and completion of the work. Revishm o � leave Date Dawn By 2 07/08/12 ORD JWM 2 V� W I� 0 o ion 0 14 H U2 ~C8 W O }M{ c pG m w ac �O o t C W I " tr a W � � cc d r ^ v U 0 E J f+ aro U00� �M N ♦ei a: 'cs V t 00 s N V Soop Drawin" These d kndkab the generol scope of nns prajeat in terns a(�roMtectural design aonoept, the dtrrsneias of ane !wilding, the major aehbtecturd slerrwrb and the type of stnwtaml. mechanical and electrical systems. The draMnr do not necessarily indicots a describe all work ngisd for tole performance and completion of the requiremernfs of the Contrast. On the basis of the general scope irndreated or described„ the trade contractors *Mll furnish all items requked for tto proper execution and completion of the work. Revishm leave Date Dawn By CMck.d By 07/08/12 ORD JWM I� C W O c IM C C ccWsells cc d ` C E f+ _ N ♦ei V t m m = r r Soop Drawin" These d kndkab the generol scope of nns prajeat in terns a(�roMtectural design aonoept, the dtrrsneias of ane !wilding, the major aehbtecturd slerrwrb and the type of stnwtaml. mechanical and electrical systems. The draMnr do not necessarily indicots a describe all work ngisd for tole performance and completion of the requiremernfs of the Contrast. On the basis of the general scope irndreated or described„ the trade contractors *Mll furnish all items requked for tto proper execution and completion of the work. Revishm Drawing N.abcn I-OLmP301-1 Protect Nwnbe DrawingTM& FIRST FLOOR GAS PIPING PLAN n 11140 leave Date Dawn By CMck.d By 07/08/12 ORD JWM Drawing N.abcn I-OLmP301-1 Protect Nwnbe DrawingTM& FIRST FLOOR GAS PIPING PLAN n 11140 DrawingTM& FIRST FLOOR GAS PIPING PLAN n 11140