FIRST FLOOR GAS PIPING PLAN
SCALE: 1/8' = 1'-0'
TRUE
NORTH
PLAN
NORTH
KEY NOTES O
1. SEE CIVIL PLAN FOR CONTINUATION.
2. GAS LINE SIZED AT THE FOLLOWING CONDITIONS:
2.a. 1 CFH = 1 MBH
2.b. 14" WG PRESSURE DOWNSTREAM OF METER
2.c. 0.5" WG PRESSURE DROP
3. SEE ROOF GAS PIPING PLAN FOR CONTINUATION.
4. SEE SECOND FLOOR GAS PIPING PLAN FOR
CONTINUATION.
5. 1 1/2" G UP.
6. 1 " G UP.
7. OFFSET PIPE AS NECESSARY TO AVOID RUNNING PIPE
IN FRONT OF 2ND FLOOR WINDOWS.
GENERAL NOTES:
1. SEE MECHANICAL PLANS FOR ALL UNIT HEATER
PERFORMANCE INFORMATION.
2. PROVIDE A SHUT—OFF VALVE WITHIN 6' OF ANY FUEL
GAS APPLIANCE.
3. SEE P001 FOR MATERIAL AND INSTALLATION
REQUIREMENTS.
Soop Drawin"
These d kndkab the generol scope of nns prajeat
in terns a(�roMtectural design aonoept, the dtrrsneias of
ane !wilding, the major aehbtecturd slerrwrb and the type
of stnwtaml. mechanical and electrical systems.
The draMnr do not necessarily indicots a describe all
work ngisd for tole performance and completion of the
requiremernfs of the Contrast.
On the basis of the general scope irndreated or described„
the trade contractors *Mll furnish all items requked for tto
proper execution and completion of the work.
Revishm
o �
leave Date
Dawn By
2
07/08/12
ORD
JWM
2
V�
W
I�
0
o ion
0
14
H
U2
~C8
W
O
}M{
c
pG
m w
ac
�O
o
t
C
W
I "
tr
a
W
� �
cc
d
r ^
v
U
0
E
J
f+
aro
U00�
�M
N
♦ei
a:
'cs
V
t
00
s
N
V
Soop Drawin"
These d kndkab the generol scope of nns prajeat
in terns a(�roMtectural design aonoept, the dtrrsneias of
ane !wilding, the major aehbtecturd slerrwrb and the type
of stnwtaml. mechanical and electrical systems.
The draMnr do not necessarily indicots a describe all
work ngisd for tole performance and completion of the
requiremernfs of the Contrast.
On the basis of the general scope irndreated or described„
the trade contractors *Mll furnish all items requked for tto
proper execution and completion of the work.
Revishm
leave Date
Dawn By
CMck.d By
07/08/12
ORD
JWM
I�
C
W
O
c
IM
C
C
ccWsells
cc
d
`
C
E
f+
_
N
♦ei
V
t
m
m
=
r
r
Soop Drawin"
These d kndkab the generol scope of nns prajeat
in terns a(�roMtectural design aonoept, the dtrrsneias of
ane !wilding, the major aehbtecturd slerrwrb and the type
of stnwtaml. mechanical and electrical systems.
The draMnr do not necessarily indicots a describe all
work ngisd for tole performance and completion of the
requiremernfs of the Contrast.
On the basis of the general scope irndreated or described„
the trade contractors *Mll furnish all items requked for tto
proper execution and completion of the work.
Revishm
Drawing N.abcn
I-OLmP301-1
Protect Nwnbe
DrawingTM&
FIRST FLOOR
GAS PIPING
PLAN
n
11140
leave Date
Dawn By
CMck.d By
07/08/12
ORD
JWM
Drawing N.abcn
I-OLmP301-1
Protect Nwnbe
DrawingTM&
FIRST FLOOR
GAS PIPING
PLAN
n
11140
DrawingTM&
FIRST FLOOR
GAS PIPING
PLAN
n
11140