HomeMy WebLinkAbout33V, G
1 112„
(SPACE 136
ROOF GAS PIPING PLAN
SCALE: 1/8w = 1'-0'
TRUE
NORTH
PLAN
NORTH
KEY NOTES O
1. SEE FIRST FLOOR GAS PIPING PLAN FOR CONTINUATION.
2. SEE SECOND FLOOR GAS PIPING PLAN FOR
CONTINUATION.
3. GAS PIPE STUB CAPPED FOR FUTURE RTU ADDITION.
GENERAL NOTES:
1. SEE MECHANICAL PLANS FOR ALL ROOFTOP UNIT
PERFORMANCE INFORMATION.
2. PROVIDE A SHUT—OFF VALVE WITHIN 6' OF ANY FUEL
GAS APPLIANCE.
3. SEE P001 FOR MATERIAL AND INSTALLATION
REQUIREMENTS.
so" Dmwk
mese dmw7aNdiwb nb general ec�pe of nN project
in tams of a rot deegn corrupt the dkneneioro of
the building, On major architecbwd dements and On type
of stnrcturd, nmdwical and deatrkal systems.
The drawings do not neceesorNy kK6cc to or dsecnI - oN
work required for fuN performanu and wM WU. of the
requkonmrts of the Conboct.
On the bodm of the gwwal scope k4coted or described,
the bads contractors shop fumieh all Nems required for the
proper execution and compktfon of the work
bm Date
Drawn By
Nu
07/08/12
ORD
Z
L7
0
C
U�
w
m
4-1
1:4
o C)
a.
NINO
C
W
U
aC8
yMt
'v
H
W
1:4
ti
C
0
o
p
oH
u
��
v
a
W
n
^
0
c
mc
N
u
xM
00
=
�
*+
m
0
N
V
so" Dmwk
mese dmw7aNdiwb nb general ec�pe of nN project
in tams of a rot deegn corrupt the dkneneioro of
the building, On major architecbwd dements and On type
of stnrcturd, nmdwical and deatrkal systems.
The drawings do not neceesorNy kK6cc to or dsecnI - oN
work required for fuN performanu and wM WU. of the
requkonmrts of the Conboct.
On the bodm of the gwwal scope k4coted or described,
the bads contractors shop fumieh all Nems required for the
proper execution and compktfon of the work
bm Date
Drawn By
Ch*4*od By
07/08/12
ORD
JWm
C
m
NINO
C
W
O
'v
H
goo
C
0
or
p
=
d
C
m
E
bm
c
mc
N
V
=
�
*+
m
Z
r
so" Dmwk
mese dmw7aNdiwb nb general ec�pe of nN project
in tams of a rot deegn corrupt the dkneneioro of
the building, On major architecbwd dements and On type
of stnrcturd, nmdwical and deatrkal systems.
The drawings do not neceesorNy kK6cc to or dsecnI - oN
work required for fuN performanu and wM WU. of the
requkonmrts of the Conboct.
On the bodm of the gwwal scope k4coted or described,
the bads contractors shop fumieh all Nems required for the
proper execution and compktfon of the work
bm Date
Drawn By
Ch*4*od By
07/08/12
ORD
JWm
ROOF
GAS PIPING
PLAN
�A`t1###111ft/lll!
4* •eeee��ST�eR��ew rf
PE 10410218 ? t�
Drowbg Nounben
OL—P303
-1
ti,ao