Loading...
HomeMy WebLinkAbout346" CAST—A—SEAL GASKET H-20 RATED TOP VIEW '" 1 1T 4 77n -r\/Mr- SIDE VIEW GREASE INTERCEPTOR CONSTRUCTION DETAIL SCALE: N.T.S. 6" CAST—A—SEAL GASKET 1/2" THREADED ROD ANCHOR TO STRUCTURE (TYPICAL OF 4) HOT SHUT—OFF T&P VALVE RELIEF VALVE GALVANIZED SAFETY PAN (SIZE AS REQ) \ 3/4" TREATED PLYWOOD/ (SIZE AS REQ) BOLT PLYWOOD TO UNISTRUT CHANNEL PRESSURE REDUCING VALVE WITH BY—PASS COLD PRESSURE SHUT—OFF GAUGE VALVE EXPANSION TANK ROUTE 1 " DRAIN LINE TO INDIRECT WASTE RECEPTOR, MOP SINK, FLOOR DRAIN, OR EXTEND TO THE EXTERIOR OF THE BUILDING AT 12" ABOVE GRADE. NOTE: CONTRACTOR SHALL DELETE UNISRUT AND PLYWOOD PANEL WHEN THE WATER HEATER IS INSTALLED ON THE FLOOR. WATER HEATER INSTALLATION DETAIL SCALE: N.T.S. Soopo Drowk" Theee drawsge indl0ate the gsnaol coops a 1M Pm1Kt in terms a ards7ectu.I design a«r 4 the dkrwmeiaro d the building, Ow major aaidsaurol elerrwds oW the type of stnrcwroi, me*"" and elscw"i systems. The aras�ings do not necessarily Wteote or describe all work rsgRnd for f.1 performance and eomplotion of the requirements a the Contract. On the basis of the general stops Wdcated or dsscrr'bed, the trade contractors shall furnish all items required for the proper execution and completion a the work. R�valomil 1` By INw Date Dawn By Chocked C Liu u C f+ 40 = C NINO �■■r C C C 0 O _w d ` Cam m Soopo Drowk" Theee drawsge indl0ate the gsnaol coops a 1M Pm1Kt in terms a ards7ectu.I design a«r 4 the dkrwmeiaro d the building, Ow major aaidsaurol elerrwds oW the type of stnrcwroi, me*"" and elscw"i systems. The aras�ings do not necessarily Wteote or describe all work rsgRnd for f.1 performance and eomplotion of the requirements a the Contract. On the basis of the general stops Wdcated or dsscrr'bed, the trade contractors shall furnish all items required for the proper execution and completion a the work. R�valomil 1` By INw Date Dawn By Chocked C � C f+ 40 = C NINO �■■r C C C 0 O _w d ` Cam m 40 CMC m F y+ CO) V V = y+ to ■� r IM' Soopo Drowk" Theee drawsge indl0ate the gsnaol coops a 1M Pm1Kt in terms a ards7ectu.I design a«r 4 the dkrwmeiaro d the building, Ow major aaidsaurol elerrwds oW the type of stnrcwroi, me*"" and elscw"i systems. The aras�ings do not necessarily Wteote or describe all work rsgRnd for f.1 performance and eomplotion of the requirements a the Contract. On the basis of the general stops Wdcated or dsscrr'bed, the trade contractors shall furnish all items required for the proper execution and completion a the work. R�valomil Dmwft T" By INw Date Dawn By Chocked Dmwft T" By 07/08/12 JEW DMB PLUMBING DETAILSPIL 94 cran.d eril •s� 1?15T � �e � ,�j Q it PE10411 021$ i ✓t?► , 11111 l"OLmP501-1 Dnwlip Nwnbon Project Ni■nbe n 11140