HomeMy WebLinkAbout35RTL
115
RTU -2
350 MBH
RTU -3
125 MB
__E SITE
_ITY PLAN
ONTINUATION
SUITE 1360
NATURAL GAS RISER DIAGRAM
SCALE: N.T.S.
1 —1 /9" N(-,
__E SITE
_ITY PLAN
ONTINUATION
SUITE 1364
NATURAL GAS RISER DIAGRAM
SCALE: N.T.S.
UH -2
75 MBH
UH -1
45 MBH
SUITE 1363
NATURAL GAS RISER DIAGRAM
SCALE: N.T.S.
G
PSIG
EE SITE
_ITY PLAN
ONTINUATION
75 MBH
2ND FLOOR
NATURAL GAS RISER DIAGRAM
SCALE: N.T.S.
16*99
EE SITE
_ITY PLAN
ONTINUATION
GENERAL NOTES:
1. SEE MECHANICAL PLANS FOIR ALL UNIT HEATER
PERFORMANCE INFORMATION.
2. PROVIDE A SHUT—OFF VALVE_ WITHIN 6' OF ANY FUEL
GAS APPLIANCE.
3. SEE P001 FOR MATERIAL AND INSTALLATION
REQUIREMENTS.
Scope Drawkp&
These drawinnggss indicate the general scope of the project
in terra of arohitea I design ca Wt. the dithe rtansians of
of structural, the
mechaniical andel electrical systernss. architectural elernents, the type
The drawinga
s do not necaartly indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described.
de cont
the traroctore shall furnish all items required for the
proper execution and completion of the work.
Rerlalonal
hese Date
ti.
C)
07/06/12
JM02
JWM
N v
o
4-JC�7
z"
U
W
C
cc
4-J
s� o`
a
w
~
b to
Elmo
2
4
W
C8V
wtw
II�
C
UU
000
t
O
cc
94 4 o6
d
(/1
x
c
E
�=
WW
>:
00
V
t
s
N
Scope Drawkp&
These drawinnggss indicate the general scope of the project
in terra of arohitea I design ca Wt. the dithe rtansians of
of structural, the
mechaniical andel electrical systernss. architectural elernents, the type
The drawinga
s do not necaartly indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described.
de cont
the traroctore shall furnish all items required for the
proper execution and completion of the work.
Rerlalonal
hese Date
ti.
Chocked By
07/06/12
JM02
JWM
C
cc
Elmo
C
W
0-C
II�
C
C
W
O
cc
x
d
as
c
E
�=
WW
V
t
�
y+
m
t
r
Scope Drawkp&
These drawinnggss indicate the general scope of the project
in terra of arohitea I design ca Wt. the dithe rtansians of
of structural, the
mechaniical andel electrical systernss. architectural elernents, the type
The drawinga
s do not necaartly indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described.
de cont
the traroctore shall furnish all items required for the
proper execution and completion of the work.
Rerlalonal
hese Date
Drawn By
Chocked By
07/06/12
JM02
JWM
Drawing Tltlei
NATURAL
GAS
RISER
DIAGRAMS
Certifled By.
���14ttt1ilitttlxf�j
PEI 91102115 .= N
4/1111111111%
S 10 SixG```�,,
+11111111
Drawing NumMrn
.OLmP603
Project Numben
11140