Loading...
HomeMy WebLinkAbout4I 1.2 I I I I 6 SPA. 0 5'-1" 20'-0" 4 SPS. @ 5-0" SECOND FLOOR, FRAMING PLAN, SCALE: 1/6' NOTES: I. TOP OF SLAB ELEVATION = +18'-ta 2. TOP OF STEEL (T/S) ELEVATION = 3. JOIST BEARING (J/B) ELEVATION = 4. INSTALL BRIDGING IN ACCORDANCE WITH S.J.I. SPECIFICATIONS. 5. VALUES NOTED AT BEAM ENDS ARE MAXIMUM SERVICE REACTIONS. MINIMUM DESIGN REACTION = 20 KIPS IF NO VALUE IS SHOWN 6. ALL STEEL WIDE FLANGES SHAPES SHALL CONFORM TO ASTM A992 GRADE 50. 7. LI INDICATES 8" DEEP BOND BEAM W/2-#5 CONT. PROVIDE 8" BEARING EACH END A MINIMUM. 8. —' INDICATES MOMENT CONNECTION. 9. c INDICATES HSS 6x6x I /4 COLUMN FOR BRICK SUPPORT. 5 6 1 1 -I 25-3 1/2" 3'-0 1/2"--L _ 7'-1' - I 1 I 5SPA @5 O II/16I I I E.O.S. II n If�9" MASONRY WALL SGHEDULF INDICATES 10" CMU REINFORCED W/ #6 0 32" O.G. U.N.O. INDICATES 8" CMU REINFORCED W/ #5 @ 40" O.G. U.N.O. Ir" r C C E cc Al Scope Drawings, These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems, The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revlslonse Issue Date o q N Checked By z ci T.G.S. cc O z J U w A, C ■_ N A x o W � a 0 tC cc U z `8 a �W C U U mo 3 w O F '-7 00 o aD N r ^ v J V TO U "~ H m� co O Ir" r C C E cc Al Scope Drawings, These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems, The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revlslonse Issue Date Drawn By Checked By 07/06/12 D.T.C. T.G.S. cc 4w A, C ■_ W 1.: 4 0 tC cc W113 L O Nina � � a (D0 C V . N a) s H co Ir" r C C E cc Al Scope Drawings, These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems, The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revlslonse Issue Date Drawn By Checked By 07/06/12 D.T.C. T.G.S. Drawing Tltlea SECOND FLOOR FRAMING PLAN Drawing Number, OL -S1.1 Project Number) 12-065