HomeMy WebLinkAbout4I 1.2
I
I
I
I
6 SPA. 0 5'-1"
20'-0"
4 SPS. @ 5-0"
SECOND FLOOR,
FRAMING PLAN,
SCALE: 1/6'
NOTES:
I. TOP OF SLAB ELEVATION = +18'-ta
2. TOP OF STEEL (T/S) ELEVATION =
3. JOIST BEARING (J/B) ELEVATION =
4. INSTALL BRIDGING IN ACCORDANCE WITH S.J.I.
SPECIFICATIONS.
5. VALUES NOTED AT BEAM ENDS ARE MAXIMUM SERVICE
REACTIONS. MINIMUM DESIGN REACTION = 20 KIPS IF NO
VALUE IS SHOWN
6. ALL STEEL WIDE FLANGES SHAPES SHALL CONFORM TO ASTM
A992 GRADE 50.
7. LI INDICATES 8" DEEP BOND BEAM W/2-#5 CONT. PROVIDE 8"
BEARING EACH END A MINIMUM.
8. —' INDICATES MOMENT CONNECTION.
9. c INDICATES HSS 6x6x I /4 COLUMN FOR BRICK SUPPORT.
5 6
1 1 -I
25-3 1/2" 3'-0 1/2"--L _ 7'-1' -
I 1 I
5SPA @5 O II/16I I I
E.O.S.
II
n If�9"
MASONRY WALL SGHEDULF
INDICATES 10" CMU REINFORCED W/ #6 0 32" O.G. U.N.O.
INDICATES 8" CMU REINFORCED W/ #5 @ 40" O.G. U.N.O.
Ir"
r
C
C
E
cc
Al
Scope Drawings,
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems,
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope Indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revlslonse
Issue Date
o q
N
Checked By
z
ci
T.G.S.
cc
O
z J
U w
A,
C
■_
N A
x
o
W
�
a
0
tC
cc
U z
`8
a
�W
C
U
U mo
3
w
O F
'-7
00
o aD
N
r ^
v J V
TO
U
"~
H
m�
co
O
Ir"
r
C
C
E
cc
Al
Scope Drawings,
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems,
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope Indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revlslonse
Issue Date
Drawn By
Checked By
07/06/12
D.T.C.
T.G.S.
cc
4w
A,
C
■_
W
1.: 4
0
tC
cc
W113 L
O Nina
�
�
a
(D0
C
V
.
N
a)
s
H
co
Ir"
r
C
C
E
cc
Al
Scope Drawings,
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems,
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope Indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revlslonse
Issue Date
Drawn By
Checked By
07/06/12
D.T.C.
T.G.S.
Drawing Tltlea
SECOND
FLOOR
FRAMING
PLAN
Drawing Number,
OL -S1.1
Project Number)
12-065