Loading...
HomeMy WebLinkAbout9Scope Drawings, These drawings Indicate thegenercl scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural eisments and the type of structural, mechanical and electrical systems. The drawings do not necessarily Indicate or describe all work required for full performance one completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish ad items required for the proper execution and completion of the work. Revisions, Issue Date v CheckedBy z D.T.C. T.G. Uw z� UA a �ti �a, i -J (D o 4-4 a 4) `8 a i H V 00 V 000 3 O H ac r 4) O 0 L �� - 2 0 Scope Drawings, These drawings Indicate thegenercl scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural eisments and the type of structural, mechanical and electrical systems. The drawings do not necessarily Indicate or describe all work required for full performance one completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish ad items required for the proper execution and completion of the work. Revisions, Issue Date Drawn By CheckedBy 07/06/12 D.T.C. T.G. 4) 4 r 4) O QLLI L 2 n a 4) O cc L as Cl) t r r Scope Drawings, These drawings Indicate thegenercl scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural eisments and the type of structural, mechanical and electrical systems. The drawings do not necessarily Indicate or describe all work required for full performance one completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish ad items required for the proper execution and completion of the work. Revisions, Issue Date Drawn By CheckedBy 07/06/12 D.T.C. T.G. S. Drawing Title J� STRUCTURAL DETAILS Drawing Numbers OL -S2.4 -, Project Numbers 12-065