Loading...
HomeMy WebLinkAbout2SECT ION E� SCALE: 3/4" - 1'-0" �F2. 1/2" EXPANSION — JOIN MATERIAL FILL WITH GROUT SEE Uw ARCH. Q z SEE (0:3 ARCW #40-6" @ 12" O.G. 3 MIN. @ DOORS (CENTER ON JOINT) SEE PLAN BRICK PER ARCH. SEE ARCH. 2 COURSES 8" CMU GROUT 50L I D I I FILL WITH GROUT I I FIN. FLOOR EL. ZI PER PLAN 0. FIN. GRADE OR o SIDEWALK EL. LU PER SITE DWG5 N T/FTG. EL. PER PLAN ° Z w E Q 4" CMU COURSE ° LU GROUT SOLID O = ° m U d LU LU rn METAL STUDS PER ARCH. 1/2"Ox(o" SIMPSON TITEN HD SCREW ANCHORS (OR EQUAL) @ 48" O.C. AND WITHIN 1'-0" OF ALL CORNERS. 10000M RIGID INSULATION PER ARCH. a #4 @ 48" D.C. MAX. AND WITHIN 8" OF ALL CORNERS AND OPENINGS. J2'-11" 1011 CONCRETE FOOTING PER PLAN SECT ION a� SCALE: 3/4" - 1'-0" F2.1 SEE PLAN SEE SEE PLAN PLAN COLUMN PER PLAN ---- i I SEE SHEET 52.2 FOR PER SITEoe- , , ooa COLUMN BASE DETAILS RIGID INSULATION -1 BASE qq'-4" PER ARCH. FILL WITH CONCRETE _ a Z U4 w 1,12" EXPANSION ° #4 @ 48" O.G. O - JOINT MATERIAL 1/2"0xb" SIMPSON FINISH FLOOR EL. H ZI PER PLAN z °d Q w 000 000 ° 0885 8 o8d5�8888�5 00 ����,,,,0��0,<,)� 1 000 000 ����,.,, b888° X0 880 N = • a U Elmo U N w s~ PER PLAN T/FTG. EL. uJ 113 v w PER PLAN a < ° 1'-0" OF ALL CORNERS. W /'1 ww 00 U d _ _ ° ° _ pO d ° ° c(i ° d d c = U ° d <04 BRICK PER ARCH. a ° °. li II C CONCRETE FOOTING U � O PER PLAN cn SECT ION E� SCALE: 3/4" - 1'-0" �F2. 1/2" EXPANSION — JOIN MATERIAL FILL WITH GROUT SEE Uw ARCH. Q z SEE (0:3 ARCW #40-6" @ 12" O.G. 3 MIN. @ DOORS (CENTER ON JOINT) SEE PLAN BRICK PER ARCH. SEE ARCH. 2 COURSES 8" CMU GROUT 50L I D I I FILL WITH GROUT I I FIN. FLOOR EL. ZI PER PLAN 0. FIN. GRADE OR o SIDEWALK EL. LU PER SITE DWG5 N T/FTG. EL. PER PLAN ° Z w E Q 4" CMU COURSE ° LU GROUT SOLID O = ° m U d LU LU rn METAL STUDS PER ARCH. 1/2"Ox(o" SIMPSON TITEN HD SCREW ANCHORS (OR EQUAL) @ 48" O.C. AND WITHIN 1'-0" OF ALL CORNERS. 10000M RIGID INSULATION PER ARCH. a #4 @ 48" D.C. MAX. AND WITHIN 8" OF ALL CORNERS AND OPENINGS. J2'-11" 1011 CONCRETE FOOTING PER PLAN SECT ION a� SCALE: 3/4" - 1'-0" F2.1 SEE PLAN SEE SEE PLAN PLAN COLUMN PER PLAN ---- i I SECTION E41� SCALE: 3/4" - I'-0" �F2. BRICK PER ARCH. bw PER SITEoe- , , ooa z - T/CONCRETE RIGID INSULATION -1 BASE qq'-4" PER ARCH. W _ a Z U4 w SEE PLAN ° #4 @ 48" O.G. O - MAX. AND WITHIN 1/2"0xb" SIMPSON T/FTG. EL. ° 8" OF ALL CORNERS H PER PLAN AND OPENINGS. in z J w w 1011 N = • U Elmo U N CONCRETE FOOTING s~ PER PLAN @ 48" O.C. AND WITHIN SECTION E41� SCALE: 3/4" - I'-0" �F2. BRICK PER ARCH. -4 (8 REQ D) _ WELD TO COLUMN # CAST BASE AROUND .III-1-1� III COLUMN - SEE SHEET 52.2 FOR COLUMN BASE DETAILS. a ° • ° d. ° •. d G ° d Q ° d ° ° 4 ° CONCRETE FOOTING PER PLAN S ECT I ON 5 SCALE: 3/4" - 1'-0" F2.1 SECT ION FB--- SCALE: 3/4" - 1'-0" �F2. VAULT. CONTRACTOR TO VERIFY W/MFR. FOR ALL CONC. SLAB CONNECTIONS AND/OR EMBEDS REQUIRED. VAULT SLAB FINISH FLOOR EL. REINF. SEE PLAN PER PLAN 0 p . d 000 508° 8088 . .O . ° a d d' ° ° a- a ° d d ° • °• • °• a U cn S ECT ION E6�� SCALE: 3/4" - I'-0" �F2. bw u O � 08/27/12 Z COLUMN PER PLAN �--� METAL STUDS z ° U W ~" r PER ARCH. SEE PLAN �_ O FILL WITH GROUT 1/2"0xb" SIMPSON SEE ARCH. V H OR CONCRETE z TITEN HD SCREW O w 5 ANCHORS (OR EQUAL) Elmo U 1/2" EXPANSION s~ @ 48" O.C. AND WITHIN uJ 113 v O j ! rx JOIN MATERIAL 1'-0" OF ALL CORNERS. 00 U �R 00 O N SEE SHEET 52.2 FOR BRICK PER ARCH. li II C COLUMN SASE DETAILS. FIN. FLOOR EL. � O rr t0 r Z PER PLAN a Q 000 000 00 SIDEWALK EL. °g°0� g°°°0° j / / �oo°0 LU PER SITE DWGS. ° ' RIGID INSULATION LU N a , PER ARCH. T/FTG. EL. d Z w PER PLAN ° a ° #4 @ 48" O.G. 4" CMU COURSE a °i ° a ° MAX. AND WITHIN p GROUT SOLID ° a 8" OF ALL CORNERS w FILL WITH GROUT ----Z ° ° ° AND OPENINGS. N 2 COURSES 8" CMU 14 ° °I ° d ° 12'—lin w GROUT SOLID+ Ia d I L J LU • i ° • ° •I ° ° ° � a• d a • d 10 u CONCRETE FOOTING tY PER PLAN WALL FOOTING U BEYOND m -4 (8 REQ D) _ WELD TO COLUMN # CAST BASE AROUND .III-1-1� III COLUMN - SEE SHEET 52.2 FOR COLUMN BASE DETAILS. a ° • ° d. ° •. d G ° d Q ° d ° ° 4 ° CONCRETE FOOTING PER PLAN S ECT I ON 5 SCALE: 3/4" - 1'-0" F2.1 SECT ION FB--- SCALE: 3/4" - 1'-0" �F2. VAULT. CONTRACTOR TO VERIFY W/MFR. FOR ALL CONC. SLAB CONNECTIONS AND/OR EMBEDS REQUIRED. VAULT SLAB FINISH FLOOR EL. REINF. SEE PLAN PER PLAN 0 p . d 000 508° 8088 . .O . ° a d d' ° ° a- a ° d d ° • °• • °• a U cn S ECT ION E6�� SCALE: 3/4" - I'-0" �F2. Scope Drawings, These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions, OWNER REVIEW 08/22/12 BID SET 08/29/12 Issue Date bw u O � 08/27/12 Z N v �--� z ° U W ~" r �_ O �o V H U z 914C8� O w 5 Elmo U U � s~ o on uJ 113 v O rx x 00 U �R 00 O N Scope Drawings, These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions, OWNER REVIEW 08/22/12 BID SET 08/29/12 Issue Date bw Checked By 08/27/12 D.T.C. T.G.S. r V C Elmo uJ 113 CC O 0 L �R cc C Q) � O rr t0 r Scope Drawings, These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope Indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions, OWNER REVIEW 08/22/12 BID SET 08/29/12 Issue Date Drawn By Checked By 08/27/12 D.T.C. T.G.S. Drawing TitleSTE- Certified By, FOUNDATION DETAILS Drawing Number ONB-F2.1 Protect Number. 12-116