HomeMy WebLinkAbout16DIMENSION LJNE ON TABLE A FOOTING REINFORCING LAP LENGTH EMBEDMENT LENGTH PLANS GRID LINE MASONRY WALL 1'-0" EMBED VARIES 1'-8" (SEE NOTE BELOW) #6 (SEE PLAN) REINFORCING 1'-2" SEE TABLE A 2'-4" 1'-6" (SEE MASONRY1'-4" �1 �„ (TYP) CMU PLAN) S� �1 FOR PIPES WITH LESS THAN 6" COVER 8" PIPE (SEE PLUMBING () BARRIER FILL 2'-0" (TYP) CONC Q u �4 N � v DOWELS TO 77 STEP TRENCH FOOTING 1'-0" EACH PLAN FOR LOCATION) EXCAVATION LIMITS _ >. U U MATCH PANELj EL TO FOOTING ^ REINFORCING FULLY o GROUTED : ° ° • - TABLE A FOOTING REINFORCING LAP LENGTH EMBEDMENT LENGTH 14 1'-4" 1'-0" 15 1'-8" 1'-0" #6 2'-0" 1'-2" #7 2'-4" 1'-6" 7-7 I LAP iSTD HOOK HOOK 1 1/2- KEYWAY Q9D H00 Lu F_ j HORIZ n HORIZ (TYP) v CONC SLAB REINF REINF p ON GRADE ``' s °- d a } p (CENTER IN CMU) I azo 4 , . _ ° 3 A d ° • . a ..- _ d �- • °. _ � CMU ELEVATION � '� F 4 _� ° . '. o - ° i •= FINISH FLOOR N N d ° a NOTE: VERT CONSTR -_---.---_—�_-- - 4 DIMENSIONS ON PLANS MAY 4 HORIZ ° JOINT DOWELS TO ° '_ "f H CMU PIP REINF �. ®' °- VARY 1 0 TO MATCH ° COMPRESSIBLE RUBBER ° (WALLS ONLY) MATCH AND �" .•' w ° CONC SLAB * 8 - MODULAR DIMENSIONS ON GRADE FTG REINF o PIPE (SEE SEAL EACH END LAP WITH TOP FOOTING (SEE PLAN FOR a do ---= EL TOP FOOTING MECHANICAL & '- (SEE MECHANICAL DOEWLS TO REINFORCIHORIZONTNG AL P5 7V _ PLANS) PLANS) MATCH AND ° N 14 AT 4'-( C ° EL 98 -8 LION WALL SECTION) '_° :'d z LAP WITH 3 Q i i i HORIZONTAL >> DOWELS (SAME SIZE °' d �_ • TOP REINFORCING' d • _Y w ��,, i i i REINFORCING •_ °- ��, a m ^ AS FTG REINF) TO �, WIDTH HORIZ �������►�*i�„\�`�� (SEE SCHEDULE) " - z LAP WITH FOOTING �) RIENF DEPTH EQUALS REINFORCING v TYP = THICKER ADJACENT FTG REINF NOTE: BOTTOM REINFORCING WALL SECTION LAP VARIES (SEE PLAN FOR ALL PIPES PASSING THRU (SEE SCHEDULE) �- 2' RIGID N FOOTING SEE TABLE A WAIL SECTION) WALL FOOTING FOUNDATION WALL SHALL NOT WIDTH (TYP) INSULATION (SEE PLAN FOR INTERRUPT VERTICAL REINFORCING FIELD GEOTECHNICAL ®. SIZE AND X co ENGINEER TO VERIFY 7 TYPICAL STEPPED FOOTING 4 REINFORCING) PIPE THRU WALL FOOTING 1 TYPICAL CONCRETE REINFORCING W J BOTTOM OF FOOTING ELEVATION AND BEARING EQ WALL THK EQ 2" NTS COORDINATE LOCATION WITH MECHANICAL PLANS 3/4" = 1'-0" NTSCAPAcny WITH N 0 GEOTECHNICAL CORNER BAR 0 Q ENGINEERING REPORT W TO MATCH W LONGITUDINAL WALL FOOTING FFOOTING AND LAP WITH co Z DOWELS (MATCH AND REINFORCING REINFORCING FOOTING Q Q LAP WITH FOOTING REINFORCING W FOOTING W O = cn EXTERIOR WALL FOOTING SCHEDULE (EWF) FTG MARK FTG MARK DIMENSIONS REINFORCING �� o TOP BOTTOM 2'-0" 2-#7 CONT 3-#7 CONT WF3 EWF4 4'-0" 4-#7 CONT 5-#7 CONT Q �„ REINFORCING) REINFORCING - - - - _ EL TOP FOOTING I I I I F 4 0 4 SEE PLAN g J O J J WALL INVERT OF In FOOTING :° z I I i— I I TRANVERSE I H V w SEE FO a I I / \1 I PIPE SLEEVE I 3 FOOTING 4. - = Q SECTION IN d ° d'' z co I I I REINFORCING > SE N ==tea`--- I �_�� I---��4—__ �' V '= ° 1 / LONGITUDINAL LONGITUDINAL 00_ fi Q a aoe FOOTING FOOTING < Z Q I I NOTES: '. 1\ o Z , E2 REINFORCING REINFORCING V J V LL Ix 1. USE CONCRETE BRICK ABOVE FOUNDATION WALL TO MAINTAIN FACE BRICK AT GRADE - - - - - - �' TRANSVERSE d � 4 �. . 2. SEE PLAN FOR EARTH FORMING REQUIREMENTS NOTE: FOOTING O Q • PIPE SLEEVE - PROVIDE SEE PLANS FOR REINFORCING 3. SEE PLAN FOR WALL FOOTING MARK AND TOP FOOTNG ELEVATION 6 1/2" CLEAR AROUND DOWELS TO MATCH FOOTING SIZE AND V PROJECTION PIPE (SEE MECHANICAL WALL FOOTING REINFORCING 4. PROVIDE "EWF2" FOOTING UNLESS OTHERWISE NOTED PLANS FOR LOCATION) 1'-6' (MINIMUM) REINFORCING 5. FOOTINGS SHALL BE EXCAVATED TO CREATE VERTICAL FACES TO INDICATED DIMENSIONS WITHIN AND (TYPICAL) FOOTING FOOTING THE TOLERANCE OF +6' AND -0" TYPICAL FOOTING REINFORCING 10 TYPICAL EXTERIOR WALL FOOTING 8 STEP AT WALL FOOTING 5 DEEPENED WALL FOOTING Z AT CORNERS E 3/4' = 1'-0- 3/4' = 1'-0' 3/4" = 1'-0' NTS O w MAS WALL PANEL A. TYPICAL CONSTRUCTION JOINT B. TYPICAL CONTROL JOINT . REINFORCING MASONRY OPENING (SEE MAS PLAN) 1/4- PREFORMED CONTROL JOINT WIRE 2.1 x C2 1 WELDED CONTROL JOINT DOWELS TO JOINT MATERIAL AT CENTERLINE o DISCONTINUE AT JOINT WWF MATCH VERT � (TYP) (SEE PROJECT S WALL REINF DOOR = / / BOTTOM CONSTRUCTION 0 NT-\ MANUAL) TOP FDN WALL i ___ _______g-_ ___= M FOOTING----_- -- -- - _ FIN FLRaq _ AEL ND100'-0" UON F a .r_ DOOR ; r_ fI I//i /�''�/ ` d — ---�-- ... ---t-wl FRAME d - _ L8 CMU WALL (TMP) BEYOND ,fl./ / VAPOR ------------------ / / / DRAINAGE DRAINAGE --==_a__m_ � .,,� �,, _/ -�,, VAPOR FILL BARRIER EL TOP FTG PLAN " SECT CONC SLAB CONTROL / /% FILL 4" 8" 8" 4" BARRIER SEE PLAN 1/2 = 1 -0 ON GRADE JOINT TOP / �I -----=---:r--i--=1/ —__._---- BACKFILL WITH LEAN CONCRETE - / - /- BOTTOM SLEEVE AT INVERT REINFORCING 4 °' a ( C. TYPICAL THICKENED SLAB D. TYP DEPRESSED SLAB EDGE AT WALL %0 (SEE ) PRIOR TO FOOTING01 - 1500 PSI PLACING �/ �; �� / . , - � � SCHEDULE) I1� w ... . w w PIPE SLEEVE - PROVIDE 2-#4 (CONT) KEYWAY 0 BorroM N NOTE: ELEVATION 1/2" CLEAR AROUND CONSTRUCTION • REINFORCING 3" TOP FOOTING -� NO PIPES SHALL PASS THRU 8" ( CONTROL JOINT ( OR UNDER COLUMN FOOTINGS. PIPE SEE PLUMBING JOINT WHERE (SEE 4 TYP (TYP) PLAN FOR LOCATION) (WHERE SHOWN SHOWN ON PLANS) WWF w SCHEDULE)ALL PIPES SHALL BE INSTALLED Lu d FOOTING-/' SECTION PRIOR T CONSTRUCTION OF EXCAVATION LIMITS ON PLANS) cn FOOTING WWF -\ CL WALL FIELD GEOTECHNICAL (SEE PLAN) EQ EQ ENGINEER TO VERIFY 9 TYPICAL SLAB AT INTERIOR OPENING DEEP TRENCH BOTTOM OF FOOTING -_ = ww" ELEVATION AND BEARING 3/4" = 1'-0" _ ° CAPACITY WITH o - BARRIER M DETAIL A GEOTECHNICAL VAPOR DRAINAGE SINGLE WYTHE WALLS ENGINEERING REPORT VAPOR DRAINAGE FILL ALIGN WITH FACE WALL ABOVE BARRIER T 2 T 2 FILL/- _' / BOTTOM " • W FOOTING 4 / T / 4 INTERIOR WALL FOOTING SCHEDULE (WF) FTG MARK DIMENSIONS REINFORCING "W" TOP BOTTOM WF2 2'-0" 2-#7 CONT 3-#7 CONT WF3 3'-0" 3-#7 CONT 4-#7 CONT DRAINAGE OR FILL BARRIER Q �„ F. E. ETYPICAL DEPRESSED SLAB FTYPICAL SLAB AT WALL Q . / cv � '� .%moi' ` / �,•/ �.,'�, � / � " � O 2 4 DEPRESSION 1/4" PREFORMED o Z / ,. / %i` 1 OR EMBEDDED JOINT MATERIAL J N WWF ITEMN WWF Q N a0D / I777 --===--tea - Lu BACKFILL WITH LEAN CONCRETE / :' j ' / BOTTOM SLEEVE AT INVERT --_- - ° ;� --__ _ 0 :i (1500 PSI) PRIOR TO PLACING /. II` , io ;� Z v G FOOTING y O PIPE SLEEVE - PROVIDE NOTE:1/2" CLEAR AROUND VAPOR DRAINAGE DRAINAGE OR FILL BARRIER Q �„ NOTES: FOR PIPES WITH LESS THAN 6" COVER 8" PIPE (SEE PLUMBING () BARRIER FILL Q u N 1. GROUT ALL CORES IN CMU BELOW FINISHED FLOOR PRIOR TO SLAB PLACEMENT STEP TRENCH FOOTING 1'-0" EACH PLAN FOR LOCATION) EXCAVATION LIMITS _ >. T SIDE OF PIPE. SEE 5-S1.2. PIPES NOTES: � 2. SEE FOUNDATION PLAN FOR WALL FOOTING MARK AND TOP FOOTING ELEVATION LESS THAN 2'-0" DEEP SHALL PASS 1. ALL CONCRETE FOR SLAB ON GRADE SHALL BE F'c = 3500 PSI AT 28 DAYS. c 3. PROVIDE "WF2" FOOTING UNLESS OTHERWISE NOTED OVER FOOTINGS. SHALLOW TRENCH 2. WELDED WIRE FABRIC TO BE DEPRESSED OR LAPPED AT ALL DEPRESSIONS. W 39 4. SEE REINFORCED MASONRY PLAN FOR WALL TYPE AND WIDTH ABOVE FOOTING 3. FIBROUS REINFORCEMENT TO BE USED IN ADDITION TO WELDED WIRE FABRIC. p v SEE ARCHITECTURAL PLAN FOR CONFIGURATION OF MULTI-WYTHE CMU WALLS 11 INTERIOR FOUNDATION SCHEDULE 6 TYPICAL PIPE BACKFILL AT FOOTING 3 TYPICAL 4" CONCRETE SLAB ON GRADE CHERRY TREE SOFTBALL COMPLEX RENOVATIONS 208032.00.00 CONTRACTOR'S OPTION - COLD WEATHER PROTECTION NTS NTS FOR VAPOR SENSITIVE FLOOR COVERINGS OR HUMIDITY CONTROLLED AREAS NTS