HomeMy WebLinkAbout17END OF CONC SEE SITE PLAN (8'-0' MAX) 1'_6• i
t'
OR FIRST
SLAB JOINT 1-2» #4 DOWELS AT
W
13 AT 1'-0" C TO C w/2 1 /2" i BEYOND 4' i 2'-0" C TO C
HOOKED ENDS EA WAY i (TYPICAL)
o
4" EXTERIOR 1 " i
Go
Go
CONC STOOP i I(UON) i FIN FLOOR"
EL 100
FIELD GEOTECHNICAL
--=-=-
ENGINEER TO VERIFY
d P
O
BOTTOM OF FOOTING
A
4_ a
ELEVATION AND BEARINGo
i CONC
CAPACITY WITH
GEOTECHNICAL.
d
LOST 4N
FORMS i 4 = ° S GRADE
2c
ENGINEERING REPORT
_
SEPARATE INTERIOR
AND EXTERIOR SLAB w/72000
m
\����������*�����,������
.�
v
10"
#4 NOSING
GRID LINE MASONRY WALL
"'
1/2" PREF JT MAT
ao
O
`��•� a ,
- ;�� ,� `•� �_
BAR (NP)
(SEE PLAN) REINFORCING
1 �- " ( ')
N
< o
CONC SLAB
I PSEE)MASONRY
4<
#3 DOWELS AT 1'-0"
C TO C AROUND STOOP
=
�'� � 2: G
,��j'
ON GRADE.4
i
°
��'%'%!, ' *•• \\\\\�.
d
DOWELS TO I00
WALL FOOTING
$
o
����►����������
MATCH PANEL I
�,
d
(SEE PLAN FOR SECTION)
° d
REINFORCING i FULLY o
(CENTER IN CMU) I GROUTED Ta
°
CMU CONC SLAB
GRADE i ON GRADE FINISH FLOOR a
8•
S #6 (CONT)
/� co
3 SID
TOP REINFORCING 4 d
=-=----=--=- =-----
1
TYPICAL CONCRETE STOOP
w
(2—#7)3. a _ ..
° d��
TYP
00
1 TOP FOOTING
a z EL 99'-4" (UON)
—�
N 0
Q
ALL PERIMETER DOOR OPENINGS (UON NTS
#4 AT 4'-0" z
�.
TOP REINFORCING c
END OF CONC
SEE SITE PLAN 8'-0'
( MAX)) 1 -60.
W
OR FIRST
° C TO C
m
(2-#7) °
1'-2" WALL
= Z
co
0
4a i
3" Z
TYP
SLAB JOINT
#4 AT 1'-0" L2x2x1/4 w/
BEYOND #4 DOWELS AT
C TO C w/ 1/4" DIA ANCHORS 2 1/2' i
W
BOTTOM REINFORCING
BOTTOM REINFORCING #4 AT 4'-0" �
"
6 EXTERIOR
4'i 2'-0" C TO C
HOOKED ENDS AT 2'-0" C TO C i
EACH WAY (TYPICAL)
W 0 co
0
3- 7
(3-17) - C TO C N
CONC SLAB
(SEE NOTE)
i
FIN
a
U Z
C-4 FLOOR
i EL 100'-0"
P
CA4 d ad. °. =
p J J
WALL
EQ THK EQ
�_ N i CONC
i SLAB ON
—
V
4_ d 4
_.°4 LOST o r ° GRADE
W
= Q 2
2'-0"
2'-0"
- � FORMS
A.
" SEPARATE INTERIOR AND
;