Loading...
HomeMy WebLinkAbout2ARCHITECTURAL/SITE ABBREVIATIONS ETAL ABBREVIATIONS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT LIMITED TO THOSE LISTED BELOW METAL ROOF DECK O AT FD FLOOR DRAIN QT QUARRY TILE AC AIR CONDITIONING FHC FIRE HOSE CABINET LAMINATED) BATT INSULATION ACT ACOUSTICAL CEILING TILE FIN FINISH R RISER AD AREA DRAIN FIN FL FINISH FLOOR RA RETURN AIR AN ADJUSTABLE RR FLOOR RAD/R RADIUS AFF ABOVE FINISHED FLOOR FDN FOUNDATION RB RESILIENT BASE AFP ACCORDION FOLDING PARTITION FSR FLEXIBLE SHEET ROOFING RCP REINFORCED CONCRETE PIPE AGG AGGREGATE FSSK FLOOR SERVICE SINK RD ROOF DRAIN ALT ALTERNATIVE FT FEET REF REFERENCE AL ALUMINUM FTG FOOTING RffR REFRIGERATOR AP ACCESS PANEL FE FIRE EXTINGUISHER REINF REINFORCING APPROX APPROXIMATE FEC FIRE EXTINGUISHER CABINET REQ'D REQUIRED AR ACID RESISTANT REV REVISION(S) ARCH ARCHITECT(URAL) GA GAUGE RM ROOM ASPH ASPHALT GALV GALVANIZED) R.O. ROUGH OPENING AV AUDIO-VISUAL CU FT/CF GRAB 13AR ROW RIGHT-OF-WAY AWG AMERICAN WIRE GAUGE GFCMU GROUND FACE CONCRETE MASONRY UNIT MAXIMUM TOSCU AWT ACOUSTICAL WAIL TREATMENT GFRGU GLASS FIBER REINFORCED GYPSUM UNIT CU YD/CY L ANGLE GL GLASS S SOUTH & AND GWB GYPSUM WALLBOARD SA SUPPLY AIR SAN SANITARY BIT BITUMINOUS H HEIGHT/HIGH SCHED SCHEDULE BLDG BUILDING HB HOSE BIBB SD STORM DRAIN/SMOKE DETECTOR BLKG BLOCKING HDWE HARDWARE SECT SECTION BM BENCH MARK/BEAM HM HOLLOW METAL SEW SEWER B.O. BOTTOM OF HORIZ HORIZONTAL SGFT STRUCTURAL GLAZED FACING TILE BOS BOTTOM OF STEEL HPT HIGH POINT SHT SHEET DEPT DEPARTMENT HS HIGH STRENGTH SIM SIMILAR BOT BOTTOM VCGWB N NORTH HTG HEATING SP SPACE BRG BEARING NIC NOT IN CONTRACT VFWC DIA/ Jt1 HVAC HEATING/VENTILATING/ SPEC(S) SPECIFICATION(S) BRK BRICK NO/# AIR CONDITIONING VIF DIM DIMENSION SPKR SPEAKER BUR BUILT-UP ROOF HW HOT WATER DIVISION HWY HIGHWAY SQ SQUARE CAB CABINETID DEAD LOAD SQ Fr/SF SQUARE FEET INSIDE DIAMETER SQ IN/SI SQUARE INCHES CAR CARPET IN INCH CAT CATALOG INCL INCLUDE(D), (ING) SQ YD/SY SQUARE YARDS CB CHALKBOARD/CATCH BASIN INFO INFORMATION SS STAINLESS STEEL INSUL INSULATION/INSULATE ST STORM/STREET CFM CUBIC FEET PER MINUTE INTR INTERIOR VT EA CH CABINET HEATER INV INVERT SID STANDAR CI CAST IRON W EF m STEEL CJ CONTROL JOINT JS JOIST SUBSTITUTE STRUCT STRUCTURAL CL CENTERLINE JSf JOIST SUSP SUSPENDED EL ELEVATION JT JOINT SW SHORT WAY/SIDEWALK CLR CLEAR PAINT WA ELEV ELEVATOR PA PUBJC ADDRESS WEI ENGR SYMM SYMMETRY(ICAL) CLG CEILINGKIT KITCHEN WD PIPE ELECTRICAL PANELBOARD PLAS SYNTH SYNTHETIC CMP CORRUGATED M METAL ROOF DECK MUSIC CASEWORK SAND, GROUT, PLASTER, GWB, CMT CERAMIC MOSAIC TILE L LENGTH _ CMU CONCRETE MASONRY UNIT IAM LAMINATED) BATT INSULATION EDUCATIONAL CASEWORK TERRAllO G3.2 ENLARGED LAYOUT PLAN T CO CLEANOUT LAV LAVATORY T&6 COL COLUMN LB/f POUND T&B COMP COMPACTED LKR LOCKER TA CONC CONCRETE LL LIVE LOAD TB CONSTR CONSTRUCTION LLH LONG LEG HORIZONTAL TC CONT CONTINUOUS/CONTINUE LLV LONG LEG VERTICAL TEL CONTR CONTRACTOR LVR LOUVER 11RR CORR CORRUGATED LW LONG WAY T.O. CT CERAMIC TILE TOC M METER/THOUSAND C TO C CENTER TO CENTER TOF CSK COUNTER SINK MAS MASONRY CU FT/CF CUBIC FEET MAT MATERIAL TOM MAX MAXIMUM TOSCU IN/CI CUBIC INCH CU YD/CY CUBIC YARD MB MARKER BOARD 1V MECH MECHANICAL TYP CUSP CUSPIDOR MEZZ MEZZANINE TWS CW COLD WATER CWF CEMENTTTIOUS WOOD FIBER MFR MANUFACTURER MH MOP HOLDER LINO d PENNY (NAILS, ETC.) MIN MINIMUM UV D DEPTH/DEEP MISC MISCELLANEOUS UR o DEGREE MM MILLIMETER DC DISPLAY CASE MO MASONRY OPENING DEPT DEPARTMENT MTL METAL VCT DET DETAIL VCGWB N NORTH VERT DF DRINKING FOUNTAIN NIC NOT IN CONTRACT VFWC DIA/ Jt1 DIAMETER NO/# NUMBER VIF DIM DIMENSION NOM NOMINAL VIT DIV DIVISION NTSNOT TO SCALE VOL DL DEAD LOAD VR DWG DRAWING OC ON CENTER VRB DS DOWNSPOUT OD OUTSIDE DIAMETER DWC DRINKING WATER COOLER OPNG OPENING OPP OPPOSITE VS E EAST O.H. OPPOSITE HAND VT EA EACH 0 TO 0 OUT TO OUT W EF EACH FACE OW OPERABLE WALL W / E) EXPANSION JOINT OZ OUNCE W/0 EL ELEVATION ELEC ELECTRIC(AL) P PAINT WA ELEV ELEVATOR PA PUBJC ADDRESS WEI ENGR ENGINEER PERF PERFORATED WC WD EP ELECTRICAL PANELBOARD PLAS PLASTER EQ EQUAL PL PLASTIC LAMINATE WH EQUIP EQUIPMENT PLBG PLUMBING WP EW EACH WAY PLYWD PLYWOOD WSSK WWF EFS (or DEFS) DIRECT APPLIED EXTERIOR FINISH SYSTEM PREFAB PREFABMCATED EIFS EXTERIOR INSULATION FINISH SYSTEM PS PROJECTION SCREEN YD IXH EXHAUST PSF POUNDS PER SQUARE FOOT EXIST EXISTING PSI POUNDS PER SQUARE INCH EXP EXPANSION PSS PENCIL SHARPENER SUPPORT EXT EXTERIOR PT PORCELAIN TILE EXTN EXTENSION PVC POLYVINYL CHLORIDE PVMT PAVEMENT TREAD TOP AND BOTTOM TONGUE AND GROOVE TOILET ACCESSORY(IES) TACKBOARD TOP OF CURB TELEPHONE TERRAllO TOP OF TOP OF CONCRETE TOP OF FOOTING TOP OF MASONRY TOP OF STEEL TELEVISION TYPICAL TACKABLE WALL SURFACE UNLESS NOTED OTHERWISE UNIT VENTILATOR URINAL VINYL COMPOSITION TILE VINYL COVERED GYPSUM WALLBOARD VERTICAL VINYL FABRIC WALLCWERING VERIFY IN FIELD VITREOUS VOLUME VAPOR RETARDER VENTED RESILIENT BASE VENT STACK VINYL TILE WEST/WIDE/WIDTH WITH WITHOUT WARDROBE ACCESSORIES WOOD BASE WATER CLOSET/WIND COLUMN WOOD WATER HEATER WORKING POINT WALL SERVICE SINK WELDED WIRE FABRIC YARD/YARD DRAIN MATERIAL SYMBOLS LEGEND MATWAAL SYMBOLS U80 ON THE CONTRACT DOMMS, MMWE BUT ARE NOT LIMTED TO THOSE LJSTED BELOW ASPHALT -XX- WIRE FENCE OR PARTITION EARTH FACE BRICK(PLAN) GLAZED BRICK CONCRETE MASONRY UNIT (PLAN) CONCRETE MASONRY UNIT (SECTION) CONCRETE MASONRY UNIT (SOLID, IN SECTION) e SPRAY -ON INSULATION OR FIRE PROTECTION PLYWOOD GYPSUM WALLBOARD (LARGE SCALE) STUD WALL(PLAN)-DIMENSIONS TAKEN TO FINISH FACE OF WALL -SEE WALL TYPES. _ SOLID PANEL FOLDING PARTITION OR OPERABLE WALL FABRIC ACCORDION FOLDING PARTITION I ACOUSTIC TILE CEILING EXTERIOR INSULATION FINISH SYSTEM DRAWING SYMBOLS LEGEND DRAWING SYMBOLS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT LIMITED TO THOSE LISTED BELOW GRAVEL, STONE OR DRAINAGE FILL METAL ROOF DECK MUSIC CASEWORK SAND, GROUT, PLASTER, GWB, LAMINATED WOOD BEAM L? OR PLAN VIEW OF SIDEWALK (SMALL SCALE, SECTION) _ CONCRETE G1.0 SITE LAYOUT PLAN EXISTING CONTOUR BATT INSULATION EDUCATIONAL CASEWORK TERRAllO G3.2 ENLARGED LAYOUT PLAN G4.1 RIGID INSULATION NEW CONTOUR CUT STONE LOCKER TYPE DETAILS G4.4 ROUGH WOOD (NOM.) DETAIL REFERENCE MARBLE FINISH WOOD _ SLATE WOOD OTHER THAN NOMINAL FACE BRICK(PLAN) GLAZED BRICK CONCRETE MASONRY UNIT (PLAN) CONCRETE MASONRY UNIT (SECTION) CONCRETE MASONRY UNIT (SOLID, IN SECTION) e SPRAY -ON INSULATION OR FIRE PROTECTION PLYWOOD GYPSUM WALLBOARD (LARGE SCALE) STUD WALL(PLAN)-DIMENSIONS TAKEN TO FINISH FACE OF WALL -SEE WALL TYPES. _ SOLID PANEL FOLDING PARTITION OR OPERABLE WALL FABRIC ACCORDION FOLDING PARTITION I ACOUSTIC TILE CEILING EXTERIOR INSULATION FINISH SYSTEM DRAWING SYMBOLS LEGEND DRAWING SYMBOLS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT LIMITED TO THOSE LISTED BELOW G m STORM SEWER INLETS O WINDOW DESIGNATION "'A1 DOOR NUMBER(S) STRUCTURAL GRID REFERENCE O KEY NOTE W 1 INTERIOR WALL TYPE WALL SECTION Aai 4 1 3 A8.1 1 INTERIOR ELEVATIONS A8.1 1 2 A BUILDING SECTION A�1 SITE LOCATION MAP MICHIGAN MICHIGrW CITY SOUT�1 BEND FM W AYNE "°' INDIANA ILLINOIS CIPMEL INDIANAPOLIS STATEFM PAM MAP EVANSVIUE KENTUCKY CEUNA OHIO ---'--T SITE •89 13989 HAZEL DELL PARKWAY CARMEL, INDIANA 46033 SCHOOL BOARD STEPHEN BACKER President BRUCE CALABRESE Vice President TRICIA HACKETT Secretary GREG PHILLIPS Member ANDREW KLEIN ADMINISTRATION Member DR. BARBARA UNDERWOOD Superintendent ROGER MCMICHAEL Assistant Superintendent LIBBIE CONNOR Assistant Superintendent ROLLIN FARRAND Director of Facilities and Transportatlon SHEET It X LEVEL LINE M? MUSIC CASEWORK tin TEST BORING & NO. L? MEDIA CENTER CASEWORK CURRENT GRADING PLAN GD1.0 SITE DEMOLITION PLAN G1.0 SITE LAYOUT PLAN EXISTING CONTOUR E? EDUCATIONAL CASEWORK ENLARGED LAYOUT PLAN G3.2 ENLARGED LAYOUT PLAN G4.1 DETAILS NEW CONTOUR or LOCKER TYPE DETAILS G4.4 '00" ## ? DETAIL REFERENCE LANDSCAPE PLAN EXISTING POINT ELEVATION ; SU2.1 STORM SEWER DETAILS T3.1 FIRST FLOOR ROUGH -IN PLAN T3.2 8t3� NEW POINT ELEVATION A15 ROOM NO. - SEE ROOM LEGEND SECOND FLOOR TECHNOLOGY PLAN FOR ROOM AREA & CEILING HEIGHT G m STORM SEWER INLETS O WINDOW DESIGNATION "'A1 DOOR NUMBER(S) STRUCTURAL GRID REFERENCE O KEY NOTE W 1 INTERIOR WALL TYPE WALL SECTION Aai 4 1 3 A8.1 1 INTERIOR ELEVATIONS A8.1 1 2 A BUILDING SECTION A�1 SITE LOCATION MAP MICHIGAN MICHIGrW CITY SOUT�1 BEND FM W AYNE "°' INDIANA ILLINOIS CIPMEL INDIANAPOLIS STATEFM PAM MAP EVANSVIUE KENTUCKY CEUNA OHIO ---'--T SITE •89 13989 HAZEL DELL PARKWAY CARMEL, INDIANA 46033 SCHOOL BOARD STEPHEN BACKER President BRUCE CALABRESE Vice President TRICIA HACKETT Secretary GREG PHILLIPS Member ANDREW KLEIN ADMINISTRATION Member DR. BARBARA UNDERWOOD Superintendent ROGER MCMICHAEL Assistant Superintendent LIBBIE CONNOR Assistant Superintendent ROLLIN FARRAND Director of Facilities and Transportatlon SHEET It X COVER SYMBOLS AND ABBREVIATIONS ABBREVIATIONS AND INDEX SITE ELECTRICAL SURVEY ELECTRICAL SYMBOLS AND DETAILS CURRENT GRADING PLAN GD1.0 SITE DEMOLITION PLAN G1.0 SITE LAYOUT PLAN G2.0 GRADING AND DRAINAGE PLAN G3.1 ENLARGED LAYOUT PLAN G3.2 ENLARGED LAYOUT PLAN G4.1 DETAILS G4.2 DETAILS G4.3 DETAILS G4.4 DETAILS L1.0 LANDSCAPE PLAN CIVIL TECHNOLOGY DETAILS SU2.1 STORM SEWER DETAILS STRUCTURAL S1.1 FOUNDATION PLAN AND DETAILS S1.2 FOUNDATION DETAILS S1.3 FOUNDATION DETAILS S2.1 FRAMING PLANS AND DETAILS S2.2 FRAMING DETAILS S2.3 FRAMING DETAILS S3.1 MASONRY PLANS AND DETAILS S3.2 MASONRY DETAILS S3.3 MASONRY DETAILS ARCHITECTURAL AO.1 FIRST FLOOR CODE PLAN SECOND FLOOR CODE PLAN A1.1 FIRST FLOOR PLAN SECOND FLOOR PLAN VIDEO PLATFORM A1.2 DETAILS WALL TYPES A1.3 SOFTBALL DUGOUT PLANS AND DETAILS A1.4 SOFTBALL DUGOUT SECTIONS AND DETAILS A3.1 BUILDING ELEVATIONS ROOF PLAN A5.1 WALL SECTIONS A6.1 DOOR SCHEDULE / DOOR AND FRAME ELEVATIONS WINDOW ELEVATIONS / DOOR DETAILS A6.2 DOOR AND WINDOW DETAILS A7.1 FIRST FLOOR EQUIPMENT PLAN / EQUIPMENT SCHEDULE SECOND FLOOR EQUIPMENT PLAN / FINISH SCHEDULE A7.2 MOUNTING HEIGHT DRAWING / ENLARGED TOILET PLANS / EQUIPMENT DETAILS A9.1 FIRST FLOOR REFLECTED CEILING PLAN SECOND FLOOR REFLECTED CEILING PLAN A10.1 VERTICAL CIRCULATION PLUMBING P1.1 SYMBOLS AND ABBRIEVIATIONS P2.1 UNIT 'A' FOUNDATION PLAN- PLUMBING P2.2 UNIT 'A' FIRST FLOOR PLAN- PLUMBING AND FIRE PROTECTION P2.3 UNIT 'A' SECOND FLOOR PLAN- PLUMBING P3.1 PLUMBING SCHEDULES/DETAILS P3.2 PLUMBING DETAILS PSU2.1 SITE PLAN- PLUMBING AND FIRE PROTECTION PSU2.2 WATERMAIN EXTENSION PLAN- PLUMBING AND FIRE PROTECTION PSU2.3 UTILITY COMPANY SPECIFICATIONS AND DETAILS PSU2.4 UTILITY COMPANY SPECIFICATIONS AND DETAILS MECHANICAL M1.1 SYMBOLS AND ABBREVIATIONS M2.1 FIRST AND SECOND FLOOR VENTILATION PLAN ELECTRICAL E1.1 ELECTRICAL SYMBOLS AND DETAILS E1.2 GROUNDING DETAILS E1.3 ELECTRICAL DETAILS E2.1 ELECTRICAL SITE PLAN E5.1 DUGOUT AND STORAGE ELECTRICAL PLANS E6.1 FIRST FLOOR ELECTRICAL PLANS E6.2 SECOND FLOOR ELECTRICAL PLANS E7.1 SINGLE UNE DIAGRAM E7.2 SINGLE UNE DIAGRAM E8.1 FIXTURE SCHEDULE E8.2 FIXTURE SCHEDULE TECHNOLOGY T1.1 TECHNOLOGY DETAILS T2.1 TECHNOLOGY SITE PLAN T3.1 FIRST FLOOR ROUGH -IN PLAN T3.2 SECOND FLOOR ROUGH -IN PLAN T4.1 FIRST FLOOR TECHNOLOGY PLAN T4.2 SECOND FLOOR TECHNOLOGY PLAN X m Ja 0 Q Lu Z w.a U a a: Lu co D �Z �J� V W Umz � LL cr 0 a (n U >0111110 E Lo 1� M X W z CHERRY TREE SOFTBALL COMPLEX RENOVATIONS 208032.00.00