Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
29
F 3 BUILDING ELEVATION 1/810 _ , -0" 4 BUILDING ELEVATION 1/8" = 1'-0" P T.O. MASONRY `- EL. 126'-0" C B.O. LIGHT FIXTURE 14 EL. 123'-0" 21'-9" 5'-4" �1 (6 SECOND FLOOR `- EL. 116'-4" 15 T.O. ROWLOCK BRICK 14 EL. 112 -0 " BASE BID 21'-9" 5'-4" cl B.O. LIGHT FIXTURE 5!!-11 EL. g 8'- F7 FIRST FLOOR EL. 100'-0- BUILDING 00 -0 9 3 16 f71.. C© MENS WOMENS 16 RESTROOM RESTROOM BUILDING ELEVATION 1/8" = 1'-0" 12 74 4" ABOVE DOORRF�FRJ .(16) WOMENS TESTROOM Ak T.O. MASONRY EL 126 -d w- 51 B.O. LIGHT FIXTU ' 28'-3" SECOND FLOOR EL 116'-4' 2 BUILDING ELEVATION 1/8" = 1'-0" �•..e"nnu�ue�nn� it 4 X0 ULIWN YUU I ROOOF PLAN (TYPICAL) -2*-0" OVERHANG (rn'•) ASPHALT SHINGLE ROOF 4"x5"DOWNSPOUT ROOF MOUNTED FAN - REFER TO MECHANICAL DRAWINGS ROOF MOUNTED AIR INTAKE HOOD - REFER TO MECHANICAL DRAWINGS ELEVATION GENERAL NOTES A. REFER TO SITE PLAN FOR ADDITIONAL INFORMATION B. REFER TO STRUCTURAL DRAWINGS FOR FOUNDATION WALLS. C. REFER TO FLOOR PLANS FOR WALL SECTION TAG LOCATIONS. D. (EJ) BRICK EXPANSION JOINT, REFER TO DETAIL 1-A1.2. ELEVATION KEYNOTES 0 + ALL KEYNOTES MAY NOT BE USED ON THIS DRAWING. 1. EXTERIOR INSULATED FINISH SYSTEM (EIFS)- PROVIDE 3/4" VERTIVAL "V" JOINT LOCATED ABOVE END OF EACH WINDOW - REFER TO 6-A1.2 (COLOR TO MATCH EXISTING SCHOOL) 2. DOOR AND FRAME 3. ALUMINUM WINDOW 4. OVERHEAD COILING DOOR 5. GUTTER AND FASCIA - REFER TO ROOF PLAN AND DETAILS. (COLOR TO MATCH EXISTING SCHOOL) 6. DOWNSPOUT - REFER TO ROOF PLAN AND DETAILS. 7. DOWNSPOUT BOOT - REFER TO DRAWINGS. 8. ROOF SYSTEM - REFER TO ROOF PLAN AND DETAILS. (ASPHALT SHINGLE COLOR TO MATCH EXISTING SCHOOL ROOF) 9. FINISHED GRADE - REFER TO SITE DRAWINGS. 10. BLEACHERS - REFER TO SITE DRAWINGS. 11. HANDRAIL AND STAIRS - REFER TO FLOOR PLANS. 12. SAFETY NETTING SUPPORT - REFER TO SITE DRAWINGS. 13. UTILITY FACE BRICK TYPE I (RUNNING BOND) COLOR B (COLOR TO MATCH EXISTING SCHOOL) 14. UTILITY FACE BRICK TYPE I (ROWLOCK) COLOR B (COLOR TO MATCH EXISTING SCHOOL) 15. MODULAR FACE BRICK TYPE 2 (RUNNING BOND) COLOR A (COLOR TO MATCH EXISTING SCHOOL) 16. LIGHT FIXTURE - REFER TO ELECTRICAL DRAWINGS. 17. 24"X24" ALUMINUM LOUVER (BOTTOM AT 12'-0" AFF) SET LOUVER IN 2" FROM FACE OF BRICK AND PROVIDE ALUMINUM SILL BY LOUVER MANUFACTURER. INSTALL SEALANT AROUND PERIMITER OF LOUVER. 18. KNEE WALL - REFER TO SITE DRAWINGS (ALTERNATE) 19. BASE BID: NO GUARDRAIL REQUIRED ALTERNATE: PROVIDE SINGLE TOP RAIL AT 40" A.F.F. AND SUPPORT POSTS 11, 4 A3.1 3 A3.1 ELEVATION KEYPLAN !1 J E U Go Z 0 ~ Z � J W a W Z 0 D J 7 1� M 8 CV M O N � N N N Z � H O < V D cr- CD C vo r ■ M Q CHERRY TREE SOF ML COMPLEX RENONATIONS 208032.00.00 27'-0" REFER TO SITE PLAN 5'-11 " " BASE BID 21'-9" 5'-4" r11 " ALTERNATE 5!!-11 1'-O" 11, 4 A3.1 3 A3.1 ELEVATION KEYPLAN !1 J E U Go Z 0 ~ Z � J W a W Z 0 D J 7 1� M 8 CV M O N � N N N Z � H O < V D cr- CD C vo r ■ M Q CHERRY TREE SOF ML COMPLEX RENONATIONS 208032.00.00