Loading...
HomeMy WebLinkAbout45City of Carmel Water Utility Approved List of Construction Materials 1. Water Main: Shall be Ductile Iron Pressure Class 350. 2. Reflective Warning Tape: Shall be installed 18in above pipe. 3. Tracing Wire (10 or 12 gauge): To be installed with all water mains. There must be access to the tracer wire at each valve box, with enough wire in the valve box to insure the proper connection to the locating machine. 4. Fire Hydrants: Shall be Mueller (Safety Yellow, M.A.B. # 0433291, Sherwin Williams # F75YP2) (Carmel Clay Spec. hydrants shall be open right and will have a safety blue stripe around hydrant bonnet from the factory). The hydrant pumper nozzle shall be of one-piece design, compatible with 5" Storz hose coupling. The nozzle shall be an integral part of the fire hydrant and must be furnished by the manufacturer or authorized distributor designated by the manufacturer. Mueller model 290220 for casting and 290221 for cap. Storz adapters will not be accepted. 5. Valves: Shall be resilient seat gate valve, Mueller only. (Carmel Clay Spec. valves shall be open right) Butterfly valves shall be used for sizes over 12in. 6. Fittings: Shall be Union, Tyler 7. Mechanical Joints: Shall be made with Megalugs. 8. Valve Boxes: Shall be Union Tyler or East Jordan Iron Works 9. Posi Caps or Box loks: Shall be installed, with each gate valve. **not to be used on butterfly valves*** 10. Curb Boxes: Shall be Union, Tyler 11. Tapping Sleeves: Shall be Smith Blair, Romac, or JCM 12.Repair Clamps: Shall be full circle stainless steel with ductile lugs. Smith Blair 226, Ford F-1, JCM or Mueller equal. 13. Tapped Repair Clamps: (For 3/4,1in, 11/2 in, and 2in taps on PVC,11/2in and 2in on Ductile Iron and service repairs) shall be 12in long, full circle stainless steel with ductile lugs and tapered threads. Smith Blair, Ford, JCM, Mueller. 14. Sample Stations: Shall be installed at the utilities request. (GIL Industries model # E11101). 15. Service Lines: 3/4in, lin, 11/2in, 2in, Shall be K - Copper. 16. Brass: Compression Fittings. Pack Joints not allowed (See Meter Pit Specs. For Make and Model #) 17.Joint Restrains: Shall be Field Lock Gaskets or Mechanical Bell Joint Restraints. 18. HDPE Sleeves: Shall be used for services that cross major city streets. ** 3/4" & 1" lines will use 3" hdpe sleeve * * 1 %2" & 2" lines will use 4" hdpe sleeve 19.Additional Kickers: Shall be solid block and brick. No poured concrete. Carmel Water Utility Commercial- Business Water line responsibility Responsibility for Commercial/ Business water lines is not the same as Residential lines. The responsibility of the Water Utility for Commercial/Business water lines stops at the first connection to the utility owned water main (corp stop, inline gate valve, butterfly valve, etc.) Past that point all repairs and associated costs are the responsibility of the Property Owner/Business Owner (Also some Commercial/ Business private water lines have fire hydrants that are connected to them , these hydrants are to be painted safety red and all maintenance and repairs and associated costs for these hydrants are the responsibility of the Property Owner/Business Owner CARMEL WATER UTILITY STANDARD Drawings TABLE OF CONTENTS: CWOI - LIMITS OF SPECIAL BACKFILL CW02 - STREAM CROSSING PLAN VIEW CW03 - TRENCH DETAIL AND TRENCH SCHEDULE CW04 - WATER SERVICE DETAIL CW05 - WATER MAIN CONNECTION DETAIL CW06 - MONITORING MANHOLE CW07 -WATER SAMPLING STATION CW08 - FIRE HYDRANT ASSEMBLY CW09 -JOINT RESTRAINT TABLE CITY OF CARMEL WATER UTILITY PIPE INSTALLATION All work shall be in the best practices of the water utility industry and the American Water Works Association, and in accordance with all applicable Federal, State, and local codes and regulations. Furthermore: 1) Any damage done to the City of Carmel Water Utility's system by the Contractor/Developer or his affiliates shall immediately be repaired, to the satisfaction and direction of the City of Carmel Water Utility by the Contractor/Developer at his own expense. 2) Should the Contractor/Developer propose to depart from the specifications contained herein, he shall submit samples and/or specifications of such alternatives to the City of Carmel Water Utility before proceeding. 3) No work shall be performed under conditions which in the opinion of the City of Carmel Water Utility would adversely affect the quality of the finished job. 4) The Contractor/Developer shall conduct his work so as not to interfere with the present operation of the existing City of Carmel Water Utility's water/sanitary sewer system. If any work interference is encountered between the City of Carmel Water Utility and the Contractor/Developer, the City of Carmel Water Utility will receive priority in scheduling. NOTES: *Should meter pit need raised to grade, e Mid Stale Meter Box Extension should be used, No meter should be raised more than ', �r0iout approval from Carmel Utilities. USING BRICKS OR CEMENT BLOCKS IS NOT AN APPROVED METHOD OF RAISING A METER PIT. �m � 11. r r ..:111111*44 11THIPP.111ANAWMI 11 li I KINI-I'm Lts"o .01;r1affolvalt I is r=: r r r r r r •:♦ r ti: t♦ • • r r *'No pit shall be installed In a traffic area, such as a driveway or sidewalk. *The meter pit Is to be installed list off the uti14 easement, ars private property. In the rniddle of the lot ft. Left or Flight of Center, As close to easrnent line as passible. City of Carmel Motor Pit and Service line Specifications - 4" and 1 lltleter'a Approved Material U st 345 sit 03/0 Item cesc 1ptio s'p'a X 344" meters 1. meters ter, Plt Cover Ford cat Ford X43•T with hale for touch read Tyler 6150 VestVestW 2W4r and Plug (Plug can be Cast *r W Plastic � _ A. Y. McDonald 74 143xTP A..Y. McDonald 74M30TP 2 'Yoke Ford Y502 Fard Y504 Mueller H5020-203 klulier H5040.33 A.Y.M� Doneld !4-2 kY,Mcl'3cnald 14-4 3 Street Side Angle valve Ford AV94-323WO Ford A1V 4-444 WQ A.Y,M d 4602Y -023,14X02 A ; x.14 WDonald 02.4ye-44 Mueller b14273 Mueller b24273 4 House Side Angle Check Valve Ford HHA94.3230 r Ord HA 1-444 Mueller H 14246 A,Y.M: D ald 12-3Ye 44 A.Y.McDonald 12-3'YQ33 No Mueller for tnis part s Mew Pit Fratco HOPE Fratco HDP 24`w X 48'd 24"w X 48"d Mid State-Sonilo Mid State- onlloc 20"w X 48 24-w X 48"d e Service Line .4„ l'4 Copper 1 } Copp. ration Stop Muller 1-1-15008 (4" Dueller H-1 5008 t` A.Y.McOorald 47010 3,4' AY.WDonald 4701 Q 1 � Pori FIOOO-30 Ford F1 DOO-40 UTILITY COMPANY SPECIFICATIONS AND DETAILS NO SCALE v Z as W H V O W CIDW O X Z I m p0 N 4 a.8 co W � a.W 0 a Z w�a U Q � Da CO D }Z �J� V W =Qa J OAC U�z �Q LL cc 0 Q (n U aD z _V 0 co W t IO CLIO 2z O� 1� M W 0 d Z co Z M N CHERRY 1REE SOFIBAl1 COMPLEX RENOVATIONS 208032.00.00