HomeMy WebLinkAbout250 C 0 E 1 0 w �w N V) W �� _ cr- ~ N cif 1-- E-4 r 2 0-0 Ci CU V J WDQ 1 2 3 4 5 0 7 I 2 3 4 5 C. OWNER SHALL BE GIVEN FIRST CHOICE ON ALL EQUIPMENT BEING REMOVED THAT WILL NOT BE RELOCATED. CONTRACTOR SHALL REVIEW THE EXISTING EQUIPMENT WITH OWNER. EQUIPMENT BEING REMOVED OR RELOCATED SHALL BE REMOVED IN A MANNER THAT REUSE IS POSSIBLE AND STORED AS DIRECTED BY OWNER. ALL OTHER EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED & DISPOSED OF FROM THE SITE BY THE CONTRACTOR. D. CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS, CEILINGS, ETC. WHERE REQUIRED BY THE REMOVAL OF EQUIPMENT, DUCTWORK, AND ACCESSORIES. PATCHING SHALL MATCH EXISTING CONSTRUCTION & FINISHES. COORDINATE ALL PATCHING AND FINISHES WITH ARCHITECT. PATCHING OF FIRE WALLS SHALL MEET THE RATING AND SHALL BE INSTALLED PER ARCHITECTURAL SPECIFICATION. E. IF EQUIPMENT TO REMAIN MUST BE REMOVED DUE TO REMOVAL OR CONSTRUCTION, THE EQUIPMENT SHALL BE RELOCATED IN A MANNER THAT IS ACCEPTABLE BY THE ARCHITECT/ENGINEER. F. PROPER CONNECTIONS, MATERIALS, AND SIZES OF DUCTWORK/PIPING SHALL BE MAINTAINED TO ENSURE EQUIPMENT IS MADE FULLY OPERATIONAL. G. REMOVAL OF EXISTING EQUIPMENT SHALL BE MADE SO THAT SERVICE TO OTHER AREAS UTILIZED BY THE OWNER ARE NOT INTERRUPTED WITHOUT CONSENT FROM OWNER. PROVIDE TEMPORARY VALVES AND TEMPORARY SERVICES REQUIRED DURING REMOVALS AND CONSTRUCTION. H. REMOVE COMPLETELY ALL EXISTING HVAC EQUIPMENT, ALL ASSOCIATED PIPING, CONTROLS, AND SUPPORTS BEING MADE OBSOLETE BY THIS CONSTRUCTION. REMOVAL OF HVAC DUCTWORK AND PIPING SHALL BE MADE BACK TO MAINS AS INDICATED BY THE HATCHING. WORK ASSOCIATED WITH THE MAINS SHALL BE DONE DURING OFF HOURS. J. CONTRACTOR SHALL BE RESPONSIBLE TO KEEP ALL PHASES OF CONSTRUCTION AREA UNDER A NEGATIVE MODE AND SHALL BE CERTIFIED. PROVIDE A DIGITAL PRESSURE DIFFERENTIAL MEASUREMENT WITH INDICATION TO 0.01 INCHES OF PRESSURE DIFFERENTIAL OUTSIDE THE CONSTRUCTION SITE THAT MEASURES THE PRESSURE WITHIN THE CONSTRUCTION SITE. GAUGE SHALL BE READ AND SIGNED BY THE CONTRACTOR INDICATING NEGATIVE PRESSURE IN THE CONSTRUCTION AREA. WHEN THE BUILDING AIR DISTRIBUTION SYSTEM IS USED TO MAINTAIN NEGATIVE MODE, THE CONTRACTOR SHALL PROVIDE TEMPORARY FILTER MEDIA ON ALL RETURN AND EXHAUST OPENINGS IN THE CONSTRUCTION AREA. THE FILTER MEDIA SHALL BE REPLACED WHEN DIRTY OR WHEN DIRECTED BY THE ENGINEER. 0 7 KEY PLAN SCALE: NONE 12" 0 5' 10' 15' III I I I I I I I SCALE: 1/8"=V-0" l w U. C U E STUDIO THREE DESIGN arOiteeture �— interior design www.studio3designmet 317 595.1000 main 317 572.1236 fax 8604 Allisonville Road, Suite 330 Indianapolis, IN 46250 CONSULTANT BIAGI, CHANCE, CUMMINS, LONDON, TITZER, INC. CONSULTING ENGINEERS INDIANA - KENTUCKY - MISSOURI - NEW JERSEY 1060 Capitol Avenue Suite E240 Inciianapolis, IN 46204 www. B C C LT. co m PH ON E: 317-968-0239 FAX: 317-968-0235 v z Q0 0 v -' O � � N m O �o � Z � U Qz � J �— W W W w ::F �J:::Frl w a. 0 z 0 w z P RO) ECT N O . 10977 DATE 2-8-11 REVISIONS CERTIFICATION 0 �;••� S TER No. 19447 -a** STATE OF ;00"',VDI 0Nh-o � _0000 0 W 2 -8 -II SHEET DESCRIPTION TH I RD FLOOR H VAC REMOVAL PLAN SHEET NUMBER M100 THIS DRAWING IS THE PROPERTY OF STUDIO 3 DESIGN, INC., ALL RIGHTS RESERVED.