C. OWNER SHALL BE GIVEN FIRST CHOICE ON ALL EQUIPMENT BEING REMOVED THAT WILL NOT BE
RELOCATED. CONTRACTOR SHALL REVIEW THE EXISTING EQUIPMENT WITH OWNER. EQUIPMENT BEING
REMOVED OR RELOCATED SHALL BE REMOVED IN A MANNER THAT REUSE IS POSSIBLE AND
STORED AS DIRECTED BY OWNER. ALL OTHER EQUIPMENT SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED & DISPOSED OF FROM THE SITE BY THE CONTRACTOR.
D. CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS, CEILINGS, ETC. WHERE REQUIRED BY THE
REMOVAL OF EQUIPMENT, DUCTWORK, AND ACCESSORIES. PATCHING SHALL MATCH EXISTING
CONSTRUCTION & FINISHES. COORDINATE ALL PATCHING AND FINISHES WITH ARCHITECT. PATCHING
OF FIRE WALLS SHALL MEET THE RATING AND SHALL BE INSTALLED PER ARCHITECTURAL
SPECIFICATION.
E. IF EQUIPMENT TO REMAIN MUST BE REMOVED DUE TO REMOVAL OR CONSTRUCTION, THE EQUIPMENT
SHALL BE RELOCATED IN A MANNER THAT IS ACCEPTABLE BY THE ARCHITECT/ENGINEER.
F. PROPER CONNECTIONS, MATERIALS, AND SIZES OF DUCTWORK/PIPING SHALL BE MAINTAINED TO
ENSURE EQUIPMENT IS MADE FULLY OPERATIONAL.
G. REMOVAL OF EXISTING EQUIPMENT SHALL BE MADE SO THAT SERVICE TO OTHER AREAS UTILIZED BY
THE OWNER ARE NOT INTERRUPTED WITHOUT CONSENT FROM OWNER. PROVIDE TEMPORARY VALVES
AND TEMPORARY SERVICES REQUIRED DURING REMOVALS AND CONSTRUCTION.
H. REMOVE COMPLETELY ALL EXISTING HVAC EQUIPMENT, ALL ASSOCIATED PIPING, CONTROLS, AND
SUPPORTS BEING MADE OBSOLETE BY THIS CONSTRUCTION. REMOVAL OF HVAC DUCTWORK AND
PIPING SHALL BE MADE BACK TO MAINS AS INDICATED BY THE HATCHING. WORK ASSOCIATED WITH
THE MAINS SHALL BE DONE DURING OFF HOURS.
J. CONTRACTOR SHALL BE RESPONSIBLE TO KEEP ALL PHASES OF CONSTRUCTION AREA UNDER A
NEGATIVE MODE AND SHALL BE CERTIFIED. PROVIDE A DIGITAL PRESSURE DIFFERENTIAL
MEASUREMENT WITH INDICATION TO 0.01 INCHES OF PRESSURE DIFFERENTIAL OUTSIDE THE
CONSTRUCTION SITE THAT MEASURES THE PRESSURE WITHIN THE CONSTRUCTION SITE. GAUGE
SHALL BE READ AND SIGNED BY THE CONTRACTOR INDICATING NEGATIVE PRESSURE IN THE
CONSTRUCTION AREA. WHEN THE BUILDING AIR DISTRIBUTION SYSTEM IS USED TO MAINTAIN
NEGATIVE MODE, THE CONTRACTOR SHALL PROVIDE TEMPORARY FILTER MEDIA ON ALL RETURN AND
EXHAUST OPENINGS IN THE CONSTRUCTION AREA. THE FILTER MEDIA SHALL BE REPLACED WHEN
DIRTY OR WHEN DIRECTED BY THE ENGINEER.
0
7
KEY PLAN
SCALE: NONE
12" 0 5' 10' 15'
III I I I I I I I
SCALE: 1/8"=V-0"
l
w
U.
C
U
E
STUDIO
THREE
DESIGN
arOiteeture �— interior design
www.studio3designmet
317 595.1000 main 317 572.1236 fax
8604 Allisonville Road, Suite 330 Indianapolis, IN 46250
CONSULTANT
BIAGI, CHANCE, CUMMINS,
LONDON, TITZER, INC.
CONSULTING ENGINEERS
INDIANA - KENTUCKY - MISSOURI - NEW JERSEY
1060 Capitol Avenue Suite E240
Inciianapolis, IN 46204
www. B C C LT. co m
PH ON E: 317-968-0239 FAX: 317-968-0235
v
z
Q0
0
v -'
O
� � N
m O
�o
� Z �
U Qz
� J
�— W W
W w ::F
�J:::Frl
w
a. 0
z
0
w
z
P RO) ECT N O .
10977
DATE
2-8-11
REVISIONS
CERTIFICATION
0
�;••� S TER
No. 19447
-a** STATE OF
;00"',VDI 0Nh-o �
_0000
0
W
2 -8 -II
SHEET DESCRIPTION
TH I RD FLOOR
H VAC REMOVAL
PLAN
SHEET NUMBER
M100
THIS DRAWING IS THE PROPERTY
OF STUDIO 3 DESIGN, INC.,
ALL RIGHTS RESERVED.