Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M002.0
Products PlotID Length Product Plies Net Qty FJ1 18-00-00 11-7/8" BCI® 5000s-1.8 1 22 FJ2 10-00-00 11-7/8" BCI® 5000s-1.8 1 4 FJ3 6-00-00 11-7/8" BCI® 5000s-1.8 1 2 FJ4 4-00-00 11-7/8" BCI® 5000s-1.8 1 5 FJ5 36-00-00 11-7/8" AJS® 24 1 3 FJ6 22-00-00 11-7/8" AJS® 24 1 6 FJ7 20-00-00 11-7/8" AJS® 24 1 3 BM1 20-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM2 20-00-00 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 3 3 BM3 10-00-00 11-7/8" BCI® 5000s-1.8 1 1 BM4 8-00-00 11-7/8" BCI® 5000s-1.8 1 1 BM5 4-00-00 11-7/8" BCI® 5000s-1.8 1 1 BM6 2-00-00 11-7/8" BCI® 5000s-1.8 1 1 Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 14 Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 49 Connector Summary PlotID Qty Manuf Product Hu1 1 USP SKH2024L Hu2 3 USP SKH2024R Hu3 7 USP THF20112 Hu4 1 USP THF20112 Hu5 1 USP THF20112 E1E2E3 E4E5 E6E7 E8 E9 E10E11E12E13 4 56 7 8 BM2 BM1BM6 BM5BM4BM3 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1Ca1Ca1Ca1Ca1Ca1 Bk1 FJ5 FJ3 FJ3FJ4FJ7 FJ7 FJ7 Hu4Hu1Hu3 Hu24 Hu5Hu2Hu3 FJ6FJ1FJ1 FJ5 FJ1 FJ2FJ4 Bk1Bk1Bk1 Bk1 Bk1Bk11-05-07 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 4-02 4-06 1-06-00 9-07 10-15 1-06-00 9-07 1-07-03 10-15 1-06-00 10-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-08-07 1-05-15 1-07-03 4-1311-00 9-001-07-031-07-031-07-031-07-031-00-03Sheet: 1/1 DWG: Order #: By: Date: 8/2/2018 Scale: NTS BC FRAMER18070361 28TheGrove SecondFloor NOTE:ALLMEASUREMENTSTOBEVERIFIED INTHEFIELD. Revisions: BY: cut, notch or drill flanges DO NOT DN01 above to bearing below. Solid block all posts from F08 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FOR DETAILS NOT SHOWN All I- Joists and Versa-Lam Beams Must Be Installed per The Boise Cascade Installation Guide! ----------------------------- Todo yo- los Rayos de Viguetas y Versa-Huída Deben Ser Instalados por La Guía de la Instalación de Cascada de Boise! FOR MULTIPLE PLY BEAM CONNECTION SEE THE "CONNECTION DIAGRAM" SUPPLIED WITH JOB PACKAGE 08/10/18 Mike Sheeks