Loading...
HomeMy WebLinkAboutM002.0Products PlotID Length Product Plies Net Qty FJ1 18-00-00 11-7/8" BCI® 5000s-1.8 1 22 FJ2 10-00-00 11-7/8" BCI® 5000s-1.8 1 4 FJ3 6-00-00 11-7/8" BCI® 5000s-1.8 1 2 FJ4 4-00-00 11-7/8" BCI® 5000s-1.8 1 5 FJ5 36-00-00 11-7/8" AJS® 24 1 3 FJ6 22-00-00 11-7/8" AJS® 24 1 6 FJ7 20-00-00 11-7/8" AJS® 24 1 3 BM1 20-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM2 20-00-00 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 3 3 BM3 10-00-00 11-7/8" BCI® 5000s-1.8 1 1 BM4 8-00-00 11-7/8" BCI® 5000s-1.8 1 1 BM5 4-00-00 11-7/8" BCI® 5000s-1.8 1 1 BM6 2-00-00 11-7/8" BCI® 5000s-1.8 1 1 Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 14 Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 49 Connector Summary PlotID Qty Manuf Product Hu1 1 USP SKH2024L Hu2 3 USP SKH2024R Hu3 7 USP THF20112 Hu4 1 USP THF20112 Hu5 1 USP THF20112 E1E2E3 E4E5 E6E7 E8 E9 E10E11E12E13 4 56 7 8 BM2 BM1BM6 BM5BM4BM3 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1Ca1Ca1Ca1Ca1Ca1 Bk1 FJ5 FJ3 FJ3FJ4FJ7 FJ7 FJ7 Hu4Hu1Hu3 Hu24 Hu5Hu2Hu3 FJ6FJ1FJ1 FJ5 FJ1 FJ2FJ4 Bk1Bk1Bk1 Bk1 Bk1Bk11-05-07 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 4-02 4-06 1-06-00 9-07 10-15 1-06-00 9-07 1-07-03 10-15 1-06-00 10-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-08-07 1-05-15 1-07-03 4-1311-00 9-001-07-031-07-031-07-031-07-031-00-03Sheet: 1/1 DWG: Order #: By: Date: 8/2/2018 Scale: NTS BC FRAMER18070361 28TheGrove SecondFloor NOTE:ALLMEASUREMENTSTOBEVERIFIED INTHEFIELD. Revisions: BY: cut, notch or drill flanges DO NOT DN01 above to bearing below. Solid block all posts from F08 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FOR DETAILS NOT SHOWN All I- Joists and Versa-Lam Beams Must Be Installed per The Boise Cascade Installation Guide! ----------------------------- Todo yo- los Rayos de Viguetas y Versa-Huída Deben Ser Instalados por La Guía de la Instalación de Cascada de Boise! FOR MULTIPLE PLY BEAM CONNECTION SEE THE "CONNECTION DIAGRAM" SUPPLIED WITH JOB PACKAGE 08/10/18 Mike Sheeks