Loading...
HomeMy WebLinkAboutM004.0Products PlotID Length Product Plies Net Qty FJ1 28-00-00 11-7/8" BCI® 5000s-1.8 1 1 FJ2 26-00-00 11-7/8" BCI® 5000s-1.8 1 12 FJ3 18-00-00 11-7/8" BCI® 5000s-1.8 1 12 FJ4 14-00-00 11-7/8" BCI® 5000s-1.8 1 5 FJ5 12-00-00 11-7/8" BCI® 5000s-1.8 1 10 FJ6 10-00-00 11-7/8" BCI® 5000s-1.8 1 2 FJ7 6-00-00 11-7/8" BCI® 5000s-1.8 1 3 FJ8 4-00-00 11-7/8" BCI® 5000s-1.8 1 9 BM1 18-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM2 14-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 4 BM3 12-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM4 22-00-00 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 3 3 BM5 24-00-00 1-3/4" x 24" VERSA-LAM® 2.0 3100 SP 2 2 BM6 26-00-00 11-7/8" BCI® 5000s-1.8 1 1 BBO1 10-00-00 3-08 x 1-00-00 Generic Material 1 1 BBO2 10-00-00 3-08 x 1-00-00 Generic Material 1 1 Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 10 Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 42 PBO1 10-00-00 5-04 x 3-08 Generic Material 1 1 Connector Summary PlotID Qty Manuf Product Hu1 12 USP THF20112 Hu2 17 USP THF20112 Hu3 12 USP THF20112 E1 E2E3 E4E5 E6E7 E8 E9E10 E13E14 E15E16 E17 1 234 5 E30E31 BM2 BBO1BBO2 BM3 BM4 BM5BM1 BM2 BM6 Ca1Ca1 Ca1Ca1 Ca1 Ca1Ca1 Ca1 Ca1 Ca1 Ca1 Bk1Bk1Bk1Bk1FJ4 FJ1 FJ2 9 10 FJ8FJ3FJ3 FJ5FJ7FJ6FJ2FJ4FJ8 Bk1 Bk1 Bk1Bk1 Bk11-06-10 1-07-03 1-06-03 1-08-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 11-06 7-13 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 6-11 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 9-14 1-06-08 1-07-03 1-07-03 1-09-11 1-07-031-07-031-07-031-07-031-07-031-07-00Sheet: 1/1 DWG: Order #: By: Date: 8/1/2018 Scale: NTS BC FRAMER18070360 27TheGrove atLegacy SecondFloor NOTE:ALLMEASUREMENTSTOBEVERIFIED INTHEFIELD. Revisions: BY: cut, notch or drill flanges DO NOT DN01 above to bearing below. Solid block all posts from F08 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FOR DETAILS NOT SHOWN All I- Joists and Versa-Lam Beams Must Be Installed per The Boise Cascade Installation Guide! ----------------------------- Todo yo- los Rayos de Viguetas y Versa-Huída Deben Ser Instalados por La Guía de la Instalación de Cascada de Boise! FOR MULTIPLE PLY BEAM CONNECTION SEE THE "CONNECTION DIAGRAM" SUPPLIED WITH JOB PACKAGE 08/16/18 Mike Sheeks