Loading...
HomeMy WebLinkAbout4TI C=Jy.ZT]E1qMD Existing Storm Sewer Existing Sanitary Sewer New Sanitary Sewer (Laterals are dawn for mfemw ady see smttary PM a ftfks for Laoadms) Q Sanitary Structure Number Existing Contour Existing Elevation v Existing Fire Hydrant Existing Water Valve Existing Utility Pole Existing Trees x x x' x— Silt Fence. See Sheet 1-803. 1. EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2-4 OF 'PRECONSTRUCTION ACTIVITIES' ON SHEET C301 HAVE BEEN COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN. 2. RULE 5 REQUIRES ALL DISTURBED AREAS THAT WILL POTENTIALLY BE IDLE FOR 15 DAYS OR MORE TO BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 3. ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE REQUIRED IN THE FIELD BY CITY OF CARMEL 4. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN THE STREETS. 5. APPROXIMATE CONSTRUCTION SCHEDULE: START DATE SEPTEMBER 1, 2013 COMPLE11ON DATE: JUNE 1, 2014 6. RECEIVING WATER = WHITE RIVER 7. LATITUDE 3957'00' N LONGITUDE 86'08'24' W 8. CONTACT PERSON: CARMEL—CLAY PARK do RECREATION MARK WESTERMEIER, DIRECTOR 1411 EAST 116TH STREET CARMEL, INDIANA 46032 PH: (317) 848-7275 10. WARNING: THIS SHEET TO BE USED FOR STORM WATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE SHEETS L101. 11. SEE SHEETS 1-801-1-803 FOR ALL STORM WATER POLLUTION PREVENTION PLAN DETAILS do NOTES PRE—CONSTRUCTION ACTIVITIES 1. Earthmoving activities may not begin until after items 2-4 have been completed. 2. Install temporary stone access drive off of 116th Street. 3. Construct staging area near construction entrance as shown sheet L301. Also construct Rule 5 information posting box, install trash dumpster, and place port—o—let as shown on 1-803. 4. Install silt fencing as shown on sheet 1-301-1-302. 5. Strip topsoil or organic matter from Construction area. 6. If work on site will stop for two weeks or more after completion of mass grading, install temporary seed as indicated on charts located on Sheet 1-803. 7. Maintain all inlet protection and silt fencing in this project by cleaning out every week and after every storm event. 0 20' 40' SCALE: 1' = 20' Sllklt: Know what's below. -4w Call before you dg. Ross�'''�i; No. r LA20700037 STATE OF �S �NDI AN.P . k A o %��,qpE ARC` DATE: 07.25.2013 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. © COPYRIGHTED BY THE SCHNEIDER CORP. (2013) f4lbl Schneider DATE: PROJECT NO.: O_ 4377.006 DRAWN BY: CHECKED BY: ZB MK w PRE—CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: SHEET NO.: ld30n LU m f1 � Z Z W LU Q U 1-1- Z V 0= < Q� Uv :D lP w O � � < DATE: PROJECT NO.: 7/25/13 4377.006 DRAWN BY: CHECKED BY: ZB MK SHEET TITLE: PRE—CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: SHEET NO.: ld30n