Loading...
HomeMy WebLinkAbout7--4 wmw� 0 9%Kww whafe below. rta 11 Kanra tin Tr 2 /r—=Tc7s��11TTrIv% y%1%4 Hatch Pattern denotes Temporary Lawn 1-y Seeding. See Sheet L803 for seed mix. Hatch Pattern denotes Permanent Lawn 4 Seeding. See Sheet L803 for seed mix. A Hatch Pattern denotes Native Prairie Seed. See Sheet L803 for seed mix. Existing Storm Sewer Existing Sanitary Sewer 060 New Sanitary Sewer (Utor* am am= off MWOM owy See SmIlay Pkm & Proda for Locatlam) '4- � � "r ','F, 24 Sanitary Structure Number Existing Contour Existing Elevation .-F *(yo Existing Fire Hydrant Existing Water Valve A Existing Utility Pole A Existing Trees X—X—X—X— Silt Fence. See Sheet 1-803. oo >< Ow —4 OF "PRECONSTRUCTION ACTIVITIES* ON SHEET 1. EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2 C301 HAVE BEEN COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN. MORE TO QUIRES ALL DISTURBED AREAS THAT WILL POTENTIALLY BE IDLE FOR 15 DAYS OR Y BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 3. ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE REQUIRED IN THE FIELD BY CITY OF CARMEL 00 o" REETS 4. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN THE ST 0 0 5. APPROAMATE CONSTRUCTION SCHEDULE. START DATE: SEPTEMBER 1, 2013 COMPLETION DATE: JUNE 1, 2014 6. RECOVING WATER WHITE RIVER 7. LA11TUDE 39*57'00* N LONGITUDE 86*08'24" W 8. CONTACT PERSON: CARMEL—CLAY PARK & RECREATION MARK WESTERMEIER, DIRECTOR 1411 EAST 11 6TH STREET CARMEL, INDIANA 46032 PH: (317) 848-7275 10. WARNING. THIS SHEET TO BE USED FOR STORM WATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE SHEETS 1-101-1-102 11. SEE SHEETS L801—LB03 FOR ALL STORM WATER POLLUTION PREVENTION PLAN DETAJLS NOTES �,K 7 SITE SPECIFIC CONSTRUCTION ON SEQUENCE FOR CONSTRUCTI PHASE J 1. Repair or replace silt fence installed during mass earthwork phase. 2, Repair construction entrance installed in mass grading phase. e washout basin as indicated on plans. vv; V, 3. Install or repair concret ss grading. 4. Repair Construction Staging area originally set up during ma 5. Complete and/or repair earthwork and compaction for pavement subgrades pavement subbase material. and install 6. Complete earthwork and finish grading for seeded areas. Apply seed and mulch within 30 hours of seedbed preparation. 7. Permanently seed, and mulch where indicated on plans. rbing 10. Stabilization of a project site is considered achieved when all land distu activities have been completed and a uniform perennial vegetative cover with a density of seventy percent (707.) has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures have been employed. 11. The contractor shall maintain erosion control measures and devices during construction and until siltation will not longer occur. 12. After contractor has removed temporary erosion control measures any disturbed areas shall be re—seeded as required. 20' 40' SCALE: 1' = 20' Q Cn W Ix F5 or -i E 'O"a KRo k S A No. 9 LA20700037 % STATE OF DATE-- 07.25.2013 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN MOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2013)1 Sch ider DATE: PROJECT NO.: 'Z 4377.006 DRAWN BY: CHECKED BY- ZB MK < -IVC'4 PREVE)MON P DRAWING FILES: > LLA rn CZ < 40 - OL— U ) V— < �z V— LLI CL Lt -1 LL - LU LU UA LLI < < Ld LO LU LL- < DATE: PROJECT NO.: 7/25/13 4377.006 DRAWN BY: CHECKED BY- ZB MK SHEET TITLE: STORMWATER P011UTION PREVE)MON P DRAWING FILES: SHEET NO.: