HomeMy WebLinkAboutWhite Construction/Eng/CO #1/27,431.20/3rd Ave SW and City Center RAB – Project #16-ENG-108I/v CITY OF CARMEL �aRop� D TO: Jeremy Kashman CONTRACT CHANGE ORDER NO.: 1 City Engineer DATE: July 17, 2018 City of Carmel Indiana PROJECT NAME: 3rd Ave SW and City Center RAB One Civic Square CITY REQ. NO.: Carmel, IN 46032 CITY PO NO.: 16 -ENG -108 CITY PO DATE: 1. You are directed to make the following changes in this Contract: Item 0055 - Deletion of Field Office, B Item 0186 - Deletion of existing pay item for Roll Curb for Truck Apron, Granite Item 0187 - Addition of pay item for 10" EZ Valve and all related work. Item 0188 - Addition of new pay item for Roll Curb for Truck Apron, Granite Item 0189 - Addition of new pay item for relocation of Carmel Communication Handhole Item 0190 - Addition of new pay item for 4 Ft x 4 Ft Carmel Communication Handhole SCHEDULED ADJUSTMENT ITEM AMOUNT H OR ( - ) DAYS Il. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 3,288,270.00 Contract Price will be increased/decreased by this Change Order $ 27,431.20 New Contract Price including this Change Order $ 3,315,701.20 Contract Time prior to this Change Order 0 Days 7/l/2018 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 0 Days 7/1/2018 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Accepted Approved Recommended . I , American Structurepoint, Inc. White Construction ENGINEER CONTRACTOR 7260 Shadeland Station 3900 East White Ave., PO Box 249 Address Address Indianapolis, IN 4626 Clinton. IN 47842 Cm;!statC.ZjP C,n,-staterzip By: By: Phone: 111-7-6t -1563 Phone: 31-7, .36Z — yz 17 aryl -nn LVrh9/,4N1emper LoriL�. Member Ta a , City Engiine^er �� Christine S. Pauley. Clerk-Treasu er Date: 7' ZC " 1$Date: 7 -4 ('r Date:A� Total Deductions: $23,795.00 Total Additions: $51,226.20 Net Total: $27,431.20 N Change Order #1 - 3rd Avenue SW and City Center Drive RAB (City of Carmel 16 -ENG -108) Item No. Description Unit Cost Quantity Unit Total Cost Deducts Addition Work Performed 0055 Field Office, B $1,500.00 3 MOS $4,500.00 v 0186 Roll Curb for Truck Apron, Granite $85.00 227 LFT $19,295.00 c 0187 10" EZ Valve $14,596.30 1 LS $14,596.30 0188 Revised Roll Curb for Truck Apron. Granite $125.70 227 LFT $28,533.90 0189 Relocate Carmel Communication Handhole $1,265.00 1 LS $1,265.00 0190 Carmel Communication Handhole, 4 FT x 4 FT $6,831.00 1 LS $6,831.00 Total Deductions: $23,795.00 Total Additions: $51,226.20 Net Total: $27,431.20 N FZ7WHI I o WARD ml�- April 18, 2018 David Machala America7t Structurepoint Inc. Cell: (317) 281-9563 Email: dmachalaiastructurepoint.com Regarding: 10" EZ Valve REVISED Project No. 16 -ENG -108 Gentlemen: -4018-7- to t r E Z VALVE 3900 East WhiteAvenue P.O. Box 249 C* ton, IN 47842 Te! (800) 355 9401 Fax (765) 832 2075 www.whteconstruction.com We respectfully request a change order in the amount of $10,752.00 for the 10" EZ Valve requested on Project No. 16 -ENG -108. Please see the attached backup for your records. Please feel free to contact me with any questions or concerns. Marc Waltermann White Construction, Inc. Project Manager Cell: 317-362-4217 marc.waltermann@whiteconstruction.com {. 2�a4o. a0 `VS � #13,6`12.aO + g,�o3. 50 �14�5c�6,3o l Ls M Equal Opportunity Employer. 3/11 WHITE CONSTRUCTION Bid Date: 04/18/2018 05:00 p.m. Core & Main Bid #: 576388 Seq# Qty COREzm- Formerly HD Supply Waterworks Bid Proposal for EZ Valve - Carmel Description Core & Main 1454 Liberty Dr Bloomington, IN 47403 Phone: 812-331-0356 Fax: 812-331-0371 Units Price Ext Price 10 1 10" EZ VALVE CI/DI/C-900 0/L 11.10-11.20 OD RANGE EA 9,600.00 9,600.00 04/18/2018 - 8:56 AM Actual taxes may vary Page 2 of 3 TERMS AND CONDITIONS OF SALEf"Temns") 1, All references In this document to "Seller" shall include Care & Main LP and / or any parent, subsidiary or affiliate of Core & Main LP (Including any division of the foregoing) whether or not performing any or all of the scope hereunder or specifically identified herein. AN references to "Buyer" shall include all parent(s), subsidiaries and affiliates of the entity placing the order. Buyer and Seller may be referred to individually as a "Party" and collectively as "Parties". 2. AN sales to Buyer are subject to these Tema, which shall prevail over any inconsistent terms of Buyer's purchase order or other documents. Additional or different terms and conditions in any way altering or modifying these Terms are expressly objected to and she$ not be binding upon Seller unless specifically accepted in writing by Sellers authorized representative. No modification or alteration or these Tema shall result by Seller's shipment of goods following receipt of Buyer's purchase order, or other documents containing additional, confNding or inconsistent terns. There are no terms, conditions, understandings, or agreements other than those stated herein, and all prior proposals and negotiations are merged herein. These Tema are binding on the Parties, their successors, and permitted assigns, 3, Prices on Seller website, catalogs or In Seller quotes are subject to change without notice, and all such prices expire and become Invalid If not accepted within 10 calendar days from the date of issue, unless otherwise noted by Seller In writing. Price extensions If made are for Buyers convenience only, and they, as well as any mathematical, stenographic or clerical errors, are not binding on Seller, Prices shown do not include any sales, excise, or other govemmerdal tax or charge payable by Seller to any federal, state or local authority, Any taxes now or hereafter Imposed upon sales or shipments will be added to the purchase price, and Buyer shall reimburse Seller for any such tax or provide Seiler with an acceptable tax exemption certificate. All prices and other terms provided to Buyer shall be kept confidential except to the extent a Party is required by law to disclose the same. 4. Seller shall not be liable for delay or default in delivery resulting from any cause beyond Sellers reasonable control, including, but not limited to, govemmental action, strikes or other labor troubles, fire, damage or destniction of goods, wars (declared or undeclared), ads of terrorism, manufacturers' shortages, avdlability or timeliness of transportation, materials, fuels, or supplies, and ads of God (each a "Force Majeure Event'), Upon the occurrence of a Force Majeure Evert; (a) the time for Setters performance shall be extended reasonably and the Parties shall adjust all affected dates accordingly; (b) the purchase price shall be adjusted for any increased costs to Seller resulting from such Force Majeure Event; and (c) Buyer shall not be entitled to any other remedy, 5. Seller is a reseller of goods only, and as such does not provide any warranty for the goods it supplies hereunder, Notwithstanding this As -Is limitation, Seller shall pass through to Buyer any transferable manufacturers standard warranties with respect to goods purchased hereunder, BUYER AND PERSONS CLAIMING THROUGH BUYER SHALL SEEK RECOURSE EXCLUSIVELY FROM MANUFACTURERS IN CONNECTION WITH ANY DEFECTS IN OR FAILURES OF GOODS, AND THIS SHALL BE THE EXCLUSIVE RECOURSE OF BUYER AND PERSONS CLAIMING THROUGH BUYER FOR DEFECTIVE GOODS, WHETHER THE CLAIM OF BUYER OR THE PERSON CLAIMING THROUGH BUYER SHALL SOUND IN CONTRACT, TORT, STRICT LIABILITY, PURSUANT TO STATUTE, OR FOR NEGLIGENCE: BUYER SHALL PASS THESE TERMS TO SUBSEQUENT BUYERS AND USERS OF GOODS. SELLER EXCLUDES AND DISCLAIMS ALL OTHER EXPRESS AND IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TOt ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. SELLER ASSUMES NO RESPONSIBILITY WHATSOEVER FOR SELLER'S INTERPRETATION OF PLANS OR SPECIFICATIONS PROVIDED BY BUYER, AND BUYER'S ACCEPTANCE AND USE OF GOODS SUPPLIED HEREUNDER SHALL BE PREMISED ON FINAL APPROVAL BY BUYER OR BY BUYER'S RELIANCE ON ARCHITECTS, ENGINEERS, OR OTHER THIRD PARTIES RATHER THAN ON SELLER'S INTERPRETATION, TO THE EXTENT NOT PROHIBITED BY APPLICABLE LAW, IN NO EVENT, WHETHER IN CONTRACT, WARRANTY, INDEMNITY, TORT (INCLUDING, BUT NOT UMITED TO, NEGLIGENCE), STRICT LIABILITY OR OTHERWISE, ARISING DIRECTLY OR INDIRECTLY OUT OF THE PERFORMANCE OR BREACH OF THESE TERMS, SHALL SELLER BE LIABLE FOR (a) ANY INCIDENTAL, INDIRECT, PUNITIVE, SPECIAL, CONSEQUENTIAL OR SIMILAR DAMAGES SUCH AS LOSS OF USE, LOST PROFITS, ATTORNEYS' FEES OR DELAY DAMAGES, EVEN IF SUCH DAMAGES WERE FORESEEABLE OR CAUSED BY SELLER'S BREACH OF THIS AGREEMENT, (b) ANY CLAIM THAT PROPERLY IS A CLAIM AGAINST THE MANUFACTURER, OR (c) ANY AMOUNT EXCEEDING THE AMOUNT PAID TO SELLER FOR GOODS FURNISHED TO BUYER WHICH ARE THE SUBJECT OF SUCH CLAIM(S). ALL CLAIMS MUST BE BROUGHT "THIN ONE YEAR OF ACCRUAL OF A CAUSE OF ACTION. S. Buyer shall indemnify, defend, and told Seger its officers, directors, employees and agents harmless from any and all costs (Including attorneys' and socaxrtants' fees and expenses), liabilities and damages resulting from or related to any third party (including Buyers employees) claim, complaint and/or judgment aching from Buyers use of any goods furnished hereunder, as well as any negligent, Intentional, or tortious ad or omission of Buyer or any material breach by Buyer of these Terms. 7. When goods are delivered to Buyer In Sellers own vehicles, the F.O.B. point shall be Buyers designated delivery site. In all other cases the F.0.8. point shall be Sellers store or warehouse and all responsibility and costs of shipping and delivery beyond the applicable F.O.B, point shall be borne by Buyer. Tide and risk of loss shah pass to Buyer at the applicable F.O.B. point, which for goods not delivered in Sellers own vehicles shall be when Sellar delivers the goods to the common carrier, All claims for shortage of goods or for loss or damage to goods as to witch Seller has the risk of loss shall be waived unless Buyer, within 10 calendar days after receipt of the short or damaged shipment, gives Seller written notice fulty describing the aileged shortage or damage. Partial shipments aro permitted at Sellers discretion. 8. Arty change In product specifications, quantities, destinations, shipping schedules, or any other aspect of the scope of goods must be agreed to in writing by Sellar, and may result in a price and delivery adjustment by Seller. No credit for goods returned by Buyer she$ be given without Sellers written authorization. All returns are subject to a restocking charge. 9. Unless otherwise agreed In writing, payment terms are net 30 days from delivery, payable in United States of America CU.S."j dollars. Notwithstanding the foregoing, all orders are subject to Seller's continuing approval of Buyers credit. If Buyers credit is not approved or becomes unsatisfactory to Seller then Seller, In its sob discretion, may suspend or cancel performance, or require different payment terms, Including but not limited to cash on delivery or in advance of shipment. In addition, Seller may In its dlscreUon require an advance deposit of up to 1 Dft. of Sellers selling price for any specially manufactured goods ordered by Buyer hereunder, Payments due hereunder shah be made In the form of cash, check, or money order, or other tender approved in writing by Seller, Seller may, in its sole discretion, apply Buyers payment against any open charges. Past due accounts bear Interest at the lesser of 1.5% per month or the maximum rate permitted by apphcalole law, continuing after Seiler obtains judgment against Buyer. Seller may exercise setoff or recoupment to apply to or satisfy Buyers outstanding debt. Buyer shall have no right of setoff hereunder, the same being wWessry waived hereby. Seller expressly reserves Its right to file Ilens if payment is not received for its materials and expressly disclaims any waiver of lien rights language which may be contained in any future agreements between the Parties hereto, Seller reserves all rights to invoice and be paid for materials provided to Buyer and any terms contained in any of Buyers purchase orders or other documents that purport to limit in any way the time or manner within which Seller may invoice are hereby waived by Buyer. 10, Buyer shag not export or re-export, directly or indirectly, all or any part of the goods or related technology obtained from Seiler under these Terms except In accordance with applicable export laws and regulations of the U.S. Further, a Buyer that Is a non -U.S. company or citizen shall sirni arly Ilmlt any export or reexport activity to that which would be deemed compliant with U.S. export laws and regulations it performed by a U.S. company or citizen, 11. Buyer shag pay Seller all costs and expenses of collection, suit, or other legal action brought as a result of the commercial relationship between them, inducing, but not limited to, all actual attorneys' and paralegals' fees, and collection costs. Incurred pro -suit, through trial, on appeal, and in any administrative or bankruptcy proceedings. Any cause of action that Seller has against Buyer may be assigned without Buyers consent to Core & Main LP or to any affiliate, parent or subsidiary of Core & Main LP, 12. This Agreement, Buyers account, and the business relationship between Buyer and Seller shall be governed by and construed in accordance with the laws of the state where the applicable project is located without reg4rd to corActs of laws rules, and specifically excluding the UN Convention on Contracts for the International Sale of Goods. The Parties agree that any legal action arising under or related to this Agreement may be brought In the applicable federal or state court where the project is located, and any right to object to such venue or to assert the inconvenience of such forum Is hereby waived. 13, K Buyer fails to comply with these Terms, Seller may terminate or restrict any order immediately upon notice to Buyer. Buyer certifies that It is solvent and that It wig advise Seiler Immediately If 9 becomes insolvent, Buyer agrees to send Sellar written notice of any changes In the form of ownership of Buyers business within 5 days of such changes. Buyer and Seger am the only intended beneficiaries of this document, and there are no third party banef ciarles. 14. The invalidity or unerdoreeability of all or part of these Terms will not aged the validity or enforceability of the other terms. The parties agree to replace any void cr unenforceable term with a new term that achieves substantially the same practical and economic effect and is valid and enforceable. 15, The following provisions shall survive termination, cancellation and completed performance of this Agreemert as long as necessary to allow the aggrieved party to fully enforce such clauses: 5, 0, 4, 10, 11 and 12. Core & Main LP Tema and Conditions of Sale - Rev 082917 `/Z 2 � !W 1(7.tl-ij,01 I; `3. i, -4, u.',^-A& i., W.- 1; - W? Aft RA 1-4 i kGi- M, ZIJI'� P^kiw', L� 0 M-1- "4:;, OVL44;..A 4% t'4� 4IO-_j Lj�- 11, A _ J4 'Vit t1SA t-0It 4: 4i, q'.- l :4D :I- 41, 7 .­1 n- it, i `vka 4.'k rDV It. at Q, g. ;~C cv% O'l -t, e 1v A -4w, E,1 k., 01" '7 -1 f, .-0 1- ;,At, pu� A P it `C.,; Z. ""e'a -jfll 1.) j Cv. 4:. A "re t 9 :, f 4^ 4v: 1(r 64 I IW-de, .,vI ;;fV;4r ,w? �i-A. fjoeqt-, 'a", r�.. Op C:, Vli' "U"A A.,!t C, j LP4 rot, 'Wig �'Im A:t ou ;I j,"w" 11 :f:.' Ilk -v-; W9 f)O A-Io! iz 1 Fix* �S' Mwwn 77T,: I 9IM4 :'WpK,�.t; x"; .4f. 4 �A 71,�'! V, j 4,�, z 1;X C­." f-4 .1: '361tw.4, - , rl fl, V7WHITE I FORWARD ,,: UJIFJ� ��� �.p„ -r, May 16, 2018 David Machala American Structurepoint Inc. Cell: (317) 281-9563 Email: dmachalaeastructurepoint.com Regarding: 10" EZ Valve Excavation (partial) Project No. 16 -ENG -108 Gentlemen: 3900 East White Avenue P.O. Box 249 C"on, IN 47942 Tel (800) 355 9407 Fax (7851832 2075 www.whiteconstruction.com We respectfully request the amount of $2,940.80 be added to the previously submitted amounts for the installation of the 10" EZ Valve requested on Project No. 16 -ENG -108. Please see the attached backup for your records. Please feel free to contact me with any questions or concerns. Marc Waltermann White Construction, Inc. Project Manager Cell: 317-362-4217 marc.waltermannCcD.whiteconstruction.com M Equal Opportunity Employer. '/Z Fr/W.HITE DESCRIPTION OF WORK PERFORMED: JOB #: 16022-110 TIME & MATERIAL WORK AGREEMENT CUSTOMER: City of Carmel DATE: 5/4/18 Hydro excavate for installation of EZ valve south end of project. EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT (OPERATOR NOT INCLUDED) Time +1/2 RATE HRS DESCRIPTION RATE / HR HR TOTAL ($) SKID STEER $60.00 $0.00 BACKHOE $68.00 $0.00 DOZER -D5 $88.00 $0.00 DOZER -D5 (GPS) $99.00 $0.00 ROLLER $82.00 $0.00 WATER TRUCK $88.00 $0.00 CAT 308 Excavator $74.00 $0.00 CUT-OFF SAW $15.00 $0.00 Compactor $15.00 $0.00 Vacuum Trailer $86.00 2.0 $172.00 $0.00 $0.00 $O.ob $0.00 MARKUP(water material only) $0.00 TRUCKING CO. HRS. # TRUCKS PRICE ($) $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 MARKUP $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE $ $0.00 $0.00 $0.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 15% $o.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% $0.00 MINIMUM CHARGES MAYBE REQUIRED $0.00 $0.00 $0.00 $0.00 $0.00 $0-00 $0.00 EFFECTIVE DATES: Straight Time LABOR RATE HRS Time +1/2 RATE HRS TOTAL LABORER $58.00 $87.00 $0.00 PIPE LAYER $59.00 $88.50 $0.00 OPERATOR $74.00 2.0 $111.00 $148.00 DRIVER $60.00 $90.00 $0.00 FOREMAN $91.00 2.0 $136.50 $182.00 SUPT. $96.00 $144.00 $0.00 FOREMAN & SUPERINTENDENT RATES INCLUDE TRUCKIPHONE/MISC MATERIALS & SUPPLIES QTY. UNIT PRICE $) TOTAL Dump Fee 1 EA $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 S0.00 MARKUP(water material only) $12.00 TRUCKING CO. HRS. # TRUCKS PRICE ($) TOTAL 0 $0.00 50.00 S0.00 $0.00 50.00 MARKUP S0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE $ MARKUP EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY, AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY EQUIPMENT REQUIRING MOBILIZATION ALL MATERIALS WILL BE BILLED AT COST PLUS 15% ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% HOURS ABOVE a PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1 5 TIMES THE STANDARD RATE SUNDAYS ARE AT "DOUBLE TIME" MINIMUM CHARGES MAYBE REQUIRED TOTAL: $614.00 White Construction Company, Inc. Authorizing Party By: By: Printed: Printed: Title: Superintendent Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND SHALL BE CONSIDERED "EXTRA WORK" TO OUR CURRENT CONTRACT AND SHALL BE COMPENSATED BASED UPON THE QUANTITIES AND RATES ABOVE. . l_... �• '.r•1 �`4i •:J:��3'. '=�- � ���i _ -:(�.. ._ J-�Y;.; .11! M..., r���: �''d .. '--. - .-.fir .. .::,. t, . .: >:_. , :;. -,ear 5 -_i ..r :. t.`5. " sf: .hL� i �s.h,.0 r-: !.+ y _:.. -f. _J•.!i 'c`4:. _ -- �:1r "'4�— -_.. r� - � h ,.. _.. ,.. _ ... _._.... —___.. �_..:.- _ .._. _..._ ,._ !','i: s•q' v,.r.P.1fM:ticctr r • { r � JIM r •. .. � � +]!• � is - : .. w -�� _. _. _ _-. _ ^__ - � I t t ! 41 r5� �!', r. {34 Sly +f. • - - � ��� _� 1- ..� - i� ynw a 5 4 s y 177wHrrE TIME & MATERIAL WORK AGREEMENT ut (DIFA :xornp any CUSTOMER: �7 4!-` IL I .l t uti �6 t AJ� DATE: - Z DESCRIPTION OF WORK PERFORMED: % -L V-Als1i: - I D c -51 1 _ ham--� UvacR- ' �►n I +�� �{ �- -i l: utr �(-t.� --k►� - 5. - JOB #:. UZZ' I I EFFECTIVE DATES: EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT (OPERATOR NOT INCLUDED) Time +1/2 RATE HRS DE RI TI N RATE/ HR HR TOTAL ( ) SKID STEER LOADER $60.00 $0.00 BACKHOE $68.00 $0.00 DOZER -05 $88.00 $0.00 DOZER -D5 GPS $99.00 $0.00 ROLLER $82.00 $0.00 WATER TRUCK $88.00 $0.00 CAT 308 EXCAVATOR $74.00 $0.00 CUT-OFF SAW $15.00 $0.00 Compactor $15.00 $0.00 /J $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 HRS. # TRUCKS PRICE ($) TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 WORK PERFORMED QTY PRICE S $0.00 $0.00 $0.00 $0.00 $0.00 R - $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% $0.00 MINIMUM CHARGES MAYBE REQUIRED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 White Constr etion Company, Inc. By: L, Printed: Title: uperintendent Strai ht Time LABOR RATE HRS Time +1/2 RATE HRS TOTAL LABORER $58.00 $87.00 $0.00 PIPE LAYER $59.00 $88.50 $0.00 OPERATOR $74.00 $111.00 $0.00 DRIVER $60.00 $90.00 $0.00 FOREMAN $91.00 $136.50 $0.00 SUPT. $96.00 $144.00 $0.00 FOREMAN & SUPERINTENDENT RATES INCLUDE TRUCK/PHONE/MISC MATERIALS & SUPPLIES QTY. UNIT PRICES TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TRUCKING CO. HRS. # TRUCKS PRICE ($) TOTAL $0.00 $0.00 $0.00 $0.00 MARKUP $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE S MARKUP $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY. AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY EQUIPMENT REQUIRING MOBILIZATION R - ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% HOURS ABOVE 8 PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1.5 TIMES THE STANDARD RATE. SUNDAYS ARE AT -DOUBLE TIME' MINIMUM CHARGES MAYBE REQUIRED By: Printed: Title: Authorizing Party TOTAL: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND SHALL BE CONSIDERED "EXTRA WORK" TO OUR CURRENT CONTRACT AND SHALL BE COMPENSATED BASED UPON THE QUANTITIES AND RATES ABOVE. F�WN1TE DESCRIPTION OF WORK PERFORMED: TIME & MATERIAL WORK AGREEMENT CUSTOMER: City of Carmel Labor & Equipment for EZ valve installationand clean-up.___ JOB #: 16022-110 EQUIPMENT RATES DO NOT APPLY TO SNOW RFNIOVAI EQUIPMENT )OPFRATOR NOT INCLUDED) Time +112 RATE HRS DES RIPTION RATE / HR HR TOTAL ($) SKID STEER $60.00 3.0 $180.00 BACKHOE $68.00 3.0 $204.00 DOZER -05 $88.00 DRIVER $60.00 $0.00 DOZER -D5 (GPS) $99.00 FOREMAN 1 $91.00 40$136.50 $0.00 ROLLER $82.00 SUPT. $96.001 .0 $0.00 WATER TRUCK $88.00 FOREMAN & SUPERINTENDENT RATES INCLUDE TRUCK/PHONE/MISC $0.00 CAT 308 Excavator $74.00 4.0 $296.00 CUT-OFF SAW $15.00 $40.00 $0.00 Compactor $15.00 $0.00 Vacuum Trailer $86.00 $0.00 Loader $94.00 $0.00 CAT 323 Excavator $238.00 $0.00 $0.00 $0.00 MARKUP(water material only) $000 TRUCKING CO. HRS. # TRUCKS PRICE ($) $0.00 Harding 2 1 $100.00 $0.00 $0.00 $0.00 $0.00 MARKUP $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE $ $0.00 $0.00 $0.00 $0.00 AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY ALL MATERIALS WILL BE BILLED AT COST PLUS 15% $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% $0.00 HOURS ABOVE 8 PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1.5 TIMES THE STANDARD RATE SUNDAYS ARE AT 'DOUBLE TIME" MINIMUM CHARGES MAYBE REQUIRED $0.00 $0.00 $0.00- $0.00 $0.00 $0.00 $0.00 EFFECTIVE DATES: DATE: 5018 Strai ht Time LABOR RATE HRS Time +112 RATE HRS TOTAL LABORER $58.00 4.0 587.00 $232.00 PIPE LAYER $59.00 4.0 588.50 $236.00 OPERATOR $74.00 6.0 $111.00 $444.00 DRIVER $60.00 $90.00 $0.00 FOREMAN 1 $91.00 40$136.50 $364.00 SUPT. $96.001 .0 $144.00 $96.00 FOREMAN & SUPERINTENDENT RATES INCLUDE TRUCK/PHONE/MISC MATERIALS & SUPPLIES CITY. UNIT PRICE $ TOTAL Dump Fee 1 EA $40.00 $40.00 50.00 $0.00 50.00 50.00 $0.00 $0.00 MARKUP(water material only) $4.80 TRUCKING CO. HRS. # TRUCKS PRICE ($) TOTAL Harding 2 1 $100.00 $200.00 $0.00 $0.00 $0.00 MARKUP $30.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE $ MARKUP EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY, EQUIPMENT REQUIRING MOBILIZATION AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY ALL MATERIALS WILL BE BILLED AT COST PLUS 15% ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% HOURS ABOVE 8 PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1.5 TIMES THE STANDARD RATE SUNDAYS ARE AT 'DOUBLE TIME" MINIMUM CHARGES MAYBE REQUIRED TOTAL: $2,326.80 White Construction Company. Inc. Authorizing Party By: By Printed: Printed: Title: Superintendent Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND SHALL BE CONSIDERED "EXTRA WORK' TO OUR CURRENT CONTRACT AND SHALL BE COMPENSATED BASED UPON THE QUANTITIES AND RATES ABOVE. PV7WHITE TIME & MATERIAL WORK AGREEMENT ` `( .N• .-:ItF•:•,; CUSTOMER:S�K-�t.L.-��.�r2L fF" rry •I DATE: L",,d /'rrz 14' �- v_a 1 c�s�k�c� ►_J n l t tJ - - DESCRIPTION OF WORK PE7FO MED: JOB #: CLQ-' L z EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT (OPERATOR NOT INCLUDED) Time +V2 RATE HRS DESCRIPTION RATE HR HR TOTAL ( ) SKID STEER LOADER $60.00 $0.00 BACKHOE $68.00 $0.00 DOZER -05 $88.00 $90.00 DOZER -DS GPS $99.00 $0.00 ROLLER $82.00 $0.00 WATER TRUCK $88.00 $0.00 CAT 308 EXCAVATOR $74.00 $0.00 CUT-OFF SAW $15.00 $0.00 Compactor $15.00 $0.00 ,, • ? $0.00 $0.00 $0.00 $0.00 $0.00- $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 HRS. # TRUCKS PRICE 5 TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 WORK PERFORMED QTY PRICE E $0.00 $0.00 $0.00 $0.00 $0.00 Rou $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% $0.00 MINIMUM CHARGES MAYBE REWIRED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 White Construction Company, Inc. l � 1, Printed: - �'� L� . r 1,+ � 5 Title: Superintendent EFFECTIVE DATES: Straight Time LABOR RATE HRS Time +V2 RATE HRS TOTAL LABORER $58.00 zj $87.00 $0.00 PIPE LAYER $59.00 $88.50 $0.00 OPERATOR $74.00 $111.00 $0.00 DRIVER $60.00 $90.00 $0.00 FOREMAN $91.00 $136.50 $0.00 SUPT. $96.00 $144.00 1 $0.00 FOREMAN & SUPERINTENDENT RATES INCLUDE TRUCK/PHONE/MISC MATERIALS & SUPPLIES CITY. UNIT PRICE E TOTAL 6. -v $0.00 $0.00 $0.00 $0.00 $0.00- $0.00 $0.00 $0.00 TRUCKING CO. HRS. # TRUCKS PRICE 5 TOTAL $0.00 $0.00 $0.00 $0.00 MARKUP $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE E MARKUP T $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY, AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY EQUIPMENT REWIRING MOBILIZATION Rou ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% HOURS ABOVE B PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1.5 TIMES THE STANDARD RATE SUNDAYS ARE AT 'DOUBLE TlAE- MINIMUM CHARGES MAYBE REWIRED By: Printed: Title: Authorizing Parry TOTAL: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND SHALL BE CONSIDERED "EXTRA WORK' TO OUR CURRENT CONTRACT AND SHALL BE COMPENSATED BASED UPON THE QUANTITIES AND RATES ABOVE. e ff r - A 1 w tvs. rr n, ME 47. t ttV W4 . 1 jr i .a z (>• I _i k , 1" �.. •rtt,. f - 4 , i Y o - , _ 5 r may., s.�+.+.+�,iFiir: .....+... +.- ._., '.-..�.,,�-.. ...,. .. _._..«...:.e:w.. ._...-. �.i i_. ......,,. -... .. .-,- .. ,.,.... .... i.......,v,.. w..w.a ..ip .. ee....sygr,,.... .• .._ - r �ti G f FZ7WHIT'" I POWER RD onUl)IEA n��a%�. April 26, 2018 David Nfachala American Structarepoint Inc. Cell: (317) 281-9563 Email: dmachalaCstructurepoint.com Regarding: 10" EZ Valve Excavation (partial) Project No. 16 -ENG -108 Gentlemen: 3900 East White Avenue P.O. Box 249 Clinton, IN 47842 Tel (800) 355 9401 Fax (765) 832 2076 www.whitecojistruction.com We respectfully request a change order in the amount of $903.50 to hydrovac for the installation of the 10" EZ Valve requested on Project No. 16 -ENG -108. Please see the attached backup for your records. Please feel free to contact me with any questions or concerns. Marc Waltermann i White Construction, Inc. Project Manager Cell: 317-362-4217 marc.waltermann(a)whiteconstruction.com An Equal Opportunity Employer. P//7VMlTE TIME & MATERIAL WORK AGREEMENT ,I E,L, CUSTOMER: City of Carmel DESCRIPTION OF WORK PERFORMED: Hydro excavate for installation_ of EZ valve south end of project. shown on sheet SD 3.4 JOB #: 16022-110 EFFECTIVE DATES: EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT (OPERATOR NOT INCLUDED) TOTAL DESCRIPTION RATE I HR HR T TAL ) SKID STEER $60.00 $0.00 BACKHOE $68.00 $0.00 DOZER -D5 $88.00 $0.00 DOZER -D5 (GPS) $99.00 $0.00 ROLLER $82.00 $0.00 WATER TRUCK $88.00 $0.00 CAT 308 Excavator $74.00 $0.00 CUT-OFF SAW $15.00 $0.00 Compactor $15.00 $0.00 MARKUP(water material only) $12.00 $0.00 TOTAL Badger 2 1 $265.00 $0.00 $0.00 $0.00 $0.00 $0.00 MARKUP $79.50 $0.00 PRICE $ $0.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY, AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY EQUIPMENT REQUIRING MOBILIZATION $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% $0.00 HOURS ABOVE 8 PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1.5 TIMES THE STANDARD RATE. SUNDAYS ARE AT 'DOUBLE TIME' MINIMUM CHARGES MAYBE REQUIRED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 DATE: 4/21/18 Straight Tkne Time +112 LABOR RATE HRS RATE HRS TOTAL LABORER $58.00 $87.00 $0.00 PIPE LAYER $59.00 $88.50 $0.00 OPERATOR $74.00 $111.00 $0.00 DRIVER $60.00 $90.00 $0.00 FOREMAN 1 $91.00 1 2.0 1 $136.50 $182.00 SUPT. 1 $96.00 1 1 $144.00 $0.00 FOREMAN 8 SUPERINTENDENT RATES INCLUDE TRUCK/PHONE/MISC MATERIALS 81 SUPPLIES QTY. UNIT PRICES TOTAL Dump Fee 1 EA $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MARKUP(water material only) $12.00 TRUCKING CO. HRS. # TRUCKS PRICE f$ TOTAL Badger 2 1 $265.00 $530.00 $0.00 $0.00 $0.00 MARKUP $79.50 SUBCONTRACTORS WORK PERFORMED QTY PRICE $ MARKUP EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY, AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY EQUIPMENT REQUIRING MOBILIZATION ALL MATERIALS WILL BE BILLED AT COST PLUS 15% ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% HOURS ABOVE 8 PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1.5 TIMES THE STANDARD RATE. SUNDAYS ARE AT 'DOUBLE TIME' MINIMUM CHARGES MAYBE REQUIRED I u r n1_: iaU3.50 White Construction Company, Inc. Authorizing Party By: By: Printed: Printed: Title: Superintendent Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND SHALL BE CONSIDERED "EXTRA WORK" TO OUR CURRENT CONTRACT AND SHALL BE COMPENSATED BASED UPON THE QUANTITIES AND RATES ABOVE. k i t , v t t j , AL r t o 3 { t u a I s N. i • rr.Ir x i , 13 • t �-.y�} � ' j j �� i 1001 i t '.� � 3 '. � k: y , .. o .�. .► � ?�'�.te � I.,��! �.><. of .1 �� .. !-1 -:' "7, .,f 5� �•ii�_3 -"'j � ; r 1 + ' � -r r - - r ,+t.�.i.__....w.�i,.......�...�.�r,..:,.�i.,,.A..,_i...,i..,i,;.i.,�„r.. l.. i '_....:.'i.._.....,.;..,�y,....!.....M....,.:.i.,......,.....,M ITE TIME &MATERIAL WORK AGREEMENT y CUSTOM ER.° pt,, c Lt�'.r �GI N�� DATE. ZOO'd DESCRIPTION OF WORK PERFORMED: LC�_.� t%lJ� lL� a /G2i, kis f�1t21/IS_ JOB M f (OOZZ -//0 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT (OPERATOR NOT INCLUDED) Time +112 RATE HRS DESCRIPTION RATE / HR HR TOTAL ( ) SKID STEER LOADER $60.00 $000 BACKHOE $68.00 $0.00 DOZER -D5 $88.00 $000 DOZER -D5 (GPS) $99.00 $0.00 ROLLER $82.00 $0.00 WATER TRUCK $88.00 $0.00 CAT 308 EXCAVATOR $74.00 $0.00 CUT-OFF SAW $15.00 $0.00 Compactor $15.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 HRS. # TRUCKS PRICE ($) TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $000 $0.00 $0.00 $0.00 $0.00 WORK PERFORMED QTY PRICE $ $0 0C $0.00 $0.00 $0.00 $0.00 R - $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% $0.00 MINIMUM CHARGES MAYBE REQUIRED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 White Construction Company, Inc. By: 1 Printed: I : �14.J.✓ Title: Superintendent EFFECTIVE DATES: 4-- a /--- �a S Strai ht Time LABOR RATE HRS Time +112 RATE HRS TOTAL LABORER $58.00 $87.00 $0.00 PIPE LAYER $59.00 $88.50 $0.00 OPERATOR $74.00 $111.00 $0.00 DRIVER $60.00 $90.00 $0.00 FOREMAN $91.00 $136.50 $0.00 SUPT $96.00 $144.00 $0.00 FOREMAN & SUPERINTENDENT RATES INCLUDE TRUCK/PHONE/MISC MATERIALS & SUPPLIES QTY. UNIT PRICE ($) TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TRUCKING CO. HRS. # TRUCKS PRICE ($) TOTAL $0.00 $0.00 $0.00 $0.00 MARKUP $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE $ MARKUP $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY, AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY EQUIPMENT REQUIRING MOBILIZATION R - ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% HOURS ABOVE 8 PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1 5 TIMES THE STANDARD RATE. SUNDAYS ARE AT DOUBLE TIME" MINIMUM CHARGES MAYBE REQUIRED Authorizing Party Byl v -1L Printed: Title: /v - TOTAL: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND SHALL BE CONSIDERED "EXTRA WORK" TO OUR CURRENT CONTRACT AND SHALL BE COMPENSATED BASED UPON THE QUANTITIES AND RATES ABOVE. _ '}i t.\. 'G``l : .7.. i.{Y' n {,r . _. _' ... ;; ,-..... '+tt :}.•"� 1.-. r[ ,.t+�_. Lh � •E k' •_�,•sr :. r. .; .. >4 __1, :�; �.a: e{;i!• S..t. _ 1., .a `i h+ir�'V!i ei i.i"`. 0 fr - d11 i ileSt3w r rt ; Y i . t t a _t y i .... t i.' �,i r f � ir�\J i< `�� 0.F t_ } ^�i (. �-iL -L•-�t � { • e T Yr. .. .. :. ..f 1 , —. � .._. , - f rnR'M. nY._+•r. t ++,I•�r awe+ Jwr...� wF ....�.w....we1... - .., ......r .,. }...+..-. .. ' _ +.r - .� .r,.,.... . _,...w « ...... w.-+..M.--.._.r..n... _. � •+w:.�..._ n ..a a...,iii.�-,:. _J ...b..... .w..._ ,63: t` �_• ;S ._� .ad. '`� iti, - 7 4V,`. ��'1� yam} } }- 1.'1 Si,C 1..J \ ��T� J 1'%f ,., �'��v ` �r7' V'-1 .. • . 1 47 BADGER or,YL 11A--Ir1G Billed To: WHITE CONSTRUCTION, INC PO BOX 249 CLINTON IN 47842 TKT00771796 Badger Daylighting Corp 75 Remittance Drive Suite 3185 Chicago, Illinois, United States, 60675-3185 Ph: (877) 3BADGER Fax: (877) 741-3134 Email: AR Dept Job Number J00494969 Ticket Date: 04/21/2018 Paper Ticket #: Street Address Job Location 3rd and City Center Way Carmel, IN (Right next to PO: 16022-110 Company: Badger Daylighting Corp Select Truck Project Name/AFE: Job Name/#: 3rd and City Center Way Carmel, IN (Right next to Customer Rep: Terry West Area INDIANA CORP Customer Rep #: 917-373-2699 Industry Ticket Items Item Unit # / Personnel Quantity U of M Rate Amount HYDROVAC 1 MAN CREW - HOURLY - 02 1550, HYDROVAC 7.00 HR 265.00 1,855.00 OVERTIME RATE DISPOSITION AND WATER FILL -PER LOAD 1550, HYDROVAC 1.00 EA 100.00 100.00 TIME -01 -OPERATOR 1 -DAY SHIFT BARNETT, SAMUEL 0.00 HR 0.00 0.00 Subtotal 1,955.00 FUEL RECOVERY FEE % 1,955.00 PCNT 5.25% 102.64 Approved By: Work Order #1 160-22110 Total $2,057.64 Taxes included if applicable Spire Wireless Field Ticketing Visit us at www.spiradata.com Ver 2.0.5 Page 1 of 1 FZ7WHITE Io WARD an GJIEA cnm�pany April 13, 2018 David Machala American Structurepoint Inc. Cell: (317) 281-9563 Email: dmachalaCstructurepoint.com Regarding: Revised Granite Roll Curb Project No. 16 -ENG -108 Gentlemen: o k S8 - CZEV 1 sED Qot, Cu RS FOX Mzuct_ /& P 2otJ , G (ZAJ %-WE 3900 East White Avenue P.O. Box 249 Clinton, IN 47842 Tel (800) 365 9401 Fax (785) 832 2075 www.whiteconstruction.com We respectfully request the amount of $40.70 per lineal foot be added to contract item no. 1001. This brings the revised unit price for this item to $125.70/LFT and reflects the revisions to roll curb truck apron detail issued 3/23/2018 for Project No. 16 -ENG -108. This pricing is based on the granite supplier providing the holes for the stainless-steel dowels as shown. Original Unit Price $85.00 LFT Added Cost $40.70 LFT (see attached backup) Revised Unit Price $125.70 LFT Please see the attached backup for your records. Marc Waltermann White Construction, Inc. Project Manager Cell: 317-362-4217 marc.waltermann(owhiteconstruction.com An Equal Opportunity Employer. 2-zl LFT E � as •'10 f L_Fr CALUMET IF Date: April 9, 2018 CALUMET CIVIL CONTRACTORS, INC. Addressee: Marc Walterman PROPOSAL Attn: PROJECT: 16 -Eng -108 Roundabout improvements City Center Drive and 3rd Avenue LOCATION: City Center Drive and 3rd Avenue SW - Carmel, IN PLANS by: American Structurepoint, Inc. PLAN DATE: 3/23/18 We are pleased to submit this proposal for the above referenced project. The following scope of work is included: Code Dese Quan Units 1001 CONCRETE FOUNDATION FOR GRANITE ROLL CURB IN TRUCK APRON 1 100 FINISH CONCRETE AROUND BOLLARD - LABOR ONLY Total 227.000LFT 535.00 $7,945.00 40.000SYS 565.00 52,600.00 Project Specific Conditions: 1. All materials produced by an 1NDOT Certified Plant. 2. Sales Tax is not included on materials. 3. To provide a Performance, Payment or Maintenance bond, an additional cost would be required, with pricing available upon request. 4. Finish concrete around bollards is the labor for finishing the concrete around mechanical bollards in Third Ave SW only. Bollards to be installed by others concrete provided by others. This work is priced assuming work to be performed in conjunction with other concrete work on this project, an additional mobilization will be charged if phased differently. 5. Concrete foundation for granite curb priced for concrete work only. Furnish and placing of granite curb by others; including ad additional items necessary for placement of granite curb. This work is priced assuming work to be performed in conjunction with other concrete work in the roundabout, an additional mobilization will be charged if phased differently. 6. All items placed on stone or existing conditions prepared by others. 7. Traffic Control is not included. Flagging of our work only has been included. All traffic control devices and the placement of such devices shall be the responsibility of others. 4898 Fieldstone Drive - Whitestown, IN 46075 - Ph: 317-769-1900 - Fax. 317-769-7424 www.CalumetCivil.com -An Equal Opportunity Employer' (� Waltermann, Marc From: Joe Davee <jodavee@smockfansler.com> Sent: Tuesday, April 10, 2018 9:25 AM To: Waltermann, Marc Subject: RE: 16ENG-108 - Construction Change No. 1 Plans Marc, The pattern adjustment doesn't affect my price, but the added grout and pins is 2.00/LF additional for the granite installation. We will need to be sure Architectural pre -drills the pin holes in the granite as well. Thanks, Joe Davee VP, Project Manager Smock Fansler Corporation PH 317-248-8371 FX 317-244-4507 CELL 317-714-3223 www.smockfansler.com -----Original Message ----- From: Waltermann, Marc [mailto:Marc.Waltermann@whiteconstruction.com] Sent: Thursday, April 5, 2018 9:46 AM To: Joe Davee <jodavee@smockfansler.com> Cc: Lang, Bill <Bill.Lang@whiteconstruction.com> Subject: FW: 16ENG-108 - Construction Change No. 1 Plans Joe, Please take a look at the link below to plan revisions for 3rd Ave. Per our conversation, I will ask Calumet to look at the concrete that has been added under the granite roll curb. Please be sure to go through the items and let me know of any cost/scope changes you may have due to the revisions and I will submit it to the engineer. Thanks, Marc Waltermann White Construction, Inc. Project Manager Direct: 765-828-2590 Cell: 317-362-4217 marc.waltermann@whiteconstruction.com -----Original Message ----- From: Waltermann, Marc Sent: Monday, April 2, 2018 8:14 AM 1 V WHITE June 17, 2018 David Machala POWER FORWARD American Structurepoint Inc. Cell: (317) 281-9563 Email: dmachalaCstructurepoint.com Regarding: Relocate Fiber Optic Handhole Project No. 16 -ENG -108 Gentlemen: # O t 8 9 — P.E.Loc.A-rE- C/�RNIEL Co MM U N � �p-� orJ EiAa�D �o� 3900 East White Avenue P.O. Box 249 Clinton, IN 47842 Tel (800) 355 9401 Fax (785) 832 2075 www.whiteconstruction.com We respectfully request a change order in the amount of $1,265.00 to relocate the handhole in the middle of American Way South. The existing handhole was not traffic rated and needed to be relocated outside of the new pavement. Please see the attached backup for your records. Please feel free to contact me with any questions or concerns. Marc Waltermann //� White Construction, Inc. Project Manager Cell: 317-362-4217 marc.waltermannna.whiteconstruction.com LS ( � i 2( -S. 00 An Equal Opportunity Employer. MORPWYCONSMCTION JbbNama: 1"NG-108 Gy Csrrisr & 3rd Ava SW Labor t 7. HOLM Kom Epulp~l t ONAP o 20% t 11361 ON&P * 12% t Tow Labor t $6M Total Equ# wd t Ma(* M i 60.00 Subs t ONAP ®12% i 6.60 b% i TewMatsrlN t ".90 Tow Subs t GrmdTow 1,1 T1.M ®.. Labor t 719.7: Epulp~l t ONAP o 20% t 11361 ON&P * 12% t Tow Labor t $6M Total Equ# wd t Ma(* M i 60.00 Subs t ONAP ®12% i 6.60 b% i TewMatsrlN t ".90 Tow Subs t GrmdTow 1,1 T1.M IMNT PRICE N,1tN 661LE —4- 19/21 e F//WHITE POWER D June 17, 2018 David Machala Aniericn►t Structurepoint Inc. Cell: (317) 281-9563 Email: dmachala@.structurepoint.com Regarding: Install New 4x4x4 Handhole NW Corner Project No. 16 -ENG -108 Gentlemen: # o Va 0 — CARMEL pfp-pto 40%.E r 4FT X 4 PT. 3900 East White Avenue P.O. Box 249 Clinton, IN 47842 Tel (800) 355 9401 Fax (765) 832 2075 www.whiteconstruction.com We respectfully request a change order in the amount of $6,831.00 to install a new 4'x4'x4' handhole at the NW corner of City Center Drive and Yd Avenue. The existing handholes needed to be removed due to conflict with the new curb line. Please see the attached backup for your records. Please feel free to contact me with any questions or concerns. Marc Waltermann White Construction, Inc. Project Manager Cell: 317-362-4217 marc.waltermann a( whiteconstruction.com 1 LS @ An Equal Opportunity Employer. MORPHEY CONS TRUC77ON JobN&M. is -ENC -108 City Center b 3rd Ave SW r..r• e,.A„Au..tir. 4;m• Data: a9ORPHEY CONSTRUCTION Labor : 1,439.91 Equonmi 9 OH&P a 20% ; 297.0 7. Total Labor ; 1,M7.22 TotalEqu"Wt 5 Manrbd i 3,u2.00 Subs ; OH6P 12% ; 277.04 6% ; roW Maf9rIN ; 2,519.04 TOW Sub ; Gravid Total 9,229.37 Data: a9ORPHEY CONSTRUCTION Labor : 1,439.91 Equonmi 9 OH&P a 20% ; 297.0 ONSP a 12% ; Total Labor ; 1,M7.22 TotalEqu"Wt 5 Manrbd i 3,u2.00 Subs ; OH6P 12% ; 277.04 6% ; roW Maf9rIN ; 2,519.04 TOW Sub ; Gravid Total 9,229.37 UNIT PRICE $4,70kowEA 99299 11a.ao 1,97e.o9 2k'ZI •tet. _ :. � r��:.' wr' •4bWIN41 , 7 i ( r 227 x ;: _„�, ., � �.,. _ :` .,.. ' L a-n:, « ir'y; i is+•="aS u��` i n a-� '= t�lt•an �tfiY" M�14.-� ... .- .-. •�e ! a {{ t i VS* . i Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 0725/18 Re: C.O. #13 rd Ave SW and City Center RAB Project #16 -ENG -108 Doug, please find attached 1 original of same change order for project #16 -ENG -108 3`d Ave SW and City Center RAB project. Please review & initial for the next BPW Meeting. Change Order #1- Original Contract Amount: $3,288,270.00 Increase: $27,431.20 New Contract Amount: $3,315,701.20 Thank you, Lisa Scott 0 Page 1