HomeMy WebLinkAbout0FIRE PROTECTION GENERAL NOTES:
1. THE EXISTING BUILDING HAS A SPRINKLER SYSTEM INSTALLED IN ALL AREAS.
MODIFY EXISTING SPRINKLER HEADS, BRANCH MAINS & FEED MAIN PIPING AS
REQUIRED TO ACCOMMODATE THE NEW FLOOR PLAN LAYOUT, REFLECTED CEILING
LAYOUT, CEILING ELEVATION CHANGES, HVAC EQUIPMENT & DUCTWORK, ALL PIPING,
AND ALL ELECTRICAL CONDUIT.
2. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING LAYOUT &
ELEVATIONS.
3. SPRINKLER CONTRACTOR SHALL SCHEDULE SPRINKLER SHUTDOWN WITH OWNER
IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATIONS & NOTIFY LOCAL FIRE
DEPARTMENT OF SYSTEM & AREAS OUT OF SERVICE.
}
# :....... .. ..... ........
...... ....
FIRE PROTECTION GENERAL NOTES:
1. THE EXISTING BUILDING HAS A SPRINKLER SYSTEM INSTALLED IN ALL AREAS.
MODIFY EXISTING SPRINKLER HEADS, BRANCH MAINS & FEED MAIN PIPING AS
REQUIRED TO ACCOMMODATE THE NEW FLOOR PLAN LAYOUT, REFLECTED CEILING
LAYOUT, CEILING ELEVATION CHANGES, HVAC EQUIPMENT & DUCTWORK, ALL PIPING,
AND ALL ELECTRICAL CONDUIT.
2. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING LAYOUT &
ELEVATIONS.
3. SPRINKLER CONTRACTOR SHALL SCHEDULE SPRINKLER SHUTDOWN WITH OWNER
IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATIONS & NOTIFY LOCAL FIRE
DEPARTMENT OF SYSTEM & AREAS OUT OF SERVICE.
GENERAL NOTES:
1. NOT ALL PLAN NOTES MAY BE USED ON SHEET.
2. NO PIPING SHALL PASS THROUGH ELECTRICAL ROOMS, ELEVATOR EQUIPMENT
ROOMS, STAIR SHAFTS, ELEVATOR SHAFTS OR SIMILAR SPACES UNLESS SYSTEM
SERVES SPACE.
3. THE CONTRACTOR SHALL PIPE, COMPLETE AND MAKE OPERATIONAL EACH
PLUMBING FIXTURE WITH WATER, WASTE AND VENT PIPES ACCORDING TO THE
PLUMBING FIXTURE SCHEDULE.
4. IF A FIXTURE IS NOT INDICATED TO HAVE H&CW PIPE, W & V PIPE CONNECTED TO IT,
IT SHALL BE PROVIDED AND INSTALLED. THE CONTRACTOR SHALL PROVIDE THE
COST OF MATERIAL AND INSTALLATION OF THE PIPING WITHIN THEIR SCOPE OF THIS
PROJECT.
5. VALVE TAGS WILL BE PLACED ON GRID FOR LOCATION OF VALVES.
6. PROVIDE THERMOSTATIC MIXING VALVE TO SERVE ANY EMERGENCY EYE WASH,
EMERGENCY SHOWER REQUIRED.
PUSH BUl
# PLAN NOTES
1 CONNECT 2" DCW, 1" DHW, 1/2" DHWR TO EXISTING DCW, DHW, DHWR.
2 CONNECT 2" DCW, 1" DHW, 3/4" DHWR TO EXISTING DCW, DHW, DHWR.
3 CONNECT 2" V TO EXISTING V.
4 MODIFY EXISTING FP SYSTEM TO ACCOMMODATE THE NEW
ARCHITECTURAL REFLECTED CEILING PLAN.
5 1/2" DHW & DCW DROP_
6 1/2" DCW, DWH DN. PROVIDE POINT OF USE GREASE INTERCEPTOR SIMILAR
TO JAY R SMITH MODEL 8007. PLACE UNIT UNDER COUNTER AND CONNECT
COMPLETE.
7 1/2" DCW, DHW UP TO ISLAND SINK.
8 PROVIDE SINK TOP SWITCH FOR ISLAND SINK. REFER TO DETAIL "A
9 2" V DN.
10 2" DCW CAPPED FOR FUTURE CONNECTION.
n PUSH BUTTON GARBAGE DISPOSAL DETAIL
NO SCALE
LOOP VENT ABOVE FLOOD RIM
OF FIXTURE(6" MIN)
P -TRAP
PIPE SLEEVE; REFER TO PIPE PENETRATION
DETAIL FOR SEALING REQUIREMENTS
(DETAIL "E" ON SHEET P800.3) I
WASTE LINE
i
FLOOR
i
ROUTE VENT TO
LOCATION SHOWN ON PLAN
n ISLAND VENT PIPING DETAIL
NO SCALE
�2 V
V
n Sanitary Riser Diagram BP5 (Community Room)
U
WASTE LINE
-4" S
�-4„ S
WALL OUTLET
9365 Counselors Row
Indianapolis, IN 46240-1478
ph 317.819.7878 fx 317.819.7288
www.bsalifestructures.com
WOMEN'S CENTER
CARMEL, IN
BP #5 DESIGN
DOCUMENTS
WOMEN'S
POB1��CENTER
r CONNECTOR
N KEYPLAN
MARK I DATE I DESCRIPTION
01111 uu/11,0,
r, \ S TF,Q�
• PE10708231 s • s
-o STATE OF
AL
FIRST FLOOR
PLUMBING PLAN -
BP5
CLIENT NO.: 0461
PROJECT NO. 04610082
SCALE As indicated
DATE SEPTEMBER 12.2n1A
y
{
.r
GENERAL NOTES:
1. NOT ALL PLAN NOTES MAY BE USED ON SHEET.
2. NO PIPING SHALL PASS THROUGH ELECTRICAL ROOMS, ELEVATOR EQUIPMENT
ROOMS, STAIR SHAFTS, ELEVATOR SHAFTS OR SIMILAR SPACES UNLESS SYSTEM
SERVES SPACE.
3. THE CONTRACTOR SHALL PIPE, COMPLETE AND MAKE OPERATIONAL EACH
PLUMBING FIXTURE WITH WATER, WASTE AND VENT PIPES ACCORDING TO THE
PLUMBING FIXTURE SCHEDULE.
4. IF A FIXTURE IS NOT INDICATED TO HAVE H&CW PIPE, W & V PIPE CONNECTED TO IT,
IT SHALL BE PROVIDED AND INSTALLED. THE CONTRACTOR SHALL PROVIDE THE
COST OF MATERIAL AND INSTALLATION OF THE PIPING WITHIN THEIR SCOPE OF THIS
PROJECT.
5. VALVE TAGS WILL BE PLACED ON GRID FOR LOCATION OF VALVES.
6. PROVIDE THERMOSTATIC MIXING VALVE TO SERVE ANY EMERGENCY EYE WASH,
EMERGENCY SHOWER REQUIRED.
PUSH BUl
# PLAN NOTES
1 CONNECT 2" DCW, 1" DHW, 1/2" DHWR TO EXISTING DCW, DHW, DHWR.
2 CONNECT 2" DCW, 1" DHW, 3/4" DHWR TO EXISTING DCW, DHW, DHWR.
3 CONNECT 2" V TO EXISTING V.
4 MODIFY EXISTING FP SYSTEM TO ACCOMMODATE THE NEW
ARCHITECTURAL REFLECTED CEILING PLAN.
5 1/2" DHW & DCW DROP_
6 1/2" DCW, DWH DN. PROVIDE POINT OF USE GREASE INTERCEPTOR SIMILAR
TO JAY R SMITH MODEL 8007. PLACE UNIT UNDER COUNTER AND CONNECT
COMPLETE.
7 1/2" DCW, DHW UP TO ISLAND SINK.
8 PROVIDE SINK TOP SWITCH FOR ISLAND SINK. REFER TO DETAIL "A
9 2" V DN.
10 2" DCW CAPPED FOR FUTURE CONNECTION.
n PUSH BUTTON GARBAGE DISPOSAL DETAIL
NO SCALE
LOOP VENT ABOVE FLOOD RIM
OF FIXTURE(6" MIN)
P -TRAP
PIPE SLEEVE; REFER TO PIPE PENETRATION
DETAIL FOR SEALING REQUIREMENTS
(DETAIL "E" ON SHEET P800.3) I
WASTE LINE
i
FLOOR
i
ROUTE VENT TO
LOCATION SHOWN ON PLAN
n ISLAND VENT PIPING DETAIL
NO SCALE
�2 V
V
n Sanitary Riser Diagram BP5 (Community Room)
U
WASTE LINE
-4" S
�-4„ S
WALL OUTLET
9365 Counselors Row
Indianapolis, IN 46240-1478
ph 317.819.7878 fx 317.819.7288
www.bsalifestructures.com
WOMEN'S CENTER
CARMEL, IN
BP #5 DESIGN
DOCUMENTS
WOMEN'S
POB1��CENTER
r CONNECTOR
N KEYPLAN
MARK I DATE I DESCRIPTION
01111 uu/11,0,
r, \ S TF,Q�
• PE10708231 s • s
-o STATE OF
AL
FIRST FLOOR
PLUMBING PLAN -
BP5
CLIENT NO.: 0461
PROJECT NO. 04610082
SCALE As indicated
DATE SEPTEMBER 12.2n1A