HomeMy WebLinkAbout24C
NOTES- REFLECTED CEILING PLAN
- BP5
' NOT ALL NOTES APPEAR ON EACH SHEET.
" REFER TO A010.5 FOR GENERAL NOTES, WALL TYPES, EQUIPMENT SCHEDULE,
TOILET ACCESSORY SCHEDULE, AND TYPICAL DETAILS.
1 EXISTING CEILING TO REMAIN.
2 BID PACKAGE 3 TO EXTEND EXISTING CEILING INTO NEW DOOR ALCOVE.
COORDINATE SIZE AND LOCATIONS WITH BID PACKAGE 3 CONTRACTOR.
3 CAN LIGHTS WITHIN GYPSUM DRYWALL BULKHEADS SHALL BE INSTALLED AT
CENTERLINE OF BULKHEAD WIDTH.
9365 Counselors Row
Indianapolis, IN 46240-1478
ph 317.819.7878 fx 317.819.7288
www.bsalifestructures.com
WOMEN'S CENTER
CARMEL, IN
BP #5 CONSTRUCTION
DOCUMENTS
u►nR Ar -.Ile%
N
KEYPLAN
MARK DATE DESCRIPTION
109-29-2014 BP5 ASI 42
--iO4-6
FIRST FLOOR
REFLECTED
CEILING PLAN
CLIENT N0.: 0461
PROJECT NO. 04610082
SCALE 1/8" =1'-0"
DATE SEPT. 12, 2014
COORD
MAIAM Al 11 9
IM