Loading...
HomeMy WebLinkAbout24C NOTES- REFLECTED CEILING PLAN - BP5 ' NOT ALL NOTES APPEAR ON EACH SHEET. " REFER TO A010.5 FOR GENERAL NOTES, WALL TYPES, EQUIPMENT SCHEDULE, TOILET ACCESSORY SCHEDULE, AND TYPICAL DETAILS. 1 EXISTING CEILING TO REMAIN. 2 BID PACKAGE 3 TO EXTEND EXISTING CEILING INTO NEW DOOR ALCOVE. COORDINATE SIZE AND LOCATIONS WITH BID PACKAGE 3 CONTRACTOR. 3 CAN LIGHTS WITHIN GYPSUM DRYWALL BULKHEADS SHALL BE INSTALLED AT CENTERLINE OF BULKHEAD WIDTH. 9365 Counselors Row Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com WOMEN'S CENTER CARMEL, IN BP #5 CONSTRUCTION DOCUMENTS u►nR Ar -.Ile% N KEYPLAN MARK DATE DESCRIPTION 109-29-2014 BP5 ASI 42 --iO4-6 FIRST FLOOR REFLECTED CEILING PLAN CLIENT N0.: 0461 PROJECT NO. 04610082 SCALE 1/8" =1'-0" DATE SEPT. 12, 2014 COORD MAIAM Al 11 9 IM