HomeMy WebLinkAbout8�H/\! H.S)
IK.51 I L IVB L5/ L.9 I M I
W�
-- QIW
I I I I r!
i I I i I I I I
AA306 4
- - - IMITS DIAS€ Pa - -- 3 I - - - 3---(28.)2
ql
I
A�F
FireProtection i�E.F.iAc1 IPAoz_MeI I i —� 1 Ac. 27 n l I �� —I— — — — — — — — — — _.. —_ - _ - — — -— .— __18 L
_ ---—-—-—— J—zl
- - - - 4 - 1-� -� - — -1�� 51
-�
3
3
I � � IIS I II f I AA304
l I
I
31z
j
I I
I
I i
I it
'I I
I
i
I I I
' I
---�— 2
N
i
I I
I �
I I I
I
- 18 -- � I I
I I
I I
I I
I
1
- I '
27
I I I j
��26.5
m I
6501 -313
15'-37/8" - — 14'-51/' \26.4
� - r 6E 12" 3 \
1a/t6 5 2 la 1 1 tt 5l' I 0' /24 0 a
I
26�
I I I
Me
I
I I
M r�
m
�`3 I jII
I
111...
3 � �
H bower d Dist. Rm ' m
PA94 �a1z L s ^! W m y
RTIFP y.m
eP - -Elev
Y _ it q, Ele¢ Lb Ma e.41z
-17See 25 rTA1
n
0
d
1
I
0
PA1
1
I
I
/2 i'r - .4CUVER-
r
J -11 1 8ABOVE
I
1 Q m atz Elev. Lby - 1 i ME a stz To i12. j DOOR
AA303 - "1 P 3 : EI@V 26 _- Q'
m
EA1 _ 11 L-. _ EIBV-51/4 3� 1 1'-3
s� a iMl 1
I 8'
m., F -A
Al. DOOR __ -
I . j ,\I .4
— — N _
E 24
yev s La 11 .3z° Pgos t -- i TA
�1 Y�ech Fab RoorrJi.- J g. - 5
°IH PMI, �I ;31 I. Elev Ma fi X11
`r 26 EA2 4
s I
m s
2
Al-
�/ I _
_ �.31
8'-8" -8 1 a. z e. -j' ' 1 - ��' __ - - I Ve" �' s•.z 11 p, I� 5 32 5
2
1 Ij 3 , ; 2a 1z o' (LOUVER 2a — 8-F'��, SIM
�' + CURB EDGE
Meter Rm fIl%\ /
PPs Plz 1I �J� URB EDGE
✓✓✓✓1111 TUNNEL BELOW OI
I I I I I—r
I I f I i I I I I r
I I
AP 3'11? -
��/ - - - - _I LJ
- - -- -- - - �1-- -- I --- -- -�-
N - - _
I I
I
I
- II _ \/
2
i I
I
A4306 � � M308 � I 3 I 3
tw3o7 AAao6
I I I I
I
I{�--I� 23.1
W �... _ _
- _
I
J.4K
- J 5 K.5' L�L.9 j�M�
\,l���_�
/,'�i Parking Level Unit Plan
100 SCALE. 1/8 - 1 -0 o 4' e' 16'
PARKING LEVEL PLAN NOTES
OAlign face of CMU wall with face of C.LP wall.
OAlign face of CMU wall to face of C.LP column.
0 Align face of CMU wall to face of CMU wall.
OAlign center of CMU wail to column centerine
OInterior finishes in elevator lobbies are m not in this contract Coordinate MEP
and technology shown in Bid Sets 1102, P103 and P104 with wall and door
construction.
OBack fill only these areas. Reference structural drawings for compaction
type
07 Exterior storefront, veneer, insulation and other finish Gadding IS not in this
contract (N.I C.).
OStair limestone cladding, railings, treads, risers are not in this contract
(N.I.C.). All structural substrate is in this contract. See architectural sections
in these drawings for clarification.
OEntry foyer hyade, veneer, insulation, curtain wall, canopy, other cladding,
stair and interior finishes are not in this contract (N.I.C.).
10 Wall veneer on this wait is not in this contract (N.I.C.).
11 Dimension is to inside face of shaft.
12 Parking lot striping.
73 Floor opening for future exhaust grill.
14 Race. in C.I.P. wall for fireplace. See structural drawings for wall cross
section. Architectural elevation of recess is shown in detail 4/AA302.
15 Edge of concrete slab. Ref. structural DWG's.
16 Provide perimeter insulation along foundation wall. See AA300 series
drawings for configuration.
17 Expansion joint in slab above
18 Storm pipe penetration in CAR wall. See detail WAA502Coordinate with
civil and plumbing drawings for vertical location (invert) through wall. Pipe
penetrations in interior wales wilt require additional coordination, See
elevation sheets for approximate sleeve Iocalions in exterior CIP walls. Final
lateral location of pipe to be coordinated in field meeting.
19 Cold formed steel wall at Fan Room (and adjacent spaces as sllowrl on the
floor plan, N. C)
20 Storm pipe penetration in CMU all. If wall Is fire rated use rated pipe
penetration assembly for pipe material and rating Refer to structural
drawings for opening requirements Coordinate with civil and plumbing
drawirgs for vertical location (invert) through wall, Feral lateral location of
pipe to be coordinated infield meeting.
21 Storm pipe penetration in foundation wall. See Civil for location of pipes for
coordination, refer to Structural for penetration requirements. Contractor is
responsible for ascertaining quantity of penetrations.
22 Envac disposal door
23 Envac waste removal chole
24 Envac air valve equipment
25 Envac inspection point
26 Reference Bid Set A.200, sheet series AA400 for location of elevator door
openings.
27 Control joint above donor head. See interior elevations from Sheet AA312 to
AA315
28 Align control joint w/ centerline of column or closest vertical bond joint
Proximity of column centerline.
29 Center control joint to closest vertical head between ends of wall.
30 Align control joint to step in concrete III
31 Storefront systems at elevator lobbies supported on 4 courses of 8' CMU
with metal stud construction above all glazing. Coordinate any required
electrical infrastructure in wall.
32 Steel pipe bollard. Where concrete is already placed core drill and set bollard
per details. See 61AA501. Coordinate with undemleb work. Locate these
bollards on jamb centerline.
ODock bumpers. See specifications,
34 Gypsum board and metal Stud bulkhead around ENVAC pipe. Use SYSTEM
H in the ICC LEGACY REPORT NER-258, REV JULY 1, 2008.
WALL TYPES -FIRE RATINGS
1 HOUR RATED
2 HOUR RATED
3 HOUR RATED
PEDCOR DESIGN GROUP LLC
Architecture / Project Management:
355 City Center Drive
Carmel, Indiana 46032
317.705 7979 (phone)
317.705.7980 (fax)
Architect:
ax°Sp
ST
Uj""w
2"
���� �tSTeRF X92
00033126
STATE OF _
�2 IANP
KEYPLAN
BLDGA04_
sc4r.E:.rrs
eL L"Nom
Developer:
P E D C O R
ji a
DEVELOPMENT CO.
'^r' Project:
Of
f
W
Z
W
UQcc
U
C
U. �E
L
J � C13
W m
U
—RIGH .—ER5HP0 DOCUI4ENrs
Bid Sets; All 00, A.400
Set Issue Date Sheet Issue Date
W.21.@6 6".21,06
Drawn By Checked By
rile, ,jP 1' Iso
La. f 7,s,.—.E10 091908
/�E—UCTIONSEA WA.200 06.1
• ABIDSETA400ISSUE, oall—
/�A.t00.A51.012, A300 A51.001, 09I13q)
O Z%1 At00AS1013, 1.14.1
• 14� Imsel A. 400 REJSSUE 041 I..
O L'y, BID SET X210 ISSUE, OS101loe
O BID BET A 410ISSUE. %WiW08
CBID SET A 300 G 11SSUE. 06/2710a
Project Number:
0502.00
Sheet Title:
Parking Level -
Area A
Sheet Number:
AA 100A