Loading...
HomeMy WebLinkAbout9Elev EA12 6'<• . C Q IL9 9l M�� `(vt 9 �% N p p J I P15 wlW QI�II j I I I I —P P 11 If �Q ' I Q.2 ) 1Q •. R.1 2 R �� I R.R.6 ; 5 �� li I I I I I I- 3 — f � _--(28.2 301 � I I I I I I I n I i ( i j I I i I I I I + 2 7Am, 4"�" ,10• i v P 3 AA304 I � -\27 > - ' I I 10'U_24• 114' — _ — — — — — — 'c 4 - I I I i_.—.—.—.— — I I I ❑ I t QImo I I I I I I 1 ala 2 I LU ( 25.3 ala L ,9 AREA B - --- �]------------------ j ) AREAS j 1 ji - --- ' -I-- - --- -- - -- ---I -- - -- I 1 I I 6 I —P P 11 If �Q ' I Q.2 ) 1Q •. R.1 2 R �� I R.R.6 ; 5 �� li I I I I I I- 3 — f � _--(28.2 301 � I I I I I I I I i I I I 27 , P 3 AA304 I � -\27 \26.% — _ — — — — — — --- -26 5 I I I t T I I I I I I I I 1 2 25.4 -, 21 I II I ( 25.3 205 16 — j ) j 1 ji _71111 - r R "R.1) RL2 VR.3 _1 J KJ PARKING LEVEL PLAN NOTES O1 Align face of CMU wall with face of C.I.P wall. OAlign face of CMU wall to face of C.I.P. column. OAlign face of CMU wall to face of CMU wall. OAlign center of CMU wall to column centedine. OInterior finishes in elevator lobbies are in not in this contract. Coordinate MEP and technology shown in Bid Sets P102, P.103 and P.104 with well and door construct . OBack fill only these areas. Reference structural drawings for compaction type. 07 Exterior storefront, veneer, insulation and other finish cladding is not in this =tract(N.I.C.), OStair limestone cladding, railings, treads, risers are not in this contract (N.LC J. All structural substrate is in this contract. See architectural sections in these drawings for danfication. OEntry foyer fagade, veneer, insulation, curtain wall, canopy, other cladding, stair and interim finishes are not in this contract (N.I.C.). 10 Wall veneer on this wall is not in this contract (N.LC). 11 Dimension is to inside face of shaft. 72 Parking lot striping. 13 Floor opening for future exhaust grill. 14 Recess in C.I.P wall for fireplace. See structural drawings for wall cross section. Architectural elevation of recess is shown in detail 4/AA302. 15 Edge of concrete slab. Ref. structural DWG's. i6 Provide perimeter insulation along foundation wall. See AA300 series drawings for configuration. 17 Expansion joint in slab above. 18 Stan pipe penetration in C.I.P wall. See detail NAA502. Coordinate with civil and plumbing drawings for vertical location (invert) through wall. Pipe penetrations in interior walls will require additional coordination. See elevation sheets for approximate sleeve locations in exterior CIP walls. Final lateral location of pipe to be coordinated In field meeting. 19 Cold formed steel wall at Fan Room (and adjacent spaces as shown on the floor plan, N.I.C.) 20 Storm pipe penetration in CMU wag. If wall is fire rated, use rated pipe penetration assembly for pipe material and rating. Refer to structural drawings for opening requirements. Coordinate with civil and plumbing drawings for vertical location (invert) through wall. Final lateral location of pipe to be coordinated in field meeting. 21 Storm pipe penetration in foundation wall. See Civil for location of pipes for coordination, refer to Structural for penetration requirements. Contractor is responsible for ascertaining quantity of penetrations. 22 Envac disposal door 23 Envac waste removal chute 24 Envac air valve equipment 25 Envac inspection point 26 Reference Bid Set A.200, Sheet senesAA400 for location of elevator door Openings. 27 Control joint above donor head. See interior elevations from SheetAA312 to AA315 28 Align control joint wl centedine of column or closest vertical bond joint proximity of column centerline. 29 Center control pint to closest vertical head between ends of wall. 30 Align control joint to step in concrete floor. 31 Storefront systems at elevator lobbies supported on 4 courses of 8' CMU with metal stud construction above all glazing. Coordinate any required electrical Infrastructure in wall. 32 Steri pipe bollard. Where concrete is already placed core drill and set bollard per details. See 61AA501. Coordinate with underslab work. Locate these bollards on jamb cemerime. 33 Dock bumpers. See specifications. 34 Gypsum board and metal stud bulkhead around ENVAC pipe. Use SYSTEM H in the ICC LEGACY REPORT NER-258, REV JULY 1, 2008. WALL TYPES -FIRE RATINGS 1 HOUR RATED _AREA B 22 AREA C Level Unit Plan 0" 0 4 8 2 HOUR RATED 3 HOUR RATED _ CIA 1r NI F 1_. r11' (,1't 1 1<_ PEDCOR DESIGN GROUP LLC Architecture f Project Management: 355 City Center Drive Carmel, Indiana 46032 317.705 7979 (phone) 317.705.7980 (fax) Architect: y5P ISTUImr2`z,Gy GVSTEEz R�. 00033126 STATE OF IMA By 4— MMiln. j KEYPLAN BLDGA SCAt&NIS PLINNORTH Developer: P E D C O R Vp amkw DEVELOPMENT CO. Project: 0B W F_ Z W UQ ICU .C: CID UaE 0 W m ry U COPYRIGHTS rRSHIP0Fo0CU NTS Bid Sets: A.100, A,400 Set Issue Date Sheet Issue Date 6431.06 00.21.06 Drawn By Checked By djs, rip, jdn jpm, Is jaw as Revision a e: 6919 n6 _7RUCTIONSETA.10RA2Un ON29roT ABIDSET A4m ISSUE. ols-7 &00.AE1.012,A.P00.ASI001,0911sv7 0 11A.100.ASI.013,12/14N7 0 AL BID SET A4m REISSUE, 09119168 L11L BID SET A210 iESUE, rWI/Ev BID SET A410I—E, xX7xXl0e U BID SET A 3011 C.1 ISSUE, ca— Project Number: 0502.00 Sheet Title: Parking Level - Area B Sheet Number: AAl QOB