Loading...
HomeMy WebLinkAbout16ESI STRUCTURAL INTERMEDIATE CL BEAM EOS LANDING (NC) ) SEE PLAN Me V 2-12 -----CL BEAM jM3 x S-0. 0 V-0° OC ` w/180' STD HOOK T LANDING COMPOSITE SLAB, T/P CFS e`er 1p�B1°�""'�"'_T_ +(SEE ARCH) SUPPORT OF LANDING PL)§" z CONT 4`16 2-12 w/14'x8' HEADED STUDS FROM ABOVE - BY STAIR SUPPLIER 1'-4° I I i3 x 3'-0. 0 P-0" OC w/180' STD HOOK VERT DEFLECTION PL )§°x W x CONT w/ 14'x8' HEADED STUDS 0 7-0' OC 0 COMPOSITE SLAB / (Wf TOTAL) T SLAB __ =2 +(SEE PLAN) T STEEL I +(SEE PLAN) �> I i� Ali f,,R BEAM �y CAI�MLL CITY CENTER PEDCOR DESIGN GROUP 4rchitecture I Project Managment: 335 Ridgge int Drive Cannel, In iana 48032 317.705.7979(phone) 317.705.7980 (fax) No. 860325 STATE OF STAIR SYSTEM (NIC) �� CL BEAM EOS L3x3.4 0 2'-0° OC - J/ - SEE PLAN Me V 2-12 CFS w/(2) jM3 x S-0. 0 V-0° OC ` w/180' STD HOOK LAYERS GYP EA FACE COMPOSITE SLAB, T/P (2) MINIMUM PER OPENING e`er 1p�B1°�""'�"'_T_ 511"L—x T SLAB PL)§" z CONT +(SEE PLAN) w/14'x8' HEADED STUDS T STEEL 0 3'-0" OC B 11,. +(SEE PLAN) VERT DEFLECTION CUP BEAM CAI�MLL CITY CENTER PEDCOR DESIGN GROUP 4rchitecture I Project Managment: 335 Ridgge int Drive Cannel, In iana 48032 317.705.7979(phone) 317.705.7980 (fax) No. 860325 STATE OF STAIR SYSTEM (NIC) �� L3x3.4 0 2'-0° OC - J/ - 4V�J�Rl37 CFS w/(2) LAYERS STAIR SUPPORT - (2) MINIMUM PER OPENING e`er 1p�B1°�""'�"'_T_ GYP EA FACE BY STAIR SUPPLIER (CLEAR THE SLAB) SECTION @ STAIR SHAFT OS CFS SHAFT WALL @ BEAM o, TR g141�H° SCALE: Yi' = 1'-0" DETg256_25051 841 SCALE: W = 1'-0" DETg252_25051 841 f,,R �y EE PLA SEE —yN CFS (BEYOND) �-CL BEAM--Z� - 0 EW 180' CFS EOS 0 DOOR Me 2-12 - — - #3 12" HOOK 0 SLAB EDGE {he 2-12 g3 x 3' -0" 0 1'-0" OC w/180 SID HOOK • PL ir:" z 'v �"x CONT � i PL ilv�S x CONT �• x 1S"0x8" HEADED T COMPOSITE SLAB, TYP L � � w/ �§"0 THRU-BOLT. COUNTER SUNK, TACK w w/ STUDS 0 3'-0° OC PLV x 5Ye"� z CONT+ T SLAB WELDED TO PLATE HOLD BACK 1° - TSR +(SEE PLAN)` w/1 *_1D HEADED STUDS - (SEE PLAN) T STEEL - KEY PLAN FROM EOS 0 3'-0" OC B1{ +(SEE PLAN) C8%11.5 ell BEAM VERTU DEFLECTION ,o o scxe: NIS PUN NoaTH ELEVATOR STAIR CLIP ° Developer CFS w/(2) LAYERS — VERT DEFLECTION CLIP B 9 1 VERT DEFLECTION CUP GYP EA FACE (CLEAR THE SLAB) BEAM PE D C O R ??MAWGYP CF1w/(2) LAYERS - EA FACE L3x3xY 0 2'-0" OC - /,ef.�6 _per (CLEAR THE SLAB)LIA CFS (2) MINIMUM PER OPENING DEVELOPMENT CO. B EADER (SEE ARCH) Project: SECTIONos ELEVATOR SHAFT @ THRESHOLD SCALE: 4'+" = 1'-0" DET#257_25050 B41 SCALE: W = 1'-0" DETg253_25051 641 I LU M.9 VENEER ARCH -SEE � SHEATHING GFS /3 0 12" EW 180'-- a 1 HOOK 0 SLAB EDGE W PL 36 x',z^tL_Jg x CONT Me 2-12 V w! )¢"0x8' HEADED STUDS 0 -- w 3-0° OC I {he 2-12 { f' L6x4x% (LLH) CONT w/ 114" VERT SLOT - TACK WELD NUT AFTER ADJUSTMENT - CU `�/ 1_304 KICKER 0 3'-0" OC SEE ARCH FOR UMITS OF BRICK U) STAIR BEAMCo LEDGE �1rfRTICAL DEFLECTION CLIP w - SHEATHING E { VERT DEFLECTION CIDP -- i { CFS STUDS GENERAL SCREW 11401L w L ICU CFS LAYERS SHEATHING SCREWS TO BE 1" TO 1Ya° SEF TAPPING rTOP PLATE OR BLOCKING U w/(2) GYP EA FACE7I i`j� LONG /10 TYPE S-12 BUGLE HEAD SCREWS I 0 PANEL EDGE ) TYPICAL 0 ALL PANEL EDGES M W (CLEAR THE SLAB) UJ ' SECTION 0% CREWS OB•OCLD Ya" = 1'-0" DEry2sa25os1 8411'-4SHEATHING OF PANELSCALE: mii INFILL w/ CFS STUDSSTUBCOLUMNBEYOND - SEE TYPICAL STUB COLUMN° TPL Y z2 %CON � � DETAIL ON SHEET SB410)-1 1'-0" MAX DECK L -i,i AB SPACING FROM END _ _ - i.l OF SHEAR B 91 WALL Fy She 2-12 BEAM e DEFLECTION CLIP li i FOUNDATION 1100 4° AROUND PERIMETER HOLD _ SE PLAN IF REWIRED OF PANEL BID SET B.200 \ CFSALL SHEATHING SHALL BE i4" STRUCTURAL SHEATHING TO MEET ASTM C79 lIpsue Date Drawn By Checked By SECTIONOS 12,04106 LKM JAI SCALE: N" = l'-0" DETp259_25051 B41 Revisions: TYPICAL SHEATHING ATTACHMENT 5 EL BID 5ET 8.200 05123/08 o3 SEE LAN ---- EOD -SEE PLAN 9 _ SCALE: 3'a " = l'-0" WD -016 (SHEATHING/METAL STUD WAIL) B41 ADDENDUM 0001 06120/08 DECK SEE 07/SA410 FOR PERIMETER ANGLE STRUCTURAL INTERMEDIATE f5I 8003 07/17/08 LANDING (NIC) E51 #005 MI1M T LANDING CL BEAM YIe 2-12 +(SEE ARCH) 41, SHEATHING SUPPORT OF LANDING 1'-4' Me 2-12 \STUB INFILL w CFS STUDS / / COLUMN BEYOND - FROM ABOVE - BY STAIR SUPPLIER /3 x 3'-0" 0 1'-0' OC w/180' STD HOOK Project Number: `-BEAM SEE TYPICAL STUB COLUMN DETAIL ON SHEET SB410) PL )§"x 5Ve" L_ x CONT COMPOSITE SLAB 25051 1'-4° 1 3° Me 2-12 w/ 14"x8' HEADED STUDS 0 S-0. OC _} r SLAB T",- +(SEE PLAN) PL Y;xl'-7"xCONT w T S1EEL Sheet Title: 0 AAC ` i t p +(SEE PLAN) Me 2-,2 ' T STL VERT DEFLECTION CUP 7• o o SECTIONS AND {" + SEE PLAN DECK +( SEE DETAILS Sheet Number. DEFLECTION CLIP J (SLOPED)i BEAM STAIR SYSTEM BEAM CFS w/(2) LAYERS L3z3xY KICKER 0 3'-0' OC CFS - i GYP EA FACE (CLEAR THE SLAB) � �� �� � SECTION SECTION @ STAIR SHAFT e� os o4 SCALE: N" = l'-0" DETy260_25051 841 SCALE: 34" = 1'-0" DETp255_25051 841