HomeMy WebLinkAbout7THIRD FLOOR FRAMING PLAN SCALE N" = l' -O" MW Will 0 1'2'- 4' 6' PLAN NORTH PLAN NOTES 1. T/SLAB +(32'-0') UNO. SEE SLAB SCHEDULE ON SB601. 2. T/STEEL +(31'-6)¢") UNO. 3. SEE SB401 FOR TYPICAL NOTES. 4. SEE SB601 FOR SCHEDULES 5. ALL BEAMS ARE CENTERED ON COLUMNS, UNO. 6. SEE ARCHITECTURAL FOR ALL OPENING LOCATIONS 7. ® DENOTES LIMITS OF DECK SPAN DIRECTION CHANGE M.9 O 3 SPA i 2 og C7 H S8x x9(6 20 GA, TYPE ' 8, GALV METAL ROOF DECK E �J H S8tw i o0 D CANOPY FRAMING PLAN 1 < 8 PLAN NORTH SECOND FLOOR FRAMING PLAN SCALE N" = l'-0" 0' 1'2' 4' 6' 16 PLAN NOTES 1. T/SLAB +(19'-0") UNO. SEE SLAB SCHEDULE ON 58601. 2. T/STEEL +(18'-W) UNO. 3, SEE SB401 FOR TYPICAL NOTES. 4, SEE SB601 FOR SCHEDULES. 5. ALL BEAMS ARE CENTERED ON COLUMNS. UNO. 6. SEE ARCHITECTURAL FOR ALL OPENING LOCATIONS. 7. DENOTES LIMITS OF DECK SPAN DIRECTION CHANGE. 8. SEE ARCH FOR T/STL ELEVATION FOR LINTELS BELOW SECOND FLOOR FRAMING. SEE 58101 FOR PLACEMENT OF STUB COLUMNS AT JAMBS. STUB COLUMNS SHALL BE WELDED OR BOLTED TO THE UNDERSIDE OF SECOND FLOOR FRAMING WITH (2) L3x3xY4xO'-6" ANGLES. 4 PLAN NORTH CARMEL CITY CENTER PEDCOR DESIGN GROUP Architecture / Project Managment: 335 Ridggeppooint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (tax) 860325 STATE OF McCOMAS 1Y111�4��� KEY PLAN SC&E: NTS PIAN NORTN Developer. P E D C O R ? i p ( en4w DEVELOPMENT CO. Project: ry W Z W Um C > ICU �C:C� U�°-E Co W m 5 ry Q U now BID SET B.200 Issue Date I Drawn By JCheoked By I P/041OG LKM JAF M Revisions: 5TEEL 54D 5Er 8.200 05/23/08 1 ADDENDUM/ODI 06/20N8 E518003 07/17= .516005 0911Ib8 Project Number: 25051 Sheet Title: SECOND & THIRD FLOOR FRAMING PLANS Sheet Number. S11201