HomeMy WebLinkAbout7THIRD FLOOR FRAMING PLAN
SCALE N" = l' -O" MW Will
0 1'2'- 4' 6'
PLAN NORTH
PLAN NOTES
1. T/SLAB +(32'-0') UNO. SEE SLAB SCHEDULE ON SB601.
2. T/STEEL +(31'-6)¢") UNO.
3. SEE SB401 FOR TYPICAL NOTES.
4. SEE SB601 FOR SCHEDULES
5. ALL BEAMS ARE CENTERED ON COLUMNS, UNO.
6. SEE ARCHITECTURAL FOR ALL OPENING LOCATIONS
7. ® DENOTES LIMITS OF DECK SPAN DIRECTION CHANGE
M.9 O
3 SPA
i
2
og
C7
H S8x x9(6
20 GA, TYPE
' 8, GALV METAL
ROOF DECK
E
�J
H S8tw
i
o0
D CANOPY FRAMING PLAN
1 < 8 PLAN NORTH
SECOND FLOOR FRAMING PLAN
SCALE N" = l'-0"
0' 1'2' 4' 6' 16
PLAN NOTES
1. T/SLAB +(19'-0") UNO. SEE SLAB SCHEDULE ON 58601.
2. T/STEEL +(18'-W) UNO.
3, SEE SB401 FOR TYPICAL NOTES.
4, SEE SB601 FOR SCHEDULES.
5. ALL BEAMS ARE CENTERED ON COLUMNS. UNO.
6. SEE ARCHITECTURAL FOR ALL OPENING LOCATIONS.
7. DENOTES LIMITS OF DECK SPAN DIRECTION CHANGE.
8. SEE ARCH FOR T/STL ELEVATION FOR LINTELS BELOW SECOND FLOOR
FRAMING. SEE 58101 FOR PLACEMENT OF STUB COLUMNS AT JAMBS.
STUB COLUMNS SHALL BE WELDED OR BOLTED TO THE UNDERSIDE OF
SECOND FLOOR FRAMING WITH (2) L3x3xY4xO'-6" ANGLES.
4
PLAN NORTH
CARMEL
CITY CENTER
PEDCOR DESIGN GROUP
Architecture / Project Managment:
335 Ridggeppooint Drive
Carmel, Indiana 46032
317.705.7979 (phone)
317.705.7980 (tax)
860325
STATE OF
McCOMAS
1Y111�4���
KEY PLAN
SC&E: NTS
PIAN NORTN
Developer.
P E D C O R
? i p ( en4w
DEVELOPMENT CO.
Project:
ry
W
Z
W
Um C
> ICU
�C:C�
U�°-E
Co
W m
5
ry
Q
U
now
BID SET B.200
Issue Date I Drawn By JCheoked By
I P/041OG LKM JAF
M
Revisions:
5TEEL 54D 5Er 8.200 05/23/08
1 ADDENDUM/ODI 06/20N8
E518003 07/17=
.516005 0911Ib8
Project Number:
25051
Sheet Title:
SECOND & THIRD
FLOOR FRAMING
PLANS
Sheet Number.
S11201