Loading...
HomeMy WebLinkAbout329092 08/22/18 (9, CITY OF CARMEL, INDIANA VENDOR: 366795 ONE CIVIC SQUARE H W C ENGINEERING CHECKAMOUNT: $*****8,527.25* CARMEL, INDIANA 46032 601 SOUTH 3RD ST CHECK NUMBER: 329092 TERRE HAUTE IN 47807 CHECK DATE: 08/22/18 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 250 4350900 101740 201816150001 8,527.25 HOME PLACE STRUCTURE VOUCHER NO. WARRANT NO. Prescribed by state Board of Accounts City Form No.201 (Rev.1995) Vendor# 366795 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER H W C ENGINEERING IN SUM OF$ CITY OF CARMEL 601 SOUTH 3RD ST An invoice or bill to be properly itemized must show:kind of service,where performed,dates service rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc. TERRE HAUTE, IN 47807 Payee $8,527.25 Purchase Order# ON ACCOUNT OF APPROPRIATION FOR Engineering Terms Date Due PO# ACCT# DATE INVOICE# DESCRIPTION DEPT# INVOICE# Fund#. AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT 101740 2018-161-S- 43-509.00 $8,527.25 1 hereby certify that the attached invoice(s),or 8/1/18 2018-161-S- ASA 1-Small Structure and Storm Sewer $8,527.25 0000001 0000001 Inventory:Home Place 2200 250 bill(s)is(are)true and correct and that the 2200 250 materials or services itemized thereon for which charge is made were ordered and received except Friday,August 17, 2018 Jeremy Kashman Director I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have audited same in accordance with IC 5-11-10-1.6 , 20— Cost 20Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer I HWC ! I Confidence in the buitt environment. 601 South 3rd Street "Terre Haute,Indiana 47807 ENGINEERING v►aaw.htveenglnt+ ring eom Carmel City of q? I 01-:4-40 Attn:Kate Lustig 2 SO— W&5 d o O One Civic Square Carmel, IN 46032 August 1,2018 Invoice No: 2018-161-S-0000001 _ Project 2018-161-S Carmel-ASA 1: Home Place PO#101740 Professional Services from July 2_2018 to July 29,2616 Phase 10 PO#101740 Professional Personnel Hours Rate Amount Principal 25.75 201.00 5,175.75 Sr Project Manager 4.00 196.00 784.00 Designer/Technican 12.50 100.00 1,250.00 Construction Inspector 1 12.00 105:00 1,260.00 Inspection Manager .50 115.00 57.50 Totals 54.75 8,527.25 Total Labor 8,527.25 Billing Limits Current Prior To-Date Total Billings 8,527.25 0.00 8,527.25 Limit 44,000.00 Remaining 35,472.75 Total this Phase $8,527.25 Total this Invoice $8,527.25 Billings to Date Current Prior Total Labor 8,527.25 0.00 --- --- Totals--- - -- - ------ - 8,527.25 '_____ __0.00 ---- - 0.00 - ---8,52-7.25--8,527.25 ----- -- --------- - -- --- - lndfanapofi j Torre Haute % Lafayette ( Scottsburg www.hwcengtnecring.com