HomeMy WebLinkAboutM003.0Products
PlotID Length Product Plies Net Qty
FJ1 32-00-00 11-7/8" BCI® 5000s-1.8 1 7
FJ2 28-00-00 11-7/8" BCI® 5000s-1.8 1 3
BM1 28-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 1 1
BM2 20-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2
BM3 16-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 1 1
BM4 10-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 1 1
BM5 6-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2
BM6 8-00-00 11-7/8" BCI® 5000s-1.8 1 1
BM7 4-00-00 11-7/8" BCI® 5000s-1.8 1 1
2-Ply 7-1/4" LVL By Others 14-00-00 3-08 x 1-00-00 Generic Material 1 1
Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 4
Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 18
Connector Summary
PlotID Qty Manuf Product
Hu1 4 USP THF20925
Start I-Joist Here
Comment 2
BM4
BM1
BM6
BM7
BM3 BM5
BM2
2-Ply 7-1/4" LVL By Others
Ca1
Ca1
Ca1
Ca1
Hu1
Hu1
FJ1
FJ2
Bk1
Bk1
1-11-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
1-02-00
BBO1
Sheet: 1/1
DWG:
Order #:
By: Jim Cruser
Date: 8/15/2018
Scale: NTS
BC FRAMER
18080048
202A The Grove @ Legacy
2nd Floor
NOTE:
ALL
MEASUREMENTS
TO BE VERIFIED
IN THE FIELD.
Revisions: BY:
DN01 DO NOT cut, notch or drill flanges
above to bearing below.
Solid block all posts from
F08
10-10d nails.
Nail with
Filler block.
Install tight to top flange.
mount hanger load exceeds 250 lbs.
Backer block required where top
Backer block (12" wide min.)
Nail with 10- 10d nails.
Install tight to top flange.
Joist hanger
F10
NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FOR DETAILS NOT SHOWN
All I- Joists and Versa-Lam Beams
Must Be Installed per The
Boise Cascade Installation Guide!
-----------------------------
Todo yo- los Rayos de Viguetas y
Versa-Huída Deben Ser Instalados
por La Guía de la Instalación de
Cascada de Boise!
FOR MULTIPLE PLY BEAM
CONNECTION SEE THE
"CONNECTION DIAGRAM"
SUPPLIED WITH JOB PACKAGE
08/30/18
Mike Sheeks