Loading...
HomeMy WebLinkAboutM003.0Toe Nail ZB ZB TB XB XB1 RTG T2B PB PG1 MG MB P2 P2 P3 PG4 P4 P5 PG7 P8 PB8 RPG PG6 LB TGE Z PG5 PG2 PJ3 PJ1 PJ2 PG3 VR1 VR2 VR3 VP2 VP3 VL1 VL2 VL3 VL4 VL5 VM V1X V2X V3X V4X VR4 JUS26 JUS26 JUS26 HUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 THDH26-2 THDH26-2 HUS26 JUS26 THDH26-2 THDH26-2 THDH26-2 JUS26 HUS26 JUS26 HUS26 JUS26 HUS26 JUS26 Z(2) R(9) P(4) VP1(3) L(2) L1(3) T1(2) T(5) P6(2) T2(8) 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 9-11 2-00-00 2-00-00 2-00-00 1-09-12 2-00-00 2-00-00 2-00-00 2-00-00 1-01-12 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-09-12 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-10-08 2-00-00 2-00-00 2-00-00 11-08 2-00-08 1-05-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 Order #: 18080049 The Grove at Legacy - 202B 7074 Cherry Creek Boulevard Carmel, Indiana 46033 Carter Lumber 2901 N. Morton St. Franklin, Indiana 46131 (317) 346-1300 THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See individual design sheets for each truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179. SHOP DRAWING APPROVAL THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR OTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL COND ITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU. REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________ Pyatt Builders Scale: NTS Date: 8/22/18 Drawn By: K. Bronnenberg Model Sausolito Notes: 1) Valley trusses are designed to sit on sheathing. 2) Installation of all temporary and permanent braces is essential. See truss drawings, BCSI-1 Building Component Safety information and building designers requirements. 3) Provide solid bearing for beams and girders. See Code and/or building deigners requirements. 4) Truss are NOT designed to be field modified unless noted otherwise. If any alterations are to be considered ALWAYS consult a qualified truss designer or engineer BEFORE making any alterations. 5) Add/remove overhangs as needed. Multi-Ply Girder Truss: See drawing of multi-ply girders for fastening pattern to connect plys so they act as one. All plys must be fastened together before supported trusses or framing is attached to girders. Hangers: Install all hangers per manufacturers requirements. 08/30/18 Mike Sheeks