HomeMy WebLinkAboutE001 - 227JGBUP
3 3
3
3
3
UP
3
3
3
3
UP
ZERO THRESHOLD
FRAMING ABOVE
MEDIA
BATH #4
BEDROOM #4
GAME
WETBAR
EXERCISE TO SWITCH ABOVE
FAN
LIGHT
CS
CS
HDMI (LOCATION TBD)
DROPPED MECHANICAL BULKHEAD
DROP CEILING FOR
MECHANICAL DUCTS IN
THESE SPACES
DROPPED MECHANICAL BULKHEAD
2
ID1
MECHANICAL/
UNFINISHED
STORAGE
PROVISION FOR WOOD WORKING
DUST CONTROL SYSTEM FOR SHOP.
(INCLUDES TRUNK LINE ROUGH-IN
AND ELECTRICAL ONLY) CLIENT TO
PROVIDE ADDITIONAL DETAILS.
GFI
SLOPED CEILING BELOW STAIRS
FURNACE EJECT SUMP
W.H.
WS R.I.
WINE
3/0‐6/8
TO SWITCH ABOVE
SINGLE POLE SWITCH
THREE WAY SWITCH
FOUR WAY SWITCH
SMOKE DETECTOR
TELEPHONE J ACK
TV/ DATA
EXHAUST FAN
DUPLEX OUTLET
WEATHER PROOF OUTLET
GROUND FAULT OUTLET
220V OUTLET
EYE RECESSED EYEBALL LIGHT
CEILING FIXTURE
WALL MOUNT FIXTURE
FLUORESCENT FIXTURE
RECESSED FIXTURE
T TRACK FIXTURE
UNDER CABINET FIXTURE
EXTERIOR FLOOD LIGHT
WIRE FOR PADDLE FAN
WIRE FOR PADDLE FAN
AND LIGHT KIT
CS
4 3
WP
GFI
220V
CUSTOMER:
PROJECT NAME:
LOCATION:
DRAWING TITLE: DRAWN BY:
Wedgewood
Building Co., LLC
317.669.6300
32 First Street NE
Carmel, IN 46032
www.wedgewoodbc.com
Copyright c 2015 Wedgewood Building Co. LLC.
8/7/2018
4:46:57 PM
E1
The Jacob Residence
Project Template
Lot @227 Bridgemont @ Jackson's Grant
BASEMENT ELEC. PLAN ABL
1/4" = 1'-0"
3 BASEMENT ELECTRICAL PLAN
ELECTRICAL PLAN NOTES:
1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.
Rev.
No. Date Description
CIRCUITS TO BE LOCATED:
WINE ROOM: 110V CIRCUIT FOR COOLING SYSTEM
LAUNDRY ROOM: 110V CIRCUIT FOR IRONING CENTER
COVERED PORCH: 110V CIRCUIT FOR MOTORIZED SCREENS
COVERED PORCH: 240V, PLACEMENT TBD
GARAGE: 110V CIRCUIT FOR GAS GARAGE HEATER
MASTER BATH: 110V CIRCUIT FOR HEATED TOWEL WARMER
MASTER BATH: 240V CIRCUIT FOR ELECTRIC FLOOR HEAT
HOT TUB: (DELETED PER CHANGE ORDER)
UNFINISHED MECHANICAL ROOM: 240V, PLACEMENT TBD
By Andrew Lund at 4:17 pm, Aug 09, 2018
08/29/18
William Hohlt