Loading...
HomeMy WebLinkAboutE001 - 227JGBUP 3 3 3 3 3 UP 3 3 3 3 UP ZERO THRESHOLD FRAMING ABOVE MEDIA BATH #4 BEDROOM #4 GAME WETBAR EXERCISE TO SWITCH ABOVE FAN LIGHT CS CS HDMI (LOCATION TBD) DROPPED MECHANICAL BULKHEAD DROP CEILING FOR MECHANICAL DUCTS IN THESE SPACES DROPPED MECHANICAL BULKHEAD 2 ID1 MECHANICAL/ UNFINISHED STORAGE PROVISION FOR WOOD WORKING DUST CONTROL SYSTEM FOR SHOP. (INCLUDES TRUNK LINE ROUGH-IN AND ELECTRICAL ONLY) CLIENT TO PROVIDE ADDITIONAL DETAILS. GFI SLOPED CEILING BELOW STAIRS FURNACE EJECT SUMP W.H. WS R.I. WINE 3/0‐6/8 TO SWITCH ABOVE SINGLE POLE SWITCH THREE WAY SWITCH FOUR WAY SWITCH SMOKE DETECTOR TELEPHONE J ACK TV/ DATA EXHAUST FAN DUPLEX OUTLET WEATHER PROOF OUTLET GROUND FAULT OUTLET 220V OUTLET EYE RECESSED EYEBALL LIGHT CEILING FIXTURE WALL MOUNT FIXTURE FLUORESCENT FIXTURE RECESSED FIXTURE T TRACK FIXTURE UNDER CABINET FIXTURE EXTERIOR FLOOD LIGHT WIRE FOR PADDLE FAN WIRE FOR PADDLE FAN AND LIGHT KIT CS 4 3 WP GFI 220V CUSTOMER: PROJECT NAME: LOCATION: DRAWING TITLE: DRAWN BY: Wedgewood Building Co., LLC 317.669.6300 32 First Street NE Carmel, IN 46032 www.wedgewoodbc.com Copyright c 2015 Wedgewood Building Co. LLC. 8/7/2018 4:46:57 PM E1 The Jacob Residence Project Template Lot @227 Bridgemont @ Jackson's Grant BASEMENT ELEC. PLAN ABL 1/4" = 1'-0" 3 BASEMENT ELECTRICAL PLAN ELECTRICAL PLAN NOTES: 1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL. Rev. No. Date Description CIRCUITS TO BE LOCATED: WINE ROOM: 110V CIRCUIT FOR COOLING SYSTEM LAUNDRY ROOM: 110V CIRCUIT FOR IRONING CENTER COVERED PORCH: 110V CIRCUIT FOR MOTORIZED SCREENS COVERED PORCH: 240V, PLACEMENT TBD GARAGE: 110V CIRCUIT FOR GAS GARAGE HEATER MASTER BATH: 110V CIRCUIT FOR HEATED TOWEL WARMER MASTER BATH: 240V CIRCUIT FOR ELECTRIC FLOOR HEAT HOT TUB: (DELETED PER CHANGE ORDER) UNFINISHED MECHANICAL ROOM: 240V, PLACEMENT TBD By Andrew Lund at 4:17 pm, Aug 09, 2018 08/29/18 William Hohlt