HomeMy WebLinkAboutWhite Construction/Eng/CO #1/575,901.09/Monon Boulevard Phase 1 – Project #16-ENG-22 & 15-ENG-32City of Carmel Project 16 -ENG -22 & 16 -ENG -32
Monon Boulevard- Phase 1
CHANGE ORDER #1
Change order represents additional work completed outside of the contract and to expose of
contaminated material between 2nd Street and 4 I Street. QRpL
Contract Price prior to this Change Order
Contract Price will be increased by this Change Order
New Contract Price including this Change Order
d
$6.996,000.00
5575,901.09
$7,571,901.09
PO -100686 PO -100687 Contract Price
Cumulative %
Change from
Original Contract
Original Contract $5,746,000.00 $1,250,000.00 $6,996,000
N/A
Change Order 1 $575,901.09
8%
I
I
a
Adjusted Amount $6,321,901.09 $7,571,901.09
CITY OF CARMEL
TO: White Construction, Inc. CONTRACT CIiANGE ORDER NO.: I
3900 E. White Avenue DATE: 8!712018
Clinton, IN 47842 PROJECT NAME: 16 -ENG -22 and 16 -ENG -32 Motion Boulevard Phase
I
CITY REQ. NO.:
CITY PO NO.: 100686
CITY PO DATE: 8128117
1. You are directed to make the following changes in this Contract:
Add additional items items due to nnodifacstions in the field and regU,es;., ir,7n, Carmel Utility Departments.
SCI4EDULED ADJUSTMENT
ITEM AMOUNT H OR t l DAYS
• See detail of items and summary of changed costs in attached Table
TOTAL OF CHANGE ORDER IT£MS S57S,901A9 0 Days
H. The following referenced Documents further describe the changes outlined in Paragraph 1,
and are to be considered a part of this Change Order: R.F.P.:i _W.D.C. NO.,
Other: _ By Request from the City of Carmel per proposals included herein
The changes result in the following a4justnxtit of Contract Price and Contract Time:
Contract Price prior to this Change Order
S6.996.000.00
Contract Price will be increased by this Change Order
$575.901.09
New Contract Price including this Change Order
$7,571.901.09
Contract Time prior to this Change Order 273 Days
611/2018 Completion Date
Net increased resulting from this Change Order
213 Days
Current Contract Time including this Change Order
12/31/2018 Completion Date
This Change Order is for full and final settlement of all direct. indirect. impact costs and time
extensions incurred at any time resulting from the performance of the changed work. 1
The Above Changes Are Recommended The Above Changes Are Accepted A Nod
CROSSROAD ENGNEER
ENGINEER
3417 Sherman Drive
Address
Beech Grove. IN 46107
City/State/Zip
or
By:. L,�.1,t+2Z x4o Y ±okehf,
Phone: 3t7 -7V_ -t555
Date: 8/7/2018
White Construction. Inc. amcs Brainard, Mayor
CONTRACTOR /— 1-11? ---), A
3900 E. White Avenue J r a n n. n el
Address
Clinton. IN 47842 M II r e
City/State/Zip
Lo ' W ember
Phone: 574-875-5183
ate, f Ch tr siine S.
woi
Date:I < Date:
16 -ENG -22 & 16-E`G32 Motion Boulevard Phase 1
CHANGE ORDER #1 TABLE
Ilk,
NO
y
2 53
Added Sidewalk
SYD
S 92.00
0
S
365.03
S
33.582,76
S 33 582,76
168
Contaminated Concrete Removal 2nd Street to 4th Street
LS
578,620,02
0
S
i
S
78,520.02
S 73,620,02
169
Expe4to Granite Deliver (A.rchitech ral S cialtie3
LS
$105,538.00
0
$
1
$
105,538.00
S 105,538.08
170
Nionon and Main Stred (Granita`Paver Purchase)
LS
567,729.00
0
$
1
S
67 729.00
S 67.729.00
171
Additional Water Matn Work (1,19± 13 to 2'1618'
LS
$16,241.35
0
$
i
S
16,241,35
$ 16,241,35
1721
Tree Rsmoval - Camvel Hi:dnrical Society
IS
42,035.00
0
$
i
S
2,035.00
S 2,035,00
1731
March T&M Requests
LS
$4,64', .14
0
S
i
S
4,647.14
S 4,647.31
174 Monon and Main Street GranitePaver Purchase (REVISED) LS
'$4,000.00)
0
$
i
S
(4,000 00)
$ (4,000.0(;
175
Phase 2 Granite Curb and Paver Pw;haso
LS
$212.23600
0
S
1
$
212,23600
$ 212,236.00
176
May T& M Requesu
LS
$9,62859
0
$
1
S
9,628.54
$ 9,628,59
177
Paver Trav,
EA
$1,13600
0
$
4
$
4,5.14.00
S 4,544.00
178
Trans£ormcrRS12-60;,1-LED-Mononand.Mmn
EA
$7253
0
S
11
S
797,83
S 797,8:
179
rUtility Bollard
1EA
$5,79500
o
S
1
$
5,795.00
$ 5,795,00
180
Tree Crate Revision • .tc-nonn and $lain
!LS
$10,01117 00
0
$
1
S
10,0!?,00
S 10,077,00
181
Excavatioa1&l1m %Surface at Main Street
LS
$24,0.4590
o
S
i
S
24,045.90
S 24,045.40
182
Added ipdhSttjup
LS
$4,38350
0
S
i
.,,
S
4,383,50
S 47383,50
ORIGfNALCO\TRACT PRICE $ 6,996,000.00
FINAL CHANGE ORDER al $ 575,901.09
NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS $ 7,571,901.09
16-ENG-22 & 16-ENG-32 MONON BOULEVARD PHASE I
EXHIBIT A
You traye been directed to make the foilow•ing chaagcs in this Contract;
added to the contract to accommodate requests from. the Cit}• to add sidewalk in other
163 Added Sidewalk
locations
168 Contaminated Concrete Removal 2nd Street to 4th Street
added due to contaminated soils found between 2nd and 4th Street.
169 Eite Granite Deliver (Architectural S iahies)
added due to a request to expedite the grarift delivery for Phase I,
added the Main Street intersection reconstmction to the contract, and this item
170 Montan and Main Street (GranitelPaver Purchase)
accounted for the granite procurement.
171 Additional Water Main Work (11291 18 to 2116118)
added to account for relocation of the crater main due to conflicts.
172 Tree Removal - Carmel Historical Society
added per the C 's direction to remove a tree at the Carmel Historical Society,
173 March T&M Pqnts
added to account for added work Shat was paid by T&hf,
174 Manon and Main Street GraniteAlaver Purchase REVISED
added to account for a discrepancy in the Monon and Main gMite PQ:
175 Whase 2 Granite Curb and Paver Purchase
added to purchase ite for the Phase 2 prpjccL
1761Nlay T&M Reque3ts
added to account for added work that was pa4 by T&M.
177 Paver Tra s -
added to account for payer trays that were added to the contract
178 Transformer RS 12 2-60M-LED - Monon and 4Sain
added to account for transformers that were needed at Monon and Main Street Plaza
and wxren't accounted for in the desi .
179 utility Bolbtrd
added to account for a utility bollard thatwas called out on the Motion and Main Plaza
lana, but wasn't accounted for in the pay item list.
190 Tree Grate Revision - Monon and Main
added to account for revislam to tree grates a the -Monon and Main Placa.
added to the contract to mill and resurface the Main Street intersection to
18 1 Excavatior Mlliing/Strface at Main Street
accommodaterttde changes,
added to the contract due to irrigation items not being on the Monon and Main Street
F82 Added Irrigation (Moron and Main Plazaj
Plaza pay items.
Memo
To: Doug Haney, Corporation Counsel
From: Lisa Scott
CC: Jeremy Kashman
Date: 08/08/18
Re: C.O. #1 Monon Boulevard -Phase 1 Project #16 -ENG -22 and 16 -ENG -32
Doug, please find attached 1 original of same change order for project #16 -ENG -22 and 16 -ENG -32 Monon
Boulevard -Phase 1. Please review & initial for the next BPW Meeting.
Change Order #1- Original Contract Amount: $6,996.000.00 Increase: $575,901.09 New Contract Amount
$7,571,901.09
Thank you,
Lisa Scott
• Page 1