Loading...
HomeMy WebLinkAboutCalumet Civil Contractors/Eng/CO #1/10,112.94/Carmel Small Structure Replacement – Project #16-SW-08 CITY OF CARMEL TO: Calumet Civil Contractors 4898 Fieldstone Drive Whitestown, IN 46075 q RO1, CONTRACT CHANGE ORDER NO.: 01 ,i ,e DATE: July 31, 2018 • PROJECT NAME: 16-SW-08(2)Culvert#43 and#85 �o{ CITY REQ.NO.: CITY PO NO.: 100662 CITY PO DATE: t- .i I C C'- L E-`, 1. You are directed to make the following changes in this Contract: Addition of fifty five(55)lineal feet of four rail treated timber protective fencing for subtle multi-use path protection for pedestrian users from unwanted interaction with Clay Creek. II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: N/A WDC No.: 1 See Work Change Directive#1 for additional description The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order: $814,300.00 Contract Price will be increased/decreased by this Change Order: $10,112.94 New Contract Price including this Change Order: $824,412.94 Contract Time Prior to this Change Order- Completion Date: August 15,2018 Net increased/decreased resulting from this Change Order: Days: 0 Current Contract Time including this Change Order- Completion Date: August 15,2018 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended: Accepted: HWC Engineering Calumet Civil Contractors A__... _. A ENGINEER CONTRACTOR Jar %. ., ayor 135 N. Pennsylvania Suite 2800 4898 Fieldstone Drive ad Address Address Ma -• ber Indianapolis,IN 46204 Whitestown, IN 46075 �' Ia City/Star r jrCity/S to/Z' L.ri -C., , Member BY 'Z_i( ___ G(. By: Jere 'as• a CI Phone: 317-13C- (0; 2.. Phone: i-2�-)6 ngme r '3 Date: July 31, 2018 Date: July 31,2018 q E -- -,,',,,, , CZzieg hristina S.Pauley, Clerk-Treasurer Date: , ./_i1ii. f.C►a/. CITY OF CARMEL TO: WORK DIRECTIVE CHANGE NO. 01 DATE: 03 13 2018 PROJECT NAME:Culvert p43- Hoover Road over Clay Creek PROJECT NO.: 16-SW-08(2) Specification Reference SEE DESCRIPTION Drawing Reference: Not Applicable - Extra work added by OWNER DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE: Addition of fifty five(55) lineal feet of four rail treated timber protective fencing for subtle multi-use path protection for pedestrian users from unwanted interaction with Clay Creek. Twenty five(25) feet will go south of the new structure,and thirty feet (30) north of the new structure. All work to be in accordance with the 2016 Indiana Department of Transportation specifications and standard drawings under section 603.00. All materials to be in accordance with the same sections,as well as any requirements listed in section 911. REASON FOR THIS ORDER: Added Pedestrian Access Route(PAR)protection AUTHORIZATION: THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS OUTLINED. A Contract Change Order in the amount of S 10 112.94 will be issued to you in the near future to cover this Work Directive Change. PROJECT COMPLETION DATE: ADD-DEDUCT/UNCHANGED 0 DAYS. By: David C. Lancet,HWC Engineering Approved By: Owner's Representative CITY OF CARMEL BOARD OF PUBLIC WORKS AND,.SSAFETY By: Se-1 1)(--9 J y rainard 'Iayor/ / By: tip Mary e urkfidiv ember By: ,► Lor� W'at-,', emOer DATE: i8 By: Jer y K shtnan,City Engineer A //7 DATE: TTEST: l/�Lc1 GCG .CLLC:--e- " Date: 'Christine S. Pauley,Clerk-Treasurer V R o Pc47-r-T's .vjtry._ -pitEr_-TivG e 14-414c1E-._ No .1 zi fp i Zplib 0 0 0 0 - + + 1 (NI v) & i VII LACE rx on SM.OWNERS VIllaGF OF WIS1Ci AY MOORS follenonn.0, meerrein Owe,-, \ 45'R/VI N.11,01011,miok. 45-R/VI .....••.=.„. 7..... , z. :L11 OF SILT FEW 140 it 1./1 OF 50.7 flute.-..„...,...v • i Ali? ...........__,... ._____.__ __,‘_. -.. ..7.777...:-.7•--- • • it plitg kV! tor ----__._______:,,,,:_---- . .... . ........ ._. ........_. END INCIDENTAL /SA 14+00.00 A . _____.--- - - WITI:4,E,,L. ., . •ttet.,o0.? . •..._,_. •••••• s'--- I u,,....1-„,!.-:-.--.-7--- 7: ....--- POD .04,404' 'itillit:41 51 1:11vottamp - -neft, MP Oft, 7•41.0-91.*44 IP. "P01.41.•',a -\,,,, 77........................ . ---.. 1 ---' \ .. .1 \ ki \ w 19.1/4100.•54 1 W.Nr t MI"A' NerbrEft Lad Dk. .1 ii,147a/,1010511 00 .5 BEGIN PROJEd7. •-••...---:---_, ._.....-- ..,...• ENO PROJECT .••• STA 13+75.00 A STA 11+50.00 "A" ••.... \ I. -._-- N 1718321.90 ' ••.. CS /1\ &--- .14 ..'.:4 .4 - (g8 ••••••' N 17185411.98 E 180534.38 C 180533.84 .............- ----.3 'IT 1' r-1..4,..,....,..",....v,•.;•.4t,...•••'-' .-•• • i -......rt':I J,rii.ilitt.r.i,y0..trigt%:' it 3--.-.-- .••-----•Tr..ItitA.rii"..;•eiN..... • a . . . c4, ..,44,111tit itift.:.:.: • . . . . • tiri",:gti ele . . . DoWolenno Puma---- i C V ,_,sit . t, . ' • . s.1 OW{ii. si.e..414 *log r i •4 ,•.,.,,.. 11...--IF.-jr,---17-51--.--Y-nnnn-17.nnn•-tr--. --1,--- 17-- 1-714.two on eve pee see 4.17-- 1,4_,. 'S 05 01 OF SIT FCMCE-/ /9 I I \ 70 Ill ar LI 1TMCF Co11401ont witn m leperre,ireversohe Cheri.D.eo-/ , ieihierviees veil., N N. Pinne,,round nollic wili.leneorery ...prep plunge ono..tee eel. IM1.0.C.:•WO,,.:(VENI 1.0407 If-1.11V:j....V1411r-.---,....,....--- IliGil CPOVE EROSION CONTROL LEGEND nal Cfithe.., lornpoeo,1,41 , • 6,- -r..- G," fi l ki 14017LOW115115 4550001 00410.11115 ASSOCIA1.00 D_K1 eso scrvivam INPORARY Komi)ROCK Cif Clf MU WKS. 1 0.7.0.01.1$11.0ng lo MA•Mee.on oll Ololorhal own 11 AA GI egIA.L.- 7 E7mOon Con.,15.441 lo bo gored on 01.dislutboa ore. . Innigumery Among In lohe Woo,on disliehed erees...eel.le be inactive kr 7 ben .4'1i' ,a-RFV111411 WNW 01171 CrC01(71elS !Zr; („.......... t„ -I-oults4u.S 4. 5.44.moo.consInnUon entre...nod commie nosh ma Moo irleelkleh am coWoes Fospinwawer 5 FM 4..1.401 Danlano,Ova.Dom Dokals see 44001 510 C 705-7CCO-Oiond 02 - I u.,a.mitlIVAP MCP CEOTI1711.CS -_._-- '\ (-Try of:cARN11:1 ,...i.. AU •ibl-i' HWC NDIVIIPOLS-WAIF 1141Ir A;:.:,,,,t 31.,2.....1„! I IAMILTON COUNTY 4444c-L - i --W.W.I.SCALE _ 45507710110. /7 071-aii, r1311179 le P LATAVCITC•NCW ALOANY•WWI( ,. •••••••. . 541.040.__ 10/_ Mow rROSIONCIINTItol. 'WORT 8001. %Mtn ENGINEERING 1.00Mrphirni.4.... g 714: --1-,- ---n,-...- 0/40110 .41 Otenttl,_._.7,L tit)1 MR WAD NM I'l AY CRITIC 7015-11 W 5 5 1 crr osetj-VOCT- , ti .47- G "15E1)°41E34:1 3V -)t. 0.5-r .1-001 t KILI TO 12-Dr-- CALUMET CALUMET CIVIL CONTRACTORS, INC. LETTER OF TRANSMITTAL TO: HWC DATE: 3-20-2018 PROJECT: 16-SW-08 Small Structures JOB: 17041 ATTN: Mr. Dave Lance RE: EWA: Wood Railing We Are Sending: I Submitted For: Action Taken: Shop Drawings X Approval Approved as Submitted Letter Your Use Approved as Noted Prints/Plans As Requested Returned After Loan X Change Order Review and Comment Resubmit ! Copies Samples Submit I Copies Specifications I Sent Via: Hand Delivered to F.O. Returned Other: I X Attached Returned for Corrections Separate Cover Via: Due Date: Notes/Remarks: Dave, Please use the pricing below to assist you in processing a Change Order as described below. Thank you. UNIT ITEM DESCRIPTION QTY UNIT PRICE EXTENSION EWA Wood Railing 59.5 LFT $ 156.52 $ 9,312.94 EWA M.O.T. 1 LS $ 800.00 $ 800.00 TOTAL $ 10,112.94 tRy.an gleam Ryan Ream — Project Manager 4898 Fieldstone Dr. Whitestown, IN 46075 317-769-1900 FAX 317-769-7424 CALUMET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE OTY 16-SW-08 Small Structures Wood Railing 17041 60 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE DT RATE LABOR AMT LABOR MU 0 0 ST $0.00 $0.00 $0.00 $0.00 $0.00 Sum of LABOR $0.00 $0.00 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 0 0 $0.00 0 $0.00 Sum of Equipment $0.00 $0 00 L MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 0 $0.00 0 $0.00 Sum of MATERIAL $0.00 $0.00 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 0 0 $0.00 $0.00 $0.00 Sum of RENT 50.00 $0.00 16-5W-08 Small Structures Wood Railing 17041 60 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 3/20/2018 Wood Railing 59.5 LFT $145.00 8627.5 Sum of SUBCONTRACTS $8,627.50 $693.93 TOTAL COST $8,627.50 TOTAL MU $693.93 BONDS/INSURANCE $69.91 TOTAL $9,391.34 UP $156.52 CITY OF CARMEL ENGINEERING DEPARTMENT Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 08/14/18 Re: C.O.#1 Carmel Small Structure Replacements Project#16-SW-08 Doug, please find attached 1 original of same change order for project #16-SW-08 Carmel Small Structure Replacements. Please review&initial for the next BPW Meeting. Change Order #1- Original Contract Amount: $814,300.00 Increase: $10,112.94 New Contract Amount $824,412.94 Thank you, Lisa Scott • Page 1