HomeMy WebLinkAboutCalumet Civil Contractors/Eng/CO #1/20,053.61/121st Street Stormwater Improvement Project – Project #16-SW-74 CITY OF CARMEL TO: Calumet Civil Contractors 4898 Fieldstone Drive 01 �� �� Whitestown, IN 46075 CONTRACT CHANGE ORDER NO.: o July 31,2018 DATE: 16 SW,74121st Street Drainage 0 PROJECT NAME: CITY RECi• NO.: 100744 CITY PO NO.: AT September 22,2p17 CITY PO DATE: to make the following changes in this Contract: man property. i, You are directedencompass m ass this change order. 1)T&M work at the Shoop Seven Item sections at Location C. 3)Additional Drainage Location D.4)Additional clearing 2)Two end sections pipe changes at Location B I: Location D. 5)Add erosion control blankets.6)and 7)Elliptical p p WDC No.: �• referenced Documents further describe the changes outlined In Paragraph li. The following part of this Change Order:R•F•P.: and are to be considered a pa Documentation from the contractor See attached Change Order Doc Underruns not reflected This work will be offset by other items underruns on the contract. in this change order. The changes result in the following adjustment of Time: $178,700.00 Contract Price and Contract $20,053.61 Contract Price prior to this Change Order:decreased by this Change Order: $198,753.61 New Price will ie during this Change Order: Completion Qate: l 2 Contract Price including a Order- Days: 0 018 Contract Time Prior to this Chang from this Change Order: Completion date: July 1,2018 Net increased/decreasedContractTime inludin resulting is Change Order- Current Contract Time including This Change Order is for full and final settlement of all direct,indirect,impact costs and time time resulting from the performance of the changed work. Approved: extensions incurred at any App The Above Changes Are � The Above Changes Are Accepted: Recommended: / c: %�'��'t / Calumet Civil Contractors i�e _ ,�inard f aYor/ ineering CONTRACTOR �r HWC Eng 1j!¢ember ENGINEER 4898 Fieldstone Drive Mai y:I s` 135 N.Pennsylvania Suite 2800 Address Address Whitestown,IN 46075 Lori , .,•n,Member Indiana offs,IN 46204 City/ aie/ZiP �� •Engineer City/State �By: \ J�J '� Jere s By'. � Phone: - So-��� A E �:..�, Phone: ?j1� Date: July 31,2018 tlna S. G��/%�? Date: July 31,2018 hristlna S. PauleY� Date:Treasure �, �� _'r�'� CALUMET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE OTY 121st Street Storm Improvements Shoopman Property Changes 17048 1 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE DT RATE LABOR AMT LABOR MU 4/19/2018 Operator 103 3 ST $58.20 $77.77 $97.35 $174.60 $94.92 4/19/2018 Laborer 3 ST $42.43 $55.77 $69.12 $127.29 $25.46 4/19/2018 Laborer 3 Sr $42.43 $55.77 $69.12 $127.29 $25.46 4/19/2018 Foreman 3 ST $59.32 $78.90 $98.75 $177.96 $35.59 Sum of LABOR $607.14 $121.43 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 4/19/2018 Loader Volvo L60E-323 3 $93.75 281.25 $33.75 4/19/2018 Excavator Cater 321-12 3 $99.75 299.25 $35.91 4/19/2018 Pick-up Chevr 2500-620 3 $15.45 46.35 $5.56 Sum of Equipment $626.85 $75.22 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 0 0 0 $0.00 0 $0.00 Sum of MATERIAL $0.00 S0.00 560 prox0,}0 )oN(V CALUMET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE OTY I 17048 2 121st Street Storm Improvements E-7 Inlet LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE DT RATE LABOR AA. R MU 5/4/2018 0perat0r841 3 ST $58.51 $76.80 $95.08 $175.53 p5.11 5/4/2018 Laborer 3 ST $42.43 $55.77 $69.12 $127.29 $25.46 5/4/2018 Laborer 3 ST $42.43 $55.77 $69.12 $127.29 $25.46 5/4/2018 Foreman 3 Sf $59.32 $/8.90 $98.75 $177.96 $35.59 $608.07 $121.61. I Sum of LABOR EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU I 5/4/2018 track Loader Cater 247B-430 3 $26.74 80.22 $9.63 5/4/2018 Pick-up Chevr 2500-620 3 $15.45 46.35 $5.56 Sum of Equipment $126.57 $15.19 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 0 0 0 $0.00 0 $0.00 Sum of MATERIAL $0.00 $0.00 , RENTED EQUIPMENT r N(� j Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 1 , �r 0 4 $0.00 $0.00 $0.00 VJC L ritill , Sum of RENT a$0.00 $0.00 (I (,. I 121st Street Storm Improvements E-7 Inlet 17048 2 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $734.64 TOTAL MU $136.80 BONDS/INSURANCE $6.54 TOTAL $877.98 UP $438.99 PROJECT NAME 1 T M EXPLANATION CALUMET JOB NO 1121st Street Storm Improvements I E-7 Inlet CALUMET CODE OTY 17018 I 2 LABOR i Date LABOR TYPE Date 018 HOURS ST-OT ST RATE OT RATE DT RATE LABOR AMT LABOR MU Operator 103 4/30/2018 S7 $58.20 $77.77 Laborer $97.35 $58.20 4/30/2018 1 ST $42 43 $55 77 $11.64 Laborer 1 ST $69.12 $42.43 4/30/2018 $42.43 $55.77 $8.49 Laborer $69.12 1 ST $42.43 $8.49 4/30/2018 $42.43 $55.77 $69.12 $42.43 Foreman 5/1/2018 1 ST $59.32 $78.90 $8.49 Operator 103 2 ST $98.75 $59.32 5/1/2018 $58.20 $77.77 $11.86 Operator 103 2 $97.35 $116.40 5/1/2018 ST $58.20 $77.77 $23.28 Laborer $97.35 $116.40 5/1/2018 ST $42.43 $55.77 $23.28 Laborer 2 2 ST $69.12 $84.86 5/1/2018 $42.43 $55.77 $16.97 Laborer 2 $69.12 $84.86 5/1/2018 ST $42.43 $55.77 $16.97 Foreman $69.12 $84.86 5/11/2018 Sf $59.32 $78.90 $16.97 Operator 103 $98.75 $118.64 5/11/2018 4 ST $58.20 $77.77 $23.73 Laborer $97.35 $232.80 5/11/2018 4 ST $42.43 $55.77 $46.56 ILaborer 4 $69.12 $169.72 Sum of LABOR ST $42.43 $55.77 $33.94 $69.12 $169.72 $33.94 EQUIPMENT S1,423.07 s284.61 Date EQUIPMENT Date 4/30/2018 EQP HRS RATE EQP AMT Loader Volvo L60E-323 EQP MU ( j 1 $93.75 f , A �/ 9.5 5/1/2018 Excavator Cater 321-12 93.75 $11.25 1,V Y` Ix, 2 $99.756 �� c6‘it 5/1/2018 Pick-up Chevr 2500-620 30.9 $23.94 ,/r ' 2 $15.45V W` 5/11/2018 Excavator Cater 308E2CR-11 30'9 $3.71 4 $70.16 280.6248 ( /, `/ Sum of Equipment $33.67 / O lam" $604.77 $77_.57 121st Street Storm Improvements E-7 Inlet 17048 2 I I MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 0 0 0 $0.00 0 $0.00 Sum of MATERIAL $0.00 $0.00 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU Dump Trucks 3 $98.00 $294.00 $35.28 Sum of RENT $294.00 $35.28 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $2,321.84 TOTAL MU $392.47 BONDS/INSURANCE $20.36 TOTAL $2,734.67 UP $1,367.33 CALUMET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE OTY 121st Street Storm Improvements Additional Clearing 17048 99901 1 . . ..... . ....... .. LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE DT RATE LABOR AMT LABOR MU 4/13/2018 Laborer 5 ST $42.43 $55.77 $69.12 $212.15 $42.43 4/13/2018 Foreman 5 ST $59.32 $78.90 $98.75 $296.60 $59.32 4/30/2018 Operator 103 0.5 01 $58.20 $77.77 $97.35 $38.89 $7.78 4/30/2018 Operator 103 7 ST $58.20 $77.77 $97.35 $407.40 $81.48 4/30/2018 Laborer 1.5 OT $42.43 $55.77 $69.12 $83.66 $16.73 4/30/2018 Laborer 21 ST $42.43 $55.77 $69.12 $891.03 $178.21 4/30/2018 Foreman 1 OT $59.32 $78.90 $98.75 $78.90 $15.78 4/30/2018 Foreman / SI $59.32 $/8.90 $98./5 $415.24 $83.05 Sum of LABOR $2,423.86 $484.77 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 4/13/2018 Excavator Cater 321-12 5 $99.75 498.75 $59.85 4/13/2018 Pick-up Chevr 2500-620 5 $15.45 /7.25 $9.27 tJ ' 4/30/2018 Loader Volvo160E-323 7.5 $93.75 703.125 $84.38 (j;LIU V , 4/30/2018 Pick-up Chevr 2500-620 7.5 $15.45 115.875 $13.91 Sum of Equipment $1,395.00 $167.40 v' ! aji3O,_ki tO- MATERIAL Uace MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU J(/,(J r/,a° t'0 CYS $0.00 0 $0.00 Sum of MATERIAL0\4, $0.00 50.00 121st Street Storm Improvements Additional Clearing 17048 99901 1 RENTED EQUIPMENT Date RENTED EQP RENTED EQP I-IRS RENTED EQP RATE RENT AMT RENT MU 0 $0.00 $0.00 $0.00 Sum of RENT $0.00 $0.00 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $3,818.86 TOTAL MU $652.17 BONDS/INSURANCE $33.53 TOTAL $4,504.56 UP $4,504.56 CALUMET � � , � ����;��� anti-� PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE OTY 121st Street Storm Improvements Erosion Control Blanket 17048 400 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE DT RATE LABOR AMT LABOR MU 0 0 ST $0.00 $0.00 $0.00 $0.00 $0.00 Sum of LABOR $0.00 $0.00 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 0 0 $0.00 0 $0.00 Sum of Equipment $0.00 $0.00 MATERIAL 1 Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 0 $0.00 0 $0.00 Sum of MATERIAL $0.00 $QOU RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 0 $0.00 $0.00 $0.00 Sum of RENT $0.00 $0.00 121st Street Storm Improvements Erosion Control Blanket 17048 400 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU Erosion Control Blanket 400 SYS $2.14 856 Sum of SUBCONTRACTS $856.00 $85.60 TOTAL COST $856.00 TOTAL MU $85.60 BONDS/INSURANCE $7.06 TOTAL $948.66 UP $2.37 PER SY Slusser'sGreen Thumb,Inc. Phone: (574)722-3102 125 Montgomery Street Toll Free: (800)762-7442 Post Office Box 33 Fax: (574)722-2993 wmom ia Logansport,Indiana 46947-0033 Estimating Fax: (574)722-1628 Website: vww.slussers.com Seeding-Sodding,Erosion Control, Landscaping Email: into@stussers,com Prequalified-Certified Indiana"WBE"Contractor S LLJ S S E RS QUOTATION Customer: CALCIV Quoted: May 11,2018 Quote No. 121ewa Calumet Civil Contractors, Inc. Bids: May 11,2018 Project: EWA 121st Street Stormwater Improvements***** 5265 East 96th Street Location: Hamilton County, Indiana, USA Indianapolis IN 46240 Estimated by: John Williamson, Extension 3210 Phone: (317)769-1900 Revised: Fax: (317) 769-7424 Revisions: Attn: Ryan Ream LINE ITEM BID ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT *****EWA 1 1 Straw Net Erosion Control Blanket w/ R Mix 400.000 SY $ 2.14 $ 856.00 SPECIAL NOTATIONS***** Accepted by: Calumet Civil Contractors, Inc. Date Subtotal: $ 856,00 SPECIFIC CONDITIONS ARE LISTED ON THE NEXT PAGE Sales Tax: Equal Opportunity Employer Total: $ 856.00 CALUMET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE OTY 121st Street Storm Improvement Elliptical End Sections 17048 2 I LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE DT RATE LABOR AMT LABOR MU Operator 103 4 ST $56.55 $75.72 $89.81 $226.20 $45.24 Laborer 4 Si $41.17 $54.23 $67.29 $164.68 $32.94 Foreman 2 ST $57.68 $77.40 $92.05 $115.36 $23.07 Sum of LABOR $506.24 $101_25 EQUIPMENT ---- ------ -- ----- -- --- -- ---- Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU Loader Volvo L60E-323 2 $93.75 187.5 $22.50 Excavator Cater 314D-13 7 $66.73 133.46 $16.02 Pick-up Chevr 2500-620 2 $15.45 30.9 $3.71 Sum of Equipment $3 51..86 $42.22 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU Elliptical End Section 2 EA $600.00 1200 $144.00 Sum of MATERIAL $1,200.00 $144.00 RENTED EQUIPMENT r Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 0 0 $0.00 $0.00 $0.00 Sum of RENT $0.00 $0.00 1 1 121st Street Storm Improvement Elliptical End Sections 17048 2 SUBCONTRACTS Date SUBCONTRACT SUB CITY SUB U/M SUB U/P SUB AMT SUB MU 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $2,058.10 TOTAL MU $287.47 BONDS/INSURANCE $17.59 TOTAL $2,363.16 UP $1,181.58 CALUMET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE OTY 121st Street Storm Improvement 14"x 23"Elliptical Pricing 17048 32 . LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE DT RATE LABOR AMT LABOR MU Operator 103 16 ST $56.55 $75.72 $89.81 $904.80 $180.96 Laborer 16 ST $41.17 $54.23 $67.29 $658.72 $131.74 Foreman 8 Sl $57.68 $77.40 $92.05 $461.44 $92.29 Sum of LABOR $2,024.96 $404.99 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU Loader Volvo L6OF-323 8 $93.75 750 $90.00 Excavator Cater31.4D-13 8 $66.73 533.84 $64.06 Pick-up Chevr 2500-620 8 $15.45 123.6 $14.83 Sum of Equipment $1,407.44 $168.89 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU Dump Fees 5 FA $80.00 400 $48.00 14x23 Elliptical 37 I FT $50.15 1604.8 $192.58 Sum of MATERIAL $2,004.80 $240.58 Lq/ or 121st Street Storm Improvement 14"x 23"Elliptical Pricing 17048 32 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU Dump Truck 8 $98.00 $784.00 $94.08 Sum of RENT $/84 00 $94.08 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $6,221.20 TOTAL MU $908.54 BONDS/INSURANCE $53.47 TOTAL $7,183.21 UP $224.48 121st Street Storm Improvements Shoopman Property Changes 17048 1 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 0 0 $0.00 $0.00 $0.00 Sum of RENT $0.00 $0.00 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 0 $0.00 0 I Sum of SUBCONTRACTS $0.00 $0.00 I TOTAL COST $1,233.99 TOTAL MU $196.65 BONDS/INSURANCE $10.73 TOTAL $1,441.37 UP $1,441.37 HWV ENGINEERING Confidence in the built environment. 135 N. Pennsy! ania.Suite 2800 Irdianapolis. Indiana 46204 www.hwcengineering.com LETTER OF TRANSMITTAL TO: Mr. Jeremy Kashman DATE: 8/15/2018 City of Carmel, Engineering RE: 16-SW-74 121ST Street Stormwater One Civic Square Imp. Carmel, IN 46032 HWC#: ATTN: Mr. Bradley Pease FROM: David Lancet WE ARE SENDING YOU: COPIES DATE NO. DESCRIPTION 1 7/31/18 ; 01 CO #1 - Various EWA Items - see CO explanations REMARKS: Contained herein is Change Order No. 1 - Various EWA items required to construct the project to the intent of the plans. CO will be covered in cost by project item under runs. CITY OF CARMEL ENGINEERING DEPARTMENT Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 08/15/18 Re: C.O.#1 121st Street Stormwater Imp Project 16-SW-74 Doug, please find attached 1 original of same change order for project #16-SW-74 121st Street Stormwater Imp. Please review&initial for the next BPW Meeting. Change Order #1- Original Contract Amount: $178,700.00 Increase: $20,053.61 New Contract Amount: $198,753.61 Thank you, Lisa Scott • Page 1