Loading...
HomeMy WebLinkAbout12.. O » W Fri 0 BRICK VENEER--, r—GARAGE DOOR x 5'-O" FOUNDATION LAYOUT SCALE: 1/4" = I'-0" 2180 S.F. WOOD OPENir DROP POUR W/ IN W, POUREI FOUNDATION DETAIL o GARAGE OPENING SCALE: 1/2" = i'-0" SLAB FOUNDATION WALL LINTEL DETAIL FOR 5ASEt" LENT SCALE: 1/4" = 1'-0" GENERAL FOUNDATION NOTES: C.M.U. >CK WALL 1) ALL SOIL IS BASED ON 2800 P.S.F., AND CONCRETE IS BASED ON 2800 P.S.I. IN 28 DAYS, FOOTERS ARE 1(p" WIDE AND 8" DEEP UNLESS NOTED OTHERWISE ON PLANS. 2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS * CRAWL SPACE OR SLAB BELOW FROST LINE AS REQUIRED. 3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE FOR THEMSELVES, THE SUITABILITY OF THE PLANS IN RELATIONSHIP TO THE BUILDING SITE, AND EXISTING GRADES. 4) THESE DRAWINGS SERVE SA A GUIDE TO THE CONSTRUCTION OF THE BUILDING, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY CAN ONLY BE A GUIDE, AND IN NO WAY DICTATE ANY OF THE LOCAL AND/ OR STATE BUILDING CODES. IT IS THE CONTRACTORS FULL RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ERRORS IN DESIGN, DIMENSIONS OR OMISSIONS, 5) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED, AND MAY CHANGE AT ANY TIME, IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT SHOWN. 6) ALL WINDOW SIZES LISTED ARE BASED ON "CARAOCO" SIZES, UNLESS NOTED OTHERWISE, AND MAY VARY BASED ON SUPPLIER, ALL FINISHES AND ROUGH OPENINGS MUST BE VERIFIED BY OWNER/ CONTRACTOR. 1) ALL WALLS W/ BRICK ARE 1-1/2 ALL OTHERS TO BE 3-1/2" UNLESS NOTED OTHERWISE ON PLANS. 8) ALL CEILINGS ARE 9' MAIN LEVEL AND 8' UPPER LEVEL OR AS NOTED ON PLAN FOR GIVEN AREA. W ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR IMMEDIATELY BEFORE CONSTRUCTION IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN. z 0 H x 0 Q Q Q ►10 9 "- ql- I tt-'.01 601 W2 WK R i 1 DATE: 0l -06-0I 1 1 DRAWN 5Y: J.HOLLEY 1 1 SCALE: AS SHOWN 1 REVISIONS: 01 -II -01: PRELIMINARY PLANS 01-23-01: FINAL PLANS FOUNDATION PLAN SHEET 3 a Lu z 4 z0 p O� W w o > Lu oAaWft u- Zul� o OQ�I> F Q iu Q �N m Q (�Qzz z 0-O o z a di 0 Lu uiw2- I-- A w o O a> UJI I -- o �QpLuu �Q=N u LalzU ��ozu z 0 H x 0 Q Q Q ►10 9 "- ql- I tt-'.01 601 W2 WK R i 1 DATE: 0l -06-0I 1 1 DRAWN 5Y: J.HOLLEY 1 1 SCALE: AS SHOWN 1 REVISIONS: 01 -II -01: PRELIMINARY PLANS 01-23-01: FINAL PLANS FOUNDATION PLAN SHEET 3