Loading...
HomeMy WebLinkAboutGN001 - 94NSEE ELEV. FOR SIZE VENTED SOFFIT SEE ELEV. FOR SIZE R-38 INSULATION BOTTOM TRUSS CHORD SIDING 7/16" ROOF DECKING ROOF SHINGLES PROVIDE 2" CLEARANCE FOR INSULATION SEE ROOF PLAN 12" 1/2" DRYWALL 2x4 STUD WALL AT 16" O.C. BRICK VENEER 7/16" ZIP SHEATHING SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT 3/4" DECKING SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT 3/4" DECKING 2x4 SILL PLATE 1/2" DRYWALL R-15 INSULATION SEE ELEVATION FOR WALL HEIGHTSEE ELEVATION FOR WALL HEIGHT METAL TIE THROUGH WALL FLASHING R-10 VINYL FACED BATT INSULATION DOWN 4'-0" FROM TOP OF FNDN. WALLNOTE: OFFSET FACE OF STUD 1/2" FROM FACE OF FOUND. WALL WATERPROOFING TYPICAL FOUNDATION WALL: * 8" POURED CONCRETE WALL * SILL ANCHOR BOLTS @ 6'-0" O.C. * 16"X8" CONCRETE FOOTING * #3 STEEL WALL REINFORCING 2" FROM FACE OF WALL * LOOP WIRE REINFORCING 4" CONC. SLAB ON GRADE W/ 6 MIL. VAPOR BARRIER 4" MIN. GRANULAR FILL GRANULAR FILL TO 12" ABOVE TOP OF CONCRETE FOOTING 4" DRAIN TILE 4" DRAIN TILE 1'-4"8"1'SEE ELEVATION FOR WALL HEIGHTSLOPED BRICK ROWLOCK SILL OVERDIG GRADE CONCRETE FOOTER IN UNFINISHED BASEMENT AREAS R-13 BATT INSULATIONBETWEEN JOISTS TYP. W/FIRESTONE RUBBER FLASHING DRIP EDGE FLASHING TYP.1x6 BAND BOARD w/METAL (R-13 IN BASEMENT FINISHED WALLS)PER MFR. @9" D2' - 2" MIN.48" MEZZO F.P. 8" X 8" X 6'-0"L POPLAR BOX MANTLE 9' - 10 1/8"8' - 9 1/2" 1' - 0 5/8"FIRST LANDING R.C. 10"± 7 3/8"RAILING - SEE SPECS.±5'-8" TO WINDOW SILLSECOND LANDINGCEILING HEIGHT TO FRAMING12' - 1 1/8"4x12 ROUGH CEDAR MANTLE FACE BRICK PER SPECS. STEPPED BRICK CORBEL BRICK SOLDIER HEADER 36" FIREPLACE SET ON PLATFORM BRICK ROWLOCK SILL ± 1' - 6"PER MFR.1'-0" MIN.CUSTOMER: PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood Building Co., LLC 317.669.6300 32 First Street NE Carmel, IN 46032 www.wedgewoodbc.com Copyright c 2015 Wedgewood Building Co. LLC. 6/22/2018 11:07:39 AM ID1 The Broach Residence The Broach Residence 141 UTE DRIVE, CARMEL, IN 46032 INTERIOR ELEVATIONS AND DETAILS ABL 3/4" = 1'-0" 1 TYPICAL WALL SECTION GENERAL NOTES: 1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL. Rev.No. Date Description 1/2" = 1'-0"2 GREAT ROOM FIREPLACE 3/4" = 1'-0"4 STAIR SECTION 1/2" = 1'-0"3 LANAI FIREPLACE By Andrew Lund at 11:09 am, Jun 22, 2018 07/30/18 Mike Sheeks