HomeMy WebLinkAboutS003 - 94NHBHB42" V.2/6‐6/8SINK ROUGH-IN ONLY
UP 6R
UP 4 RUP 6 R
2/8‐6/8
BEDROOM #3
GAMES
PUBLIC
AREA MEDIA
MECHANICAL/
UNFINISHED
STORAGE
BATH #3
36" H. BAR TOP
42" H. WALL w/CAP
13'-4" x 15'-6"
16'-0" x 15'-4"
14'-0" x 14'-0"14'-8" x 14'-0" 8'-0" CLG.1/6‐6/82/4‐6/82‐2/6‐6/82/6‐6/8
DUCT CHASE ABOVE
DROPPED MECHANICAL
BULKHEAD
DRYWALL WRAPPED
DROPPED BEAM
EXTENSION OF
MECHANICAL
BULKHEAD
4040 GW
4040 GW
ROCKWELL
RETAINING
ROCKWELL
RETAINING
4" RECESSED SLAB
WS R.I.
W.H.
FURNACE
EJECT
SUMP
AREA DRAIN
AREA DRAIN
CUSTOMER:
PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood
Building Co., LLC
317.669.6300
32 First Street NE
Carmel, IN 46032
www.wedgewoodbc.com
Copyright c 2015 Wedgewood Building Co. LLC. 6/22/2018
11:07:35 AM
A9
The Broach Residence
The Broach Residence
141 UTE DRIVE, CARMEL, IN 46032
BASEMENT FLOOR INTERIOR FINISH ABL 1/4" = 1'-0"1 BASEMENT INTERIOR FINISH PLAN
FINISH PLAN NOTES:
1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.
Rev.No. Date DescriptionBy Andrew Lund at 11:09 am, Jun 22, 2018
07/30/18
Mike Sheeks