Loading...
HomeMy WebLinkAbout61 M100 First Floor Mechanical Plan - AE4 C S4 t I 8• SPIRAL FLUS WITH it FOR VESRBIULE 0 y 4 OVE'I - -j1 Ili Ili 1\I So ll C710 8• SPIRAL WITH WALL VESTIBULE F?! Hyl1 n S F7 � �u Ns• 30' RTU 3: 18 TON RTU 4: 18 TON 12' 12' 8' 30' 30' 12* 18• 12' 12' 18' ff- S4- 54 `s S4 S4 I t� �6 12• i 1 I n n n 11 N 'J V;1 g 28 28 1 u u l I 1s' 1Y 18' fY S4 S4 : S4 II S4 S4 � I � I NOTE: ALL VENTS TO FNCE DOWN IN D T) SHOWROOM NOTE: ALL VENTS TO FACE DOWN IN SHOWROOM I I 18' 12* te• 12* t120 1 Z -o II C70 ca �-n z -m I 14' 14' 14' S4 S4 S4 S4 S4 It InI U U x 1s• 1s• I I I 12' 12' 12' '12m 18' 12' 18' 100 S4 S4 S4 24'x8'S1TYP. (12) 2404' TYP. (12) Li I ----- x10 u u Tru RTU 2 10 TON - 10 TON = " 24 -I �S�" l ; , 36'x8" TTP. keg S4 S4 S4 12• S4 140 1 140 1s' `---T 18' E ---a `---a 240 `---' I O O O O O OI 3602 INSTALL MESH SCREEN OR METAL COVER OVER THE EXISTING OPENING EF#5 4' COMBUSTION AF 4• VENT THRU ROOF THRU ROOF 38'x6' TYP. 38•x8' TYP. (10) I 4• COMBUSTION AIR THRU ROOF LEGEND OT THERMOSTAT © HUMIDISTAT IMPORTANT NOTE SEE PAGE M104 FOR RTTI SCHEDULE, HEATER SCHEDULE, MAKE-UP AIR SCHEDULE, @ AIR DEVICE SCHEDULE AIR 24• 4' VENT THRU ROOF 4' MECHANICAL NOTES MATCHUNE "A" - SEE SHEET M101 FOR CONTINUATION 4' COMBUST104AIR THRU SDEW 4' VENT THRU_4 _ `ROOF -----0 EF#5 7 -0 EF#6 i T RH-3a COMBUST AIR THRU _ _ _ \ THRU SIDEW 4• comBil AIR THRU SIDEW 4• VENT THRU ROOF THESE DOCUMENTS HAVE BEEN PREPARED IN ACCORDANCE WITH THE 2012 INDIANA BUILDING CODE - MECHANICAL PROVISIONS FOR BUILDING AND MECHANICAL CODES. CONTRACT DRAWING ARE DIAGRAMMATIC, INTENDED TO CONVEY SCOPE OF WORK, AND SHOW GENERAL ARRANGEMENT OR EQUIPMENT AND SERVICES, FIELD VERIFY DIMENSIONS AND EXISTING CONDITIONS PRIOR TO EXECUTION OF WORK. REFER TO DETAILS AND SCHEDULES FOR ADDITIONAL INFORMATION OR REQUIREMENTS. DO NOT SCALE DRAWINGS. MECHANICAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL AND EQUIPMENT FOR THE COMPLETION AND OPERATION OF ALL SYSTEMS IN THIS SECTION OR WORK. SUBMIT PRODUCT DATA OF ALL MECHANICAL EQUIPMENT FOR APPROVAL PRIOR TO PURCHASE. ALLOW AT LEAST TWO WEEKS FOR APPROVAL PROCESS AFTER SUBMITTAL. COORDINATE MECHANICAL WORK WITH OTHER TRADES TO AVOID CONFLICTS. COORDINATION MUST OCCUR PRIOR TO PURCHASING OR INSTALLING EQUIPMENT AND MATERIALS. INSTALL DUCTWORK AND ACCESSORIES IN SUCH A MANNER FOR EASE OF BALANCING AND SERVICE. (FIELD VERIFY) EQUIPMENT SCHEDULES ARE PROVIDED FOR INFORMATION PURPOSES AND SUPERSEDED BY SHOP DRAWINGS. REFER TO SHOP DRAWINGS FOR MANUFACTURES INSTALLATION AND OPERATION INSTRUCTIONS, AND PERFORMANCE CRITERIA. A SET OF CONSTRUCTION DRAWINGS SHALL BE MAINTAINED AT HE JOBSITE TO BE USED TO DOCUMENT DATA, INCLUDING BUT NOT LIMITED TO LOCATIONS AND EQUIPMENT SCHEDULES. TRENCHING, SAW CUTTING, CORING, FLASHING OF STRUCTURAL WORK IS BY OTHERS. STRUCTURAL STEEL FRAMING AND SUPPORTS SHALL PROVIDE NECESSARY SUPPORT WITH A MINIMUM CLEARANCE OF M' IN ALL DIRECTIONS. METAL DUCTWORK SHALL COMPLY WITH 2012 INDIANA BUILDING CODE - MECHANICAL SECTION 603 AND SMACNA STANDARDS, ASHRAE INSTALLATION HANDBOOK AND OTHER APPLICABLE STANDARDS, ALL METAL DUCTWORK SHALL BE GALVANIZED. WRAP ALL TRUNK DUCTWORK WITH A MINIMUM 1 1(c" FOIL FACED INSULATION. ROUND DUCT INDICATED IN OPEN AREAS SHALL BE UNINSULATED SPIRAL DUCTWORK WITH GASKETED FITTINGS. (SIMILAR TO EASTERN SHEET METAL). INSULATED FLEXIBLE DUCTWORK IS ALLOWED AT BRANCH DUCTS TO DIFFUSERS AND SHALL NOT EXCEED 5' IN LENGTH. PROVIDE VOLUME DAMPERS ON ALL BRANCH DUCTS TO DIFFUSERS AND NOT MORE THAN 5' ABOVE CEILING. PROVIDE AIRFOIL TYPE TURNING VANES IN ALL SQUARE ELBOWS. VENTILATION AIR SHALL BE PROVIDED TO THE FACILITY IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2012 INDIANA BUILDING CODE - MECHANICAL SECTION 401 ALL SUPPLY OR EXHAUST RUN -OUT SHALL BE EQUAL TO THE AIR DEVICE NECK SIZE. ALL EXPOSED DUCTWORK TO BE SUPPLIED WITH PAINT -GRIP FINISH. SEE ARCHITECTURAL DRAWINGS FOR LOCATION OF EXPOSED DUCT WORK TO BE PAINTED. INSULATION ON DUCTWORK LOCATED OUTSIDE THE BUILDING ENVELOPE SHALL BE WEATHER AND WATERPROOF, AND BE INSULATED PER INDIANA ENERGY CODE. COVERINGS, LININGS, INSULATIONS AND ADHESIVES INSTALLED UNDER THIS CONTRACT SHALL MEET THE FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPMENT RATING OF 50 PER ATME EST THICKNESS OF INSULATION SHALL BE IN ACCORDANCE WITH THE 2012 INDIANA BUILDING CODE - MECHANICAL SECTION 604, INSTALL HVAC EQUIPMENT PER MANUFACTURES REQUIREMENTS. INSTALL FILTERS DURING CONSTRUCTION AND REPLACE WITH NEW FILTERS AT TIME OF TEST AND BALANCE AND WHEN BUILDING IS TURNED -OVER TO OWNER. MAINTAIN MINIMUM 10' SEPARATION BETWEEN ANY AND ALL OUTDOOR INTAKES AND EXHAUST, PLUMBING VENTS, ETC. THERMOSTATS SHALL BE MOUNTED 48" ABOVE FINISHED FLOOR IN ACCORDANCE WITH THE AMERICAN DISABILITIES ACT REQUIREMENTS. MAINTAIN 42" OF WORK SPACE CLEARANCE IN FRONT OF ALL SERVICE PANELS. WORK SPACE SHALL PERMIT HINGED SERVICE PANELS TO WING OPEN AT LEAST 90 DEGREE. WHEN RETURN AIR IS DRAWN THROUGH A PLENUM CAVITY, THE PLENUM SHALL BE CONSIDERED A "NON-COMBUSTIBLE PLENUM", FREE OF COMBUSTIBLE MATERIALS IN ACCORDANCE WITH THE 2011 OHIO BUILDING CODE - MECHANICAL SECTION 602 FIRE RATED FLOOR AND WALL PENETRATIONS SHELL BE FIRE STOPPED WITH APPROVED MATERIALS MEETING THE TESTING REQUIREMENTS OF ASTM E814, OR IN ACCORDANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION, FOR THE REQUIRED RATING OF THE STRUCTURE. GAS PIPE SHALL BE ASTM A 53 SCHEDULE 40 CONTINUOUS WELD OR SEAMLESS PIPE. ALL FITTINGS INSTALL ON GAS PIPING INSTALLED IN AL PLENUM SPACE SHALL BE BUTT WELDED. ALL FITTING 2" AND SMALLER SHALL BE THREADED BLACK MALLEABLE FITTINGS. ALL FITTING 2 X" AND LARGER SHALL BE BUTT WELDED. GAS PIPING 2 Y2" AND LARGER SHALL BE WELDED PIPING 2" AND UNDER SHALL BE THREADED. PRESSURE TEST PIPING IN ACCORDANCE WITH THE INTERNATIONAL FUEL CODE SECTION 406.1 WITH A KUHLMAN LEAK DETECTOR. PRESSURE TEST TO 30 PSI FOE A MINIMUM OF 30 MINUTES. ALL W AND 1" PIPE HANGERS SUPPORTS SHELL BE SPACE NO MORE THAN 8'-0" APART. ALL OTHER PIPING SUPPORTS SHALL BE SPACED NO MORE THAN 10'-0" APART PER THE INTERNATIONAL GAS CODE SECTION 415.1. PROVIDE AND INSTALL REGULATORS AND SHUT-OFF VALVES ON ALL EQUIPMENT AS A PART OF THE GAS PIPE SYSTEM. BALANCE HVAC SYSTEM TO WITHIN 10% OF AIR QUANTITIES INDICATED AND PROVIDE A COMPLETE TEST REPORT TO OWNER. REVISION i L THIS DRAWINGS THE PN GROUP VERSATILE CONSTRUCTION GROUP LLC \\\\uu /T,/ S4 World Wide Motors 4• T 24• � J7� [� 7 T VERSATILE 1 12' 94' C PURPROJECT DESCRIBED HEREIN. M S4 RELEASED FOR CONSTRUCTION CONSTRUCTION I I ItD =* *_ Hyl1 n S F7 � �u Ns• 30' RTU 3: 18 TON RTU 4: 18 TON 12' 12' 8' 30' 30' 12* 18• 12' 12' 18' ff- S4- 54 `s S4 S4 I t� �6 12• i 1 I n n n 11 N 'J V;1 g 28 28 1 u u l I 1s' 1Y 18' fY S4 S4 : S4 II S4 S4 � I � I NOTE: ALL VENTS TO FNCE DOWN IN D T) SHOWROOM NOTE: ALL VENTS TO FACE DOWN IN SHOWROOM I I 18' 12* te• 12* t120 1 Z -o II C70 ca �-n z -m I 14' 14' 14' S4 S4 S4 S4 S4 It InI U U x 1s• 1s• I I I 12' 12' 12' '12m 18' 12' 18' 100 S4 S4 S4 24'x8'S1TYP. (12) 2404' TYP. (12) Li I ----- x10 u u Tru RTU 2 10 TON - 10 TON = " 24 -I �S�" l ; , 36'x8" TTP. keg S4 S4 S4 12• S4 140 1 140 1s' `---T 18' E ---a `---a 240 `---' I O O O O O OI 3602 INSTALL MESH SCREEN OR METAL COVER OVER THE EXISTING OPENING EF#5 4' COMBUSTION AF 4• VENT THRU ROOF THRU ROOF 38'x6' TYP. 38•x8' TYP. (10) I 4• COMBUSTION AIR THRU ROOF LEGEND OT THERMOSTAT © HUMIDISTAT IMPORTANT NOTE SEE PAGE M104 FOR RTTI SCHEDULE, HEATER SCHEDULE, MAKE-UP AIR SCHEDULE, @ AIR DEVICE SCHEDULE AIR 24• 4' VENT THRU ROOF 4' MECHANICAL NOTES MATCHUNE "A" - SEE SHEET M101 FOR CONTINUATION 4' COMBUST104AIR THRU SDEW 4' VENT THRU_4 _ `ROOF -----0 EF#5 7 -0 EF#6 i T RH-3a COMBUST AIR THRU _ _ _ \ THRU SIDEW 4• comBil AIR THRU SIDEW 4• VENT THRU ROOF THESE DOCUMENTS HAVE BEEN PREPARED IN ACCORDANCE WITH THE 2012 INDIANA BUILDING CODE - MECHANICAL PROVISIONS FOR BUILDING AND MECHANICAL CODES. CONTRACT DRAWING ARE DIAGRAMMATIC, INTENDED TO CONVEY SCOPE OF WORK, AND SHOW GENERAL ARRANGEMENT OR EQUIPMENT AND SERVICES, FIELD VERIFY DIMENSIONS AND EXISTING CONDITIONS PRIOR TO EXECUTION OF WORK. REFER TO DETAILS AND SCHEDULES FOR ADDITIONAL INFORMATION OR REQUIREMENTS. DO NOT SCALE DRAWINGS. MECHANICAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL AND EQUIPMENT FOR THE COMPLETION AND OPERATION OF ALL SYSTEMS IN THIS SECTION OR WORK. SUBMIT PRODUCT DATA OF ALL MECHANICAL EQUIPMENT FOR APPROVAL PRIOR TO PURCHASE. ALLOW AT LEAST TWO WEEKS FOR APPROVAL PROCESS AFTER SUBMITTAL. COORDINATE MECHANICAL WORK WITH OTHER TRADES TO AVOID CONFLICTS. COORDINATION MUST OCCUR PRIOR TO PURCHASING OR INSTALLING EQUIPMENT AND MATERIALS. INSTALL DUCTWORK AND ACCESSORIES IN SUCH A MANNER FOR EASE OF BALANCING AND SERVICE. (FIELD VERIFY) EQUIPMENT SCHEDULES ARE PROVIDED FOR INFORMATION PURPOSES AND SUPERSEDED BY SHOP DRAWINGS. REFER TO SHOP DRAWINGS FOR MANUFACTURES INSTALLATION AND OPERATION INSTRUCTIONS, AND PERFORMANCE CRITERIA. A SET OF CONSTRUCTION DRAWINGS SHALL BE MAINTAINED AT HE JOBSITE TO BE USED TO DOCUMENT DATA, INCLUDING BUT NOT LIMITED TO LOCATIONS AND EQUIPMENT SCHEDULES. TRENCHING, SAW CUTTING, CORING, FLASHING OF STRUCTURAL WORK IS BY OTHERS. STRUCTURAL STEEL FRAMING AND SUPPORTS SHALL PROVIDE NECESSARY SUPPORT WITH A MINIMUM CLEARANCE OF M' IN ALL DIRECTIONS. METAL DUCTWORK SHALL COMPLY WITH 2012 INDIANA BUILDING CODE - MECHANICAL SECTION 603 AND SMACNA STANDARDS, ASHRAE INSTALLATION HANDBOOK AND OTHER APPLICABLE STANDARDS, ALL METAL DUCTWORK SHALL BE GALVANIZED. WRAP ALL TRUNK DUCTWORK WITH A MINIMUM 1 1(c" FOIL FACED INSULATION. ROUND DUCT INDICATED IN OPEN AREAS SHALL BE UNINSULATED SPIRAL DUCTWORK WITH GASKETED FITTINGS. (SIMILAR TO EASTERN SHEET METAL). INSULATED FLEXIBLE DUCTWORK IS ALLOWED AT BRANCH DUCTS TO DIFFUSERS AND SHALL NOT EXCEED 5' IN LENGTH. PROVIDE VOLUME DAMPERS ON ALL BRANCH DUCTS TO DIFFUSERS AND NOT MORE THAN 5' ABOVE CEILING. PROVIDE AIRFOIL TYPE TURNING VANES IN ALL SQUARE ELBOWS. VENTILATION AIR SHALL BE PROVIDED TO THE FACILITY IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2012 INDIANA BUILDING CODE - MECHANICAL SECTION 401 ALL SUPPLY OR EXHAUST RUN -OUT SHALL BE EQUAL TO THE AIR DEVICE NECK SIZE. ALL EXPOSED DUCTWORK TO BE SUPPLIED WITH PAINT -GRIP FINISH. SEE ARCHITECTURAL DRAWINGS FOR LOCATION OF EXPOSED DUCT WORK TO BE PAINTED. INSULATION ON DUCTWORK LOCATED OUTSIDE THE BUILDING ENVELOPE SHALL BE WEATHER AND WATERPROOF, AND BE INSULATED PER INDIANA ENERGY CODE. COVERINGS, LININGS, INSULATIONS AND ADHESIVES INSTALLED UNDER THIS CONTRACT SHALL MEET THE FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPMENT RATING OF 50 PER ATME EST THICKNESS OF INSULATION SHALL BE IN ACCORDANCE WITH THE 2012 INDIANA BUILDING CODE - MECHANICAL SECTION 604, INSTALL HVAC EQUIPMENT PER MANUFACTURES REQUIREMENTS. INSTALL FILTERS DURING CONSTRUCTION AND REPLACE WITH NEW FILTERS AT TIME OF TEST AND BALANCE AND WHEN BUILDING IS TURNED -OVER TO OWNER. MAINTAIN MINIMUM 10' SEPARATION BETWEEN ANY AND ALL OUTDOOR INTAKES AND EXHAUST, PLUMBING VENTS, ETC. THERMOSTATS SHALL BE MOUNTED 48" ABOVE FINISHED FLOOR IN ACCORDANCE WITH THE AMERICAN DISABILITIES ACT REQUIREMENTS. MAINTAIN 42" OF WORK SPACE CLEARANCE IN FRONT OF ALL SERVICE PANELS. WORK SPACE SHALL PERMIT HINGED SERVICE PANELS TO WING OPEN AT LEAST 90 DEGREE. WHEN RETURN AIR IS DRAWN THROUGH A PLENUM CAVITY, THE PLENUM SHALL BE CONSIDERED A "NON-COMBUSTIBLE PLENUM", FREE OF COMBUSTIBLE MATERIALS IN ACCORDANCE WITH THE 2011 OHIO BUILDING CODE - MECHANICAL SECTION 602 FIRE RATED FLOOR AND WALL PENETRATIONS SHELL BE FIRE STOPPED WITH APPROVED MATERIALS MEETING THE TESTING REQUIREMENTS OF ASTM E814, OR IN ACCORDANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION, FOR THE REQUIRED RATING OF THE STRUCTURE. GAS PIPE SHALL BE ASTM A 53 SCHEDULE 40 CONTINUOUS WELD OR SEAMLESS PIPE. ALL FITTINGS INSTALL ON GAS PIPING INSTALLED IN AL PLENUM SPACE SHALL BE BUTT WELDED. ALL FITTING 2" AND SMALLER SHALL BE THREADED BLACK MALLEABLE FITTINGS. ALL FITTING 2 X" AND LARGER SHALL BE BUTT WELDED. GAS PIPING 2 Y2" AND LARGER SHALL BE WELDED PIPING 2" AND UNDER SHALL BE THREADED. PRESSURE TEST PIPING IN ACCORDANCE WITH THE INTERNATIONAL FUEL CODE SECTION 406.1 WITH A KUHLMAN LEAK DETECTOR. PRESSURE TEST TO 30 PSI FOE A MINIMUM OF 30 MINUTES. ALL W AND 1" PIPE HANGERS SUPPORTS SHELL BE SPACE NO MORE THAN 8'-0" APART. ALL OTHER PIPING SUPPORTS SHALL BE SPACED NO MORE THAN 10'-0" APART PER THE INTERNATIONAL GAS CODE SECTION 415.1. PROVIDE AND INSTALL REGULATORS AND SHUT-OFF VALVES ON ALL EQUIPMENT AS A PART OF THE GAS PIPE SYSTEM. BALANCE HVAC SYSTEM TO WITHIN 10% OF AIR QUANTITIES INDICATED AND PROVIDE A COMPLETE TEST REPORT TO OWNER. REVISION i L THIS DRAWINGS THE PN GROUP VERSATILE CONSTRUCTION GROUP LLC \\\\uu /T,/ - World Wide Motors SHEET a � J7� [� 7 T VERSATILE IS TPOSOE BEUSED ANDER R ANY�1C. ETDHE O 94' PURPROJECT DESCRIBED HEREIN. cAs � kp fP � Q (� (� 77.� p East 96tH RELEASED FOR CONSTRUCTION CONSTRUCTION =* *_ 3700 Street Subject to compliance with all regulations N GROTTY ITC. Job No. 1]021 Date Stamped 02.25.2018 19700309' —� STA2 OF ac= ?� '� ` EXISTING(B) Indianapolis Indiana 1 at State and Local Codes 1 3 1 570 Tracy Y�y C\V AL E VAAA� AA 1 �' 1 j Drawn By Checked By Scale City of Cannel New WhiEast none 4818410 Ph: 31].535.35]8 Fax: 31 ].535.3581 jot tab 1/6"- ' /111111\\\ �D NLW(A) A CAD FILE: l �Nlt�\W�wW� email: infoOvemetile-Ilc.wm /.� Jv First Floor Mechanical Plan - First 1'1 Mechanical L L t'1 c\17021\m100 1St fwp, mechanical plaa.ewy CFR 1FI BY: e � DATE: 09/10/18