HomeMy WebLinkAbout63 M102 Second Floor Mechanical PlanIMPORTANT NOTE: SEE PAGE M104
FOR RTU SCHEDULE, HEATER
SCHEDULE, MAKE—UP AIR SCHEDULE,
& AIR DEVICE SCHEDULE
REVISION�J7�
�7
1V
T
V LL�TILLj'
VERSATILE
CONSTRUCTION
7� /�
GlVOUPf LLL.le
570 New Sol Trwyl alone Supe610
RR: 31].535.35]8 i 317.531].535.3581 email:
small: infoOvematlle-le-Ilc.wm
THIS DRAWING IS THE PROPER['i
VERSATILE CONSTRUCTION GROUP LLC
UNDEIS R PURPOSE TTO B UO
HAN USED
PROJECT
DESCRIBED HEREIN.
\\pllll//p„
�\\F,NS B T���
ti� Fto
= No. =
* 19STAX OF �`
$Teho� �"�
i @' �m kre of
11111I I III �
-
EXISTING(B)
D,c"�
World Wide Motors
Q (� (� p
3900 East 96th Street
Indianapolis Indiana
f
L_
lv O�
RELEASED FOR CONSTRUCTION
Subject to compliance with all reMations
at State and local Codes
City of Camred
l
�Ntt�\W�wW�
Jae No.
17021
Date Stamped
02.25.2018
Drown By
Checketltab By
51/4'=1' :'
Second Floor Mechanical Plan
CAD FILE:
CERTIFlED BY:
c\17021\mloi 2nd floor memomcol pon.d.0
0 � DATE: 09/10/18