HomeMy WebLinkAbout83 SP101 Building SpecificationsG`S ( OF
SECTION: 15000
MECHANICAL REQUIREMENTS:
A. PLUMBING
SCBPE
Furnish all Tabor, material, equipment and services necessary to complete
nstallation of all waste systems, drainage systems, ventsystems, hot and
cold water systems and all plumbing fixtures shown on the drawings and
herein specified. Fixtures to be American Standard or equal, SPECIAL
REQUIREMENTS
1, ALL WATER LINES INSTALLED TO BE COPPER.
2. ALL WATER LINES TO HAVE SHUT-OFF VALVES IN METER ROOM AND WHERE
ENTERING UNITS.
3. RDDF FLASHINGS TO BE BY ROOFING CONTRACTOR CONTRACTOR.
CODES AND REGULATIONS
Comply with the Indiana Plumbing Code, and the Indiana Energy Conservation
Code or the local codes having jurisdiction in the particular area.
MATERIALS
General All material specified below shall conform to the standards listed
in Table 14-1 of the Indiana Plumbing Cade,
TRENCHES
Plumbing trenches under slabs shall be backflUed with granular material and
compacted to 98%.
SANITARY SYSTEM
Laying Pipe: Establish all flow conditions prior to commencing work In order
to avoid conflicts Contractor will be allowed reasonable variations from
the established grades and elevation of those shown on the plans In order
to meet the final and exact condition.
Vents;
Fixtures shall be vented as indicated on drawings. Vents and soil stacks
Shell be extended through the roof. They shall be terminated 16' above
the roof and flashed with an approved flashing by Dura -last Roofing
Contractor.
Hangers and Supports,
Conform to Chapter 3, Section 3.14 of the Indiana Plumbing Code.
Covering of Work,
No work shall be covered until the required tests have been made and
opproval for cover-up ehas been granted by the Inspector,
Tests
In accordance with Chapter 6, Section 609.4 of the Indlana Plumbing Code,
Sterilizatlon of Water Pipings The Contractor shall flush the entire system
of all Impurities. Additional disinfecting may be required by the local
authority.
B. HEATING AND AIR CONDITIONING
SCDPE
Furnish all labor, material, equipment and services necessary to complete
installation of all heating and a conditioning work and all fan duct work
shown on the drawings and herein specified,
SPECIAL REQUIREMENTS:
1, ALL RTU SIZES AND SPECIFICATIONS LISTED ON THE MECHANICAL PLAN
SHEETS,
2. HEATING CONTRACTOR TO FURNISH AND INSTALL ALL REQUIRED GAS LINES.
3. HEATING CONTRACTOR TO FURNISH AND INSTALL ALL INSULATED DROPS
4. UNITS TO BE EQUIPPED WITH SMOKE DETECTORS.
CODE CDMPLIANCES
Comply with the Indiana Mechanical Code, the Indlana Fuel Gas Code, and the
Indiana Energy Conservation Code, or other local code having jurisdiction in
the particular area,
HEATING EQUIPMENT
General All equipment sholl conform to the requirements of the latest
edition of the Energy Conservation Code, The minimum efficiency rating of
all electric heating and cooling equipment shall meet the requirement of
Table 5032.3 (1 thru 7). The contractor shot( verify that the equipment
prior to submitting his bid.
AIR CONDITIONING EQUIPMENT
General All equipment shall conform to the requirements of the latest
edition of the Energy Conservation Code, The minimum efficiency rating of
all electric heating and caching equipment shall meet the requirement of
Table 5032.3 (1 then 7). The contractor shall verify that the equipment
prior to submitting his bid.
TESTS Each system shall be tested to Insure that the Intent stated above
has been realized, Bonnet temperature and equipment noise level shall be
checked to Insure proper egdpment operation. Air flow at each register
shall be checked to Insure proper and unrestricted air flow through the
duct system. All tests required by the Indiana Mechanical Code shall be
performed.
BACKDRAFT DAMPERS
Air discharge openings through roofs orexterior walls sholl be protected
r
agoinst the entrance of bids, large insoots and foreign
objects. Automatic louversor backdraft dampers sholl be provided on
other than attic ventilators to prevent a reverse flow of or when the
Pan is not In operation.
a#y18�1ae11Y9fUR
CONTRACTOR TD FURNISH STATE APPROVED DRAWINGS
SCOPE
Furnish all labor, material, equipment and services ne e
ary to complx
nstallation of fire protection system as shown on thedrawings and herelr
specified,
CODE CDMPLIANCES
Comply with the Indiana Fire Code, IBC, or other local code hi
jurisdiction In the particular area.
SPECIAL REQUIREMENTS
Flow Indicater to be installed on Sprinkler Systems Riser for connection
alarm bell
Tests:
In accordance with Chapter 9of the Indiana Fire Code and Chapter 9 of
the International Building Code.
SECTION: 16000
ELECTRICAL REQUIREMENTS:
SCOPE
Furnish all labor, material, equipment and services necessary to
install and connect all electrical equipment shown on the drawings
and specified in these specifications.
SPECIAL REQUIREMENTS
1. ALL WIRING SHALL TO BE 412 MINIMUM COPPER.
2. ALL ELECTRIC SERVICE INFORMATION TO BE CDDRDINATED WITH LOCAL
UTILITY REQUIREMENTS,
3, ALL ELECTRIC PANELS TO BE EQUIPED WITH BUILT IN COPPER BUSS TYPE,
4, ALL CONDUITS TO BE STRAPPED OR CLAMPED ACCORDING TO NEC AND
ALL BENDS TO BE MADE WITH APPROVED BENDERS.
5, ALL JUNCTION BOXES ARE TO HAVE COVERS INSTALLED AND CIRCUITS
CONTAINED INSIDE TO BE MARKED ON COVER.
6, ALL RECEPTACLES TO BE 18' TO CENTER AFF, UNLESS OTHERWISE NOTED.
7, NO MORE THAN FIVE (5) RECEPTACLES SHALL BE ALLOWED ON ANY
ONE (U CIRCUIT,
8, ALL PANELS SHALL HAVE TYPED IDENTIFICATION LABELS FOR ALL CIRCUITS,
9. A SEPERATE GROUND WIRE SHALL BE PULLED IN ALL CONDUIT RUNS
AND SHALL BE CONTINUOUS THROUGH SYSTEM. (EMT IS NOT AN
ACCEPTABLE GROUND)
10. THERE WILL BE A WATER PIPE GROUND ALONG WITH BUILDING AND POUTER
REBAR GRDUND FOR THE SERVICE,
11. ALL WEATHERPROOF COVERS SHALL BE FLUSH, COVERED AND GASKETED
WITH CORD USEABLE COVERS TO KEEP OUT ANY MOISTURE,
12. ALL ELECTRICAL CONNECTIONS SHALL BE DONE BY APPROVED METHODS.
13. ALL CONDUITS AND WIRING FUR ELECTRICAL SERVICE TO BE FURNISHED
AND INSTALLED PER LOCAL POWER CUMPANYS REQUIREMENTS.
14. TELEPHONE SERVICE CONDUIT TO BE FURNISHED AND INSTALLED BY
SITE CONTRACTOR,
GENERAL
The Instollatlon shall comply with all laws of local regulating
authorities, the regulations of the current edition of the
Indiana Electric Code and with wiring rules of the local
electrical utility company, After completion of work, the
Contractor shall furnish the Owner, a certificate of final
inspection and approval from the local inspection department or
bureau having jurisdiction,
MATERIAL
Prohibited MatericH The use of aluminum wire Is prohibited,
all material shall be new, bearing Underwriter's stamp
of approval
19f133uIPFY711'.
All work shall be executed in a workmanlike manner and shall
present a neat appearance when completed.
Markers: Each meter and its associated switch shall be identified
by number, Each meter and switch shall have a panel.
Sleeves: Passage of conduit through any firewall shall be
provided with pipe sleeves, seal space between and conduit
with fireproof caulking,
PROGRESS OF WORK
The Contractor shall order the progress of this work so as to
conform to the progress of the work of other trades and shall
complete the entire installation as soon as the condition of the
building will permit,
DESIGN LOADINGS:
CONCRETE FLOOR LOADING:
1. All concrete slab Flooring shall be designed forthefollowing loading:
Floor Live Load (uniform): 100 psf
Floor Live Load (concentrated): 1,000 psf
STEEL LOADING:
1. All Steel Framing membershall be designed to r the following loading:
Roof Live Load (uniform): 20 psf
Roof Live Load (concentrated): 300 psf
Roof Snow Load: 20psf= 0.7 Ce Ct I Pg
Pg Gound snow Load: 20psf
WIND LOADING
Basic Wind Speed: 90mph
Importance Factor (I): Category II - 1=1.00
Exposure Catagory: B
Internal Pressure Coefficent (GCpi): ±0.18
Componants and Cladding: 4.7 & -15.8
SEISMIC DESIGN LOADING
Seismic Importance factor: 1=1.0
Occupancy Category: II
Mapped Spectral Response Acceleration (Sg & SI)
Sg= 0.20g
S1= 0.08g
Site Class D
Smg= 0.32g
Sml= 0.19g
Bulge 0.21g
Shc= 0.13g
Seismic Design Category: B
Seismic Base Shear: 71.68 kips
Seismic Response Coefficient: 0.07
Response Modification factor3
Equivalent Lateral Force Procedure used.
REVISION
NVERSATILE\
CONSTRUCTION
GROUP, LLC.
Trudy Rood, Suite 810
570 East T
New Whiteland, Indiana 46154
ell: 317.535.3579 Fax: 317.635.3561
email: 1.535.3579 Fax:
THIS DRAWINGS THE PROPERTY L
VERSATILE CONSTRUCTION GROUP LLC
OTHER PURPOSE BETHE ROJECT\�4,Nt
DESCRIBED HEREIN
\\o\\\wl lYRPLi.
A Bqf, /p/
eeth �No FP
oma 19700309 of
=�q �
�
A /ry i-.
/ /L WX'Fs�.
EXISTING(B)
NEW(A)
World Wide Motors
3900 East 96th Street
Indianapolis, Indiana
a 1,
�� 1 O 1
1 1
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and local Codes
City
Ci of Carmel
Job No.
17021
Date Stamped
..xxx.¢(�
Drawn By
kset
Checked By
tab
Scale:////`AL
1' 0
1J 1lA Specifications
Building Specifications
CAD FILE:
CERTIFIED BY:
c\17021\sprat building spedfkationd.g