HomeMy WebLinkAbout329797 09/10/18 (9,
CITY OF CARMEL, INDIANA VENDOR: 372379
ONE CIVIC SQUARE INLAND WATERS POLLUTION CONTROLgWK AMOUNT: $*****9,516.03*
CARMEL, INDIANA 46032 ETROIT MIG�ANAVE. CHECK NUMBER: 329797
CHECK DATE: 09/10/18
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
651 5023990 2 9,516.03 OTHER EXPENSES
VOUCHER NO. 186382 WARRANT NO. ALLOWED 20 Prescribed by State Board of Accounts City Form No.201(Rev 1995)
Vendor# 372379 IN SUM OF$ ACCOUNTS PAYABLE VOUCHER
Inland Waters Pollution Control Inc CITY OF CARMEL
4086 Michigan Ave An invoice or bill to be properly itemized must show: kind of service,where performed,
Detroit, MI 48210 dates service rendered, by whom, rates per day, number of hours, rate per hour,
numbers of units, price per unit, etc.
Payee
$9,516.03 372379 Purchase Order No.
ON ACCOUNT OF APPROPRATION FOR Inland Waters Pollution Control Inc Terms
Carmel Wasterwater Utility 4086 Michigan Ave Due Date
BOARD MEMBERS
I hereby certify that that attached invoice(s),
Detroit, MI 48210
or bill(s)is(are)true and correct and that
PO# ACCT# the materials or services itemized thereon for DATE INVOICE# Description
DEPT# INVOICE# Fund# AMOUNT which charge is made were ordered and DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
2 01-1420-00 $9,516.03 and received except 8/28/2018 2 $9,516.03
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have audited
same in accordance with IC 5-11-10-1.6
Cost distribution ledger classification if claim paid motor vehicle highway fund. 20_
Clerk-Treasurer
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 PAGE ONE OF TWO PAGES
TO: CITY OF CARMEL, IN PROJECT: APPLICATION NO: TWO DISTRIBUTION TO:
ONE CIVIC SQUARE INVOICE NO: 82100100-2 SUPERIOR
CARMEL, IN 46032 LOWES WAY SEWER LINER
CONTRACT NO. 95 PERIOD TO: 8/10/2018 ENGINEER
CARMEL, IN CONTRACTOR
FROM: INLAND WATERS POLLUTION CONTROL, INC.
4086 MICHIGAN AVE. ENGINEER'S
DETROIT, MI 48210 PROJECT NO:
CONTRACT FOR: DIVISION A-BRICK SEWER REHABILITATION PHASE III CONTRACT DATE: Janua 15,2018
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,information
Application is made for Payment,as shown below,in connection with the Contract and belief the Work covered by this Application for Payment has been completed in accordance
Continuation Sheet,AIA Document G703,is attached. with the Contract Documents,that all amounts have been paid by the Contractor for Work for
which previous Certificates for Payment were issued and payments received from the Owner,
ORIGINAL CONTRACT SUM $ 191,843.33 and that current payment shown herein is now due.
NET CHANGE BY CHANGE ORDERS $ -1,522.76
CONTRACT SUM TO DATE $ 190,320.57 CONTRACTOR: INLAND WATERS POLLUTION CONTROL, INC.
TOTAL COMPLETED&STORED TO DATE $ 190,320.57
(Column G on G703)
RETAINAGE $ 0.00 BY: - DATE: AUGUST 13, 2018
Total in Column I of G703 JEREMYECKLEIN, DIRECTOR OF OPERATIONS
TOTAL EARNED LESS RETAINAGE $ 190,32Q57 1 ,
LESS PREVIOUS CERTIFICATES FOR State of: MICHIGAN County of: WAYNE
PAYMENT $ 180,804.54 Subscribed and sworn to before me this 13TH day of AUGUST, 2018
ub CURRENT PAYMENT DUE $ 9,516.03 Notary Public: JULIE A. LACKEY
i.:
BALANCE TO FINISH,PLUS RETAINAGE =; JJLIF.A.LACKEY
$' 0.00' cry public,State of Michigan
(Line 3 less Line s) My Commission Expires: August 16,2024 f=aun of Wsyne
I y Comrttl5sion�iI 16.,'W4
I Acting in the Cougly,Of'
ENGINEER'S CERTIFICATE FOR PAYMENT
CHANGE ORDER SUMMARY In accordance with the Contract Documents,based on on-site observations and the
Change Orders approved in ADDITIONS DEDUCTIONS data comprising the above application,the Engineer certifies to the Owner that to the
previous months by Owner best of the Engineer's knowledge,information and belief the Work has progressed as
TOTAL indicated,the quality of the Work is in accordance with the Contract Documents,and
Approved'this Month the Contractor is entitled to payment of the AMOUNT CERTIFIED.
To adjust over/under quantities 1,522.76 AMOUNT CERTIFIED
ENGINEER:
BY: DATE• 1aS
TOTALS 0.00 1,522.76 This Certificate is not ne—g—Ot—lare-1 a AMOUNT CERTIFIED is payable only to the
114etch6ngetby Change e Orders -1,522.76 Contractor named herein.Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract,
CONTINUATION SHEET Abi 1)(X'l/AlPNP(;7u3 PAGE TV40 OF TWO PACES
MA D0ew-111 G AJ2,APPLICA FION AND CERTIFICATION FOR PAYMENT,
i,uituch,�tl_ LOWES WAY SEWER LINER APPIACA110NNO TWO
ill l2h,llJ(IOtiS h2IOw amounts ma±taT�.d ,,Ill,catos,d,,Ilh, PERIOD Bit IJNG 108mh 15-Aaguli 10
tje,!t oiuntrt 1011 C,mlracEs whirr variable retaina....c ib,tire Itcnn nlayaljply CONTRACT NO.95 APPLICAl ION DATE A.Lga�,1+-'_018
CARMEL,IN EINGINFER'S PROJF(['NIO
A
ITEM Dl-'S'CKIPTJON OF WORK UNIT EST QTY QUANTI'l'y UNIT PRICE RCIIEDIII-ED WORK CO.'QPL.FrTf-.1) MATERIALS '1`01'Ai,
NO, B-M AN(T WL
TO VALIJ. I RkAl PtU VIC)US 'I'llis N.R1100 PRESUCII), C'()W'LEILD (6 cl 10 1:11JISN
Ing VAP lAltl-1
DX 11: aPwlrarlGryANDSIORED
E. (NOVI., .1 0 f3ATr
D Ok El
Mohllizalioll LS 1 1.00 15,216.67 15.21667, 15,216.67- I(jo%
,50 1-29.44 T 25-888,00 —25134,96 -1-7-25434,90 Q8% 45,3 04 $
2a 27"CIPP Lining 12�96 to 17-76 u 200 196
-7b '157-CIPP—Lilfillg 12-96 1.17-76 LI: 367 302,50 116.32 S 42.(189,44 S $ 12,166 00 S 42.166,00 99% $
523.44
2c 27"CIPP Lining 12-96 to 17-76 LF 287
282,30 116.23 S 33,358.01 1; $ 32,81 L73 1 S 32,811,73 -98q0 $-546-2i'
Polyurethane Coating Manhole 12-96 VF 22,50 2230 79U5 $ 17,780.63 $ $ 17,780.63 S $ 17.780.63 10o% s
36 C6iitmg Manhole 12-96 VIP —25,40 —25 4 0 S 7-5462 -19,16 73 5-
S S 19,167.35 $ $ 19.167,35 100%
3c P01)'uretbalic Coating Manhole 12-96 VF 13.30 13.30 843,08 11,2121)6 $ 11,212,96 $ 11,21296 woo'. $
-i Bypass Polliplog, LS I 11,00 .1.26,53o,27 26,530.27 $ 5 '6,530:'-7 —241 --
5.3(1.27 10() J
To adjust over/under quantities S
2a 27"CIPP Lining 12-96 to 17-76 $
1-1: -3.50 0.00 $ 129,44 (453,04) (453.04) $
27"CIPP Lining 12-96 to 17-76 L17 4.50 0.00 S 116.32 $ (523.44) $ $ 0"N' $ (323,44) S
—2c—T7-CIPPLining 12-)ti l0 174 - .7 6 LF 00 116.23 (54(1.28)8) $, $
0% S (,540 28) $
GRAND TOTALS 190,320,57 190,320 57 $ S
is
190.32()57 106%
AIA DOCUMENT 6703-CONTINUATION SHEET FOR G702- 1992 EDITION AIA-C)1992
THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE.N.W.WASHINGTON,D.C,20006-5292 G703-1992
INLAND WATERS POLLUTION CONTROL, INC. IWPC Job No: 82100100
4086 Michigan Ave.
Detroit, MI 48210-3261
FULL CONDITIONAL WAIVER
I/We have a contract with: CITY OF CARMEL, IN
ONE CIVIC SQUARE
CARMEL, IN 46032
to provide: Labor and/or Materials
for the improvement of the property described as,
LOWES WAY SEWER LINER
CONTRACT NO. 95
CARMEL, IN
Having been fully paid and satisfied, all my/our construction lien rights against subject
property are hereby waived and released.
eremy R lein, Director of Operations
I ND ERS POLLUTION CONTROL, INC.
Signed on:
4086 I,ichigan Ave.
Detroit, MI 48210
(313) 899-3014
DO NOT SIGN BLANK OR INCOMPLETE FORMS.RETAIN A COPY.
I
1
1
i
SWORN STATEMENT
STATE OF MICHIGAN) Invoice: 82100100-2
)SS
COUNTY OF WAYNE ) Project: 82100100
JEREMY RECKLEIN being duly sworn,deposes and says: That INLAND WATERS POLLUTION CONTROL,INC.
is the(contractor)for an improvement to the following described real property situated in County of Hamilton
Indiana described as follows:
LOWES WAY SEWER LINER
CONTRACT NO, 95
CARMEL, IN
That the following is a statement as of August 13,2018 of each subcontractor and supplier and laborer with whom
the(contractor)(subcontractor)has(contracted)(subcontracted)for performance under the contract with the owner
or lessee thereof,and that the amounts due to the persons as of the date hereof are correctly and fully set forth
opposite their names as follows:
Name of subcontractor Type of Total Amount Amount Balance
supplier or improvement Contract Paid Currently to
laborer furnished Price To Date Owing Complete
INLAND WATERS POLLUTION CONTROL,INC MATLS/LABOR 190,321 0 190,321 0
CONCO SPRAY SOLUTION SUBCONTRACTOR 39,340 0 39,340 0
Totals:
190,3211 01 190.321 0.
-WARNING(TO OWNER):AN OWNER OR LESSEE OF THE ABOVE DESCRIBED PROPERTY MAY NOT RELY ON THIS
SWORN STATEMENT TO AVOID THE CLAIM OF A SUBCONTRACTOR,SUPPLIER,OR LABORER WHO HAS PROVIDED
A NOTICE OF FURNISHING(OR A LABORER WHO MAY PROVIDE A NOTICE OF FURNISHING PURSUANT TO SECTION
109 OF THE CONSTRUCTION LIEN ACT)TO THE DESIGNEE OR TO THE OWNER OR LESSEE IF THE DESIGNEE IS NOT
NAMED OR HAS DIED.—
That the contractor has not procured material from,or subcontracted with,any person other than those set forth above and owes
no money for the improvement other than the sums set forth above.
Depondent further says that he or she makes the foregoing statement as the(contractor)(Subcontractor)or as
of the(contractor)(subcontractor)for the purpose of representing to the owner,lessee or mortgagee of the above
described premises and his or her agents that the above described property is free from claims of construction liens,or the possibility of
contruction liens,except as specifically set forth above,and except for claims of construction liens by laborers which may be provided
pursuant to Section 109 of the Construction Lien Act,Act No.497 of the Public Acts of 1980,as amended,being Section 570,
1109 of the Michigan Complied Laws.
Deponent further says that Laborer wages,Fringe Benefits and Withholdings are paid,except:
"`WARNING(TO DEPONENT):A PERSON,WHO WITH INTENT TO DEFRAUD,GIVES A FALSE SWORN STATEMENT
IS SUBJECT TO CRIMINAL PENALTIES AS PROVIDED IN SECTION 110 OF THE CONSTRUCTION LIEN ACT,ACT NO.497
OF THE PUBLIC ACTS OF 1980 AS AMENDED,BEING SECTION 570,1110 OF THE MICHIGAN COMPLIED LAWS.—
Date: August 13,2018 INLAND WATERS P LUTION CONTROL,INC.
By:
Jeremy _ cklein,Director of Operations
Subscribed and sworn before me this a
13TH day of AUGUST,2018
�ie�,c
Notary Public Wayne County,Michigan
My Commission Expires: August 16,2024
JULIE A:Wftl�n
Y
Notary Public,SMichigan
County 6
My CGMITIiSslon e"x .16,2024
Actingintna Counly o