Loading...
HomeMy WebLinkAboutTruss Modification Engineer SketchesJDT 09/13/18 JDT 09/13/18 JDT 09/13/18 JDT 09/13/18 ROOF TRUSS SHEATHING JDT 09/13/18 3. NEW (2) - 2X6 (NAILED TOGETHER) @ TOP AND BOTT. CHORDS CONNECT @ ENDS TO TRUSSES W/ SIMPSON HANGEER. 4. CONNECT TRUSS TO NEW (2) - 2XT @ TOP AND BOTT. WITH SIMPSON HANGER.