Loading...
HomeMy WebLinkAboutUpdated Seno sketchSENO-PLANK 8/31/2018 Page: 1 Main Level Master Bath TLT (1) Up Bath Closet Shower (A1) New shower is being built in the same area as the old. Tub is being removed. Vanity (A2) Vanity is being replaced Recessed light being installed and exhaust fan being replaced. Electric on this wall is being moved. outlets being relocated approx 4' Shower1 (A1) Main Level 9' 2" 9' 10" 10"2' 10"3' 4"2' 2"2' 2"3' 5" 3' 9" 3' 9" 4' 5"4' 11"5' 5"3' 8"3' 5" 9" 6' 7" 7' 3"7' 8"8' 4"2' 9"1' 11" 7'6' 8" 7' 10" 1' 2" 2' 1" 2' 3" 3' 1"3' 1"4' 1" 4' 1" 3'3'3' 6"5' 1" 4' 11"6'1' 7"4' 11"3' 1" 08/31/18 Mike Sheeks