HomeMy WebLinkAboutA0037'-11 3/8"3'-2 1/8"2'-9 3/4" 1'-11" 3'-1"3'-0"1"1"4'-6 5/8" 3'-0"4'-6" 4 1/2"3"2'-0"6"5'-4 3/8"7'-6 1/16"
1'-3"5'-0"1'-3 1/8"
5'-7"
16 SQ FT
20 SQ FT
63 SQ FT
MASTER BATH
WATER CLOSET
SHOWER 8-B8-B
8-C8-C
8-D8-D
8-A8-A
6-A6-A
6-B6-B
7-A7-A
7-B7-B
CEILING HEIGHT: 8'-0"
NOTES PROPOSED:
F/I NEW 2x4 FRAMING, EXTERIOR SHEATHING, WOOD
SIDING, & BATT INSULATION TO MATCH EXISTING FOR NEW
WINDOW ROUGH OPENING
FRAME FOR NEW 2x4 WATER CLOSET WALLS; PROVIDE
NEW DOUBLE 2x8 HEADER FOR NEW WINDOW
FRAME FOR NEW 2x4 SHOWER PLUMBING WALL; ADJACENT
TO EXISTING CLOSET WALL
FRAME 2x4 HALF WALL FOR NEW SHOWER ENCLOSURE &
REDUCED SHOWER THRESHOLD; 44" TALL HALF WALL,
FRAME NICHE INSIDE HALF WALL, 24" x 12"
F/I NEW 2x6 CEILING JOISTS IN WATER CLOSET; DROP
CEILING IN NEW WATER CLOSET TO 8 FT
F/I (1) 60" x 18" VINYL FIXED GLASS WINDOW IN SHOWER
ENCLOSURE
F/I NEW 1/2" DRYWALL ON NEW WALLS & CEILINGS; PATCH
DRYWALL AT OTHER LOCATIONS AS NECESSARY
INSTALL EXISTING POCKET DOOR & NEW FRAME TO WATER
CLOSET
ENSURE VENTING TO EXTERIOR FOR NEW EXHAUST FAN &
SHOWER CAN FAN
F/I NEW SHOWER FIXED GLASS PANEL & OIL RUBBED
BRONZE SHOWER HARDWARE ON HALF WALL
ROUGH IN FOR NEW PLUMBING SUPPLY LINES FOR SINKS &
SHOWER
F/I NEW SUPPLY LINES & DRAINS FOR SINKS
F/I NEW PLUMBING SUPPLY LINES FOR SHOWER FIXTURES
F/I NEW TOILET
F/I NEW TILE FLOORING & UNDERLAYMENT; 12x24 OLIMPIA
VANIGLIA 1/2 BRICK LAY; SEE PLANS FOR DIRECTION
F/I NEW BASE & SHOE MOLDING TO MATCH EXISTING
F/I NEW CUSTOM SHOWER MUD PAN & BACK OF NICHE;
MATTE WHITE HEX TILE; CENTER DRAIN IN SHOWER
F/I NEW SHOWER WALL TILE; 12 x 24 OLIMPIA VANIGLIA 1/2
HORIZONTAL BRICK LAY, TRIM WITH OIL RUBBED BRONZE
"L" STICK
F/I NEW ACCENT TILE ON SHOWER WALLS; LUNADA BAY
ORIGAMI CETARA VESPER PEARL
F/I NEW SHILOH SEAGULL VANITY CABINETS & HARDWARE;
TBD
F/I NEW CAMBRIA PRAA SANDS COUNTERTOPS; PIEDMONT
EDGE PROFILE, WALL CAP, NICHE CAP, & THRESHOLD;
EASED EDGE
F/I NEW SHOWER HEAD, HANDHELD, VALVE, & DIVERTER
F/I NEW SINK & FAUCET AT EACH VANITY
F/I NEW BATHROOM ACCESSORIES; (2) TOWEL RINGS, (1)
TISSUE HOLDER, (3) ROBE HOOKS, & (1) GRAB BAR; TO BE
SITE VERIFIED BY HOMEOWNERS
F/I NEW BEVEL FRAMED MIRRORS & LIGHT FIXTURES AT
EACH VANITY
WALL TYPES
EXISTING WALLS
DEMO WALLS
NEW WALLS
ATTIC WALL WITH INSULATION
#1
of
17
Date:
07.20.18
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.DeMeester ResidenceBathroom RemodelGary & Debbie DeMeester1385 Stoney Creek CircleCarmel, Indiana 46032Approved By:
Date:
PROPOSED PLAN
SCALE: 5/8" = 1'3
FINAL
#5
#2
#3
#4
08.21.18
07.27.18
07.30.18
08.13.18
Katie Kramer
Designer
kkramer@caseindy.com
Jessica Seljan
Lead Designer
jseljan@caseindy.com
09/06/18
Adam Schriner