Loading...
HomeMy WebLinkAboutA0107'-11 1/2"2'-1 3/4" 2'-9" 7'-11"2'-7" 5"2'-0 3/4" 2'-7 1/4" 3'-3" 2'-9" 2'-4 3/8"5'-2"55 SQ FT BATH CEILING HEIGHT: 8'-1/8" 11-A11-A NOTES PROPOSED: F/I NEW DRYWALL AT AREAS OF REMOVED BULKHEAD PAINT EXISTING VANITY CABINETS F/I NEW CORETEC FLOORING & UNDERLAYMENT F/I NEW BASE & SHOE MOLD F/I NEW ACRYLIC TUB/SHOWER UNIT & CURTAIN ROD; SHOWER CURTAIN PROVIDED BY HOMEOWNER F/I NEW SHOWER FIXTURES F/I (2) NEW SINKS & FAUCETS AT VANITY F/I NEW MIRROR & VANITY LIGHT FIXTURES; FRAME W/ 1x4 MATERIAL ENSURE VENTING TO EXTERIOR FOR NEW EXHAUST FAN PRIME & PAINT WALLS, CEILING, TRIMS, DOORS, CASINGS, BASE & SHOE #1 of 17 Date: 07.20.18 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.DeMeester ResidenceBathroom RemodelGary & Debbie DeMeester1385 Stoney Creek CircleCarmel, Indiana 46032Approved By: Date: 10 FINAL #5 #2 #3 #4 08.21.18 07.27.18 07.30.18 08.13.18 Katie Kramer Designer kkramer@caseindy.com Jessica Seljan Lead Designer jseljan@caseindy.com PROPOSED PLAN SCALE: 7/8" = 1' 09/06/18 Adam Schriner