Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M001.0
ProductsPlotID Length ProductPlies Net QtyFJ1 28-00-00 11-7/8" BCI® 5000s-1.8 1 2FJ2 26-00-00 11-7/8" BCI® 5000s-1.8 1 1FJ3 24-00-00 11-7/8" BCI® 5000s-1.8 1 1FJ4 20-00-00 11-7/8" BCI® 5000s-1.8 1 18FJ5 20-00-00 11-7/8" BCI® 5000s-1.8 2 2FJ6 18-00-00 11-7/8" BCI® 5000s-1.8 1 3FJ7 14-00-00 11-7/8" BCI® 5000s-1.8 1 10FJ8 12-00-00 11-7/8" BCI® 5000s-1.8 1 1FJ9 8-00-00 11-7/8" BCI® 5000s-1.8 1 1FJ10 6-00-00 11-7/8" BCI® 5000s-1.8 1 17BM1 6-00-00 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 2 2BM2 14-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 24BM3 10-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 22BM4 6-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2BM5 22-00-00 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 3 3BM6 26-00-00 11-7/8" BCI® 5000s-1.8 1 1BM7 14-00-00 11-7/8" BCI® 5000s-1.8 2 2BM8 6-00-00 11-7/8" BCI® 5000s-1.8 1 1BM9 4-00-00 11-7/8" BCI® 5000s-1.8 1 3BBO1 22-00-00 3-08 x 9-08 Generic Material 1 1Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 9Bk1 60-00-00 11-7/8" BCI® 5000s-1.8 1 1Connector SummaryPlotID Qty Manuf ProductHu1 1 USP SUH410RHu2 1 USP THF20112Hu3 4 USP THF20112Hu4 1 USP THF20925Hu5 9 USP THF20925Hu6 3 USP THF20925Hu7 9 USP THF20925Hu8 28 USP THF20925Hu9 1 USP THF20925BM5BM1BM4BM2BM2BM6BM8BM9BBO1BM7BM3BM9BM9Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Bk1Bk1Ca1FJ9FJ2FJ3FJ8FJ10FJ5Hu2Hu6Hu6Hu1Hu661FJ10Hu8Hu8Hu7Hu8Hu3Hu8Hu5Hu7FJ10FJ6FJ4FJ4FJ4FJ1FJ7Bk1Bk1Bk1Bk1Bk16-101-07-031-07-031-07-031-07-031-07-031-08-151-05-081-07-031-07-031-07-031-07-031-07-031-07-031-07-031-05-031-09-039-031-07-031-07-031-07-031-07-031-07-031-07-131-07-031-07-031-07-0311-091-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-07-031-06-031-03-151-07-031-07-031-07-031-07-031-07-031-07-031-06-03Sheet: 1/1DWG:Order #:By:Date: 8/3/2018Scale: NTSBC FRAMER1808001629 The Grove at LegacySecond FloorNOTE:ALLMEASUREMENTSTO BE VERIFIEDIN THE FIELD.Revisions:BY:cut, notch or drill flangesDO NOTDN01above to bearing below.Solid block all posts fromF0810-10d nails.Nail withFiller block.Install tight to top flange.mount hanger load exceeds 250 lbs.Backer block required where topBacker block (12" wide min.)Nail with 10- 10d nails.Install tight to top flange.Joist hangerF10NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FORDETAILS NOT SHOWNAll I- Joists and Versa-Lam BeamsMust Be Installed per TheBoise Cascade Installation Guide!-----------------------------Todo yo- los Rayos de Viguetas yVersa-Huída Deben Ser Instaladospor La Guía de la Instalación deCascada de Boise!FOR MULTIPLE PLY BEAMCONNECTION SEE THE"CONNECTION DIAGRAM"SUPPLIED WITH JOB PACKAGE